Loading...
HomeMy WebLinkAboutDRC-2011-005892 - 0901a06880234124Page 1 of 1 Thomas Rushing ii - Re: DUSA Nitrate Plume Phase 1 & Phase 2-5 Woric Plan Retviews; Task Order Work Authorization (UTll.1102.002 Contract) From: Thomas Rushing ii To: Robert_D_Baird@URSCorp.com Date: 5/24/2011 7:48 AM Subject: Re: DUSA Nitrate Plume Phase 1 & Phase 2-5 Work Plan Reviews; Task Order Work Authorization (UTll.1102.002 Contract) CC: Lundberg, Rusty; Morton, Loren Attachments: URS Rev 3 Work Order.pdf Bob, y fl U A copy of the work authorization, signed by Rusty, is attached. Let me know if you have concerns, etc. Tonn Tom Rushing, P.G. Utah Division of Raid iation Control (801) 536-0080 (801) 533-4097 trushinq(5)utah.qov >>> <Robert_D_Baird@URSCorp.com> 5/19/2011 1:01 PM >>> Tom: Please find attached our form to authorize addition of new funds to an existing task order. This simply authorizes URS to bill against the funds DUSA has committed to cover ($14,209). This is similar to the form we provided you back in March for the first stage of the Nitrate Plume work (authorized $17,704). This authorization will bring the total authorized for work on Nitrate Plume to $31,913. Please request Rusty to sign this form, then return it to me so we can obtain URS' signature. Once both parties have signed, we will return a copy for your files. Please call if you have any questions or required clarification. Robert D. Baird, PE 756 East Winchester Street, Suite 400 Salt Lake City, Utah 84107 Tel: 801-904-4122 Fax: 801-904-4100 Cell: 801-913-2178 robert._d_baird @ urscorp.com robert.baird@wsms.com roviba@earthlink.net This e-maii anci any at! recipieiit. you snould n contain URS Corporation confidential irrtormattoii lhat istabij-e, disciase or usa any o; tnis infoimation and •••;-. I piopnetary or pnvifeged. ir you receive Vras rness^aoe :n e/ror or are nor llie intends Id oestroy ii^e e-n^aM and anv attaciimenis or cooies. file://C:\Documents and SeUings\TrushingVLocal Settings\Temp\XPgt-pwise\4DDB62C5EQDOMAINEQRADI00172627417... 5/24/2011 URS Washington Division TASK ORDER WORK AUTHORIZATION CUSTOMER: Utah Division of Radiation Control (LfDRC) PROJECT NAME: Review Phase 1 and Phase 2-5 Work Plans for White Mesa Mil! Nitrate Investigation COOTRACT AGREEMENT NO.: 116259 under Memorandum of Agreement between Utah Division of Radiation Control and Denison Mines (USA) Corp. (Aitachment A) TASK ORDER NO.: UTI 1 .UDEQ. 1102.002 REVISION NO.: 1 EFFECTTVE START DATE: May 1, 2011 BASIS FOR PA YMENT/COST ESTIMATE IS DETAILED JCV ATTACHIVIENT A SCOPE OF SERVICES/DELIVERABLES See Attachment B "Cost Estimates for URS by Task and Staff Time (MOA Parts 1 .B.6 and 1.6.7)" of Attachment B "Memorandum of Agreement between Utah Division of Radiation Control and Denison Mines (USA) Coip.: Review of Nitrate Contamination Investigation Work Plan, Revision 3" to this Task Order Work Authorization PERFORMANCE SCHEDULE OF DELIVERABLES: URS wilfconduct its work to satisfv UDRC's schedule needs. CUSTOMER RESPONSIBLE CONTACT PERSON: Tom Rushing, 801-536-4250 URS/WASHINGTON DFS/ISION RESPONSIBLE CONTACT PERSON: Robert Baird, Senior Project Manager, 801 -904-4122, Paul Bitter, Senior Engineer, 801 -904-4043 TERMS AND CONDITIONS: This Work Authonzation shall be govemed by the terms and conditions set forth in the State of Utah Contract between the Utah Department of Environmental Quality/Division of Radiation Control and URS Safety Management Solutions, effective January 1, 2011. See also Attachment B. CUSTOMER AUTHORIZATION: By: Title: VlVV^'m t>Tr^U3<- Date: ^|2-3> |ZJD\1 URS/SAFETY MANAGEMENT SOLUTIONS ACCEPTANCE: By: Title: Date: URS Washington Division ATTACHMENT A BASIS FOR PAYMENT/COST ESTIMATE Nitrate Plume Work Plan Review Person Hours Cost Baird 16 $2,884 Bitter 30 $4,320 Cox 41 $3,936 Singleton 16 $2,560 Admin-OI 5 $314 Admin-02 3 $144 111 $14,158 Other Direct Costs $51 Total Cost $14,209 URS Washington Division ATTACHMENT B Memorandum of Agreement between Utah Division of Radiation Control and Denison Mines (USA) Corp.: Review of Nitrate Contamination Investigation Work Plan, Revision 3 State of Utah G.ARY R. HERBERT Governor GREG BELt, Lieutenant Governor Department of Environmental Quality Smith Exet utive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Diteclur May 19,2011 CERTIFIED MAIL (Return Receipt Requested) David C: Frydenlund, Vice President, Regulatory Affairs and Counsel Denison Mines (USA) Corp. 1050 17'^ Street Suite 950 Denver, CO 80265 Subject: Final Memorandum of Agreement, Revision 3 between DRC and Denison Mines (USA) Corp. Regarding URS Services for the White Mesa Nitrate Contamination Investigation Work Plan Review Dear Mr. Frydenlund; A copy of the Final and Executed Memorandum of Agreement between the Utah Division of Radiation Control and Denison Mines (USA) Corp., Revision 3, is enclosed. If you have any questions or concems regarding this transmittal, please contact Tom Rushing at (801)5-36-0080. Sincerely, Rusty Landtferg, Director Utah Division of Radiation Control F;\DUSA\Niuate Conuimination lnvestigalion\MOA for I'RS Ser\'ices\Rev 3\FinaI Executed MOA Rev 3 Cover Lir doc !95 North 1950 West • Sail Lake City, MT Mailing Address: P O Box 144850 • Salt Luke City. LT 84 ? J4 4850 Telephone (801) 5:^6-4250'Fax (801) 5.^.V40<>7 • T D D (801)536-4414 11 VK dftf Itlf.h liin- t'riiilc J on \Oi)',i rc-,. v> tett p.![ii-r MEMORANDUM OF AGREEMENT BETWEEN UTAH DIVISION OF RADIATION CONTROL AND DENISON MINES (USA) CORP. I. Genera] The Utah Division of Radiation Control (DRC) and Denison Mines (USA) Corp. (DUSA) hereby enter into this Memorandum of Agreement (MOA). A. DUSA owns and operates a uranium mill tailings facility near Blanding, Utah. B. This MOA pertains to project tasks associated with the following: 1) DUSA Nitrate Investigation Report dated December 30, 2009. 2) DRC Notice of Additional Required Action, dated October 5, 2010. 3) DRC/ DUSA Tolling Agreement, dated December 15, 2010. 4) DRC / DUSA Tolling Agreement Rev. 1, dated April 28, 2011. 5) DRC review of the DUSA February 18, 2011 "Work Plan and Schedule for Supplemental Contaminant Investigation Report for White Mesa Mill Nitrate Investigation." 6) DRC review of the DUSA Phase I (Including Phases 1 A through 1 C as outlined in the Rev I Tolling Agreement) Work Plan for the White Mesa Uranium Mill Nitrate Contamination Investigation due to DRC by May 6, 2011. 7) DRC review of the DUSA Phase 2 through 5 White Mesa Uranium Mill Nitrate Contamination Investigation Woiic Plan and Completion Schedule due to DRC by June 3,2011 C. This agreement may be extended or modified to include other identified project tasks or phases of activity, if expressly agreed to in writing by both parties to this agreement at least 30 days prior to its expiration date. D. Per discussion during a meeting between DRC and DUSA on Febmary 14, 2011 (Meeting), it was agreed that comments related to the initial work plan would be submitted to DUSA by March 21,2011. This is 30 days from the submittal of the amended initial work plan received by DRC on February 18, 2011. Therefore, item 4 of the 12/15/2010 Tolling Agreement between DRC and DUSA was agreed to be March 21, 2011 instead March 15, 2011 based on agreements during that Meeting. DRC does acknowledge that the original work plan was submitted on February 14, 2011, via hand delivery during the Meeting; however, during the Meeting, it was identified that certain revisions lo one or more figures in the work plan were required and that laboratpry QA/QC issues associated with isotopic sample collection and analysis had not been specifically addressed in the February 14, 2011 version. DUSA agreed to address these issues in the amended work plan submitted on February 18, 2011. The DRC provided DUSA with its comments regarding the February 18, 2011 Work Plan in a March 21,2011 URS Memorandum by e-mail on March 21, 2011 per agreements in Revisions 1 and 2 of this MOA. March 15, 2011 Page I of 6 Rev. 3 Per additional discussion during a meeting between both parties in Salt Lake City, Utah on April I3j 2011 to discuss the DRC comments for the February 18, 2011 Work Plan. A subsequent meeting was held in Salt Lake City, Utah on April 20,2011. During the April 20 Meeting, it was agreed by both parties that the Nitrate Investigation field work would be conducted in five (5) Phases. During the meeting, the DRC and DUSA discussed in detail what Phase 1 would include and came to a consensus. Phase 1 will include three (3) sub-phases, as follows; Phase 1A ' Geoprobe investigation of a possible natural nitrate salt reservoir in vadose zone soils. Phase IB - Geoprobe investigation of potential nitrate source locations in the Mill site area. Phase 1C - Geoprobe investigation of other potential nitrate sources. During the April 20 Meeting, the Co-Exccutivc Secretary and DUSA agreed that DUSA would prepare and submit a Revised Work Plan for Phase 1A through C on or before May 6, 2011. The DRC committed to give DUSA its comments for the Phase 1 Work Plan on or before May 12, 2011. During the April 20 Meeting, it was agreed that as many as four other phases of study / activity may be requured as part of the nitrate investigation. These were briefly discussed in concept; and it was agreed that the possible remaining phases and activities could include the following: Phase 2 - Groundwater quality sampling and analysis of existing wells for non-isotopic analytes, including, but not limited to submittal of a revised Quality Assurance Plan (hereafter QAP) for all non-isotopic constituents not currently found in the March 22, 20] 0 DUSA QAP (Rev. 6). Phase 3 - Deep bedrock core sampling and analysis at possible natural nitrate reservoir and potential nitrate source locations, with similar objecfives as Phase 1 A, B and C, above- Phase 4 - Stable isotopic sampling and analysis of groundwater in existing wells, with details to be defined later, and approved by both parties. Phase 5 - Isotopic soil sampling and analysis (if needed). During the April 20 meeting, the Co-Executive Secretary and DUSA agreed that DUSA would prepare and submit a Revised Phase 2 through 5 Work Plan and Completion Schedule for Co-Executive Secretary review and approval on or before June 3, 2011. DUSA also committed to provide, as part of the Revised Phase 2 through 5 Work Plan, an initial Conceptual Site Model (hereafter CSM) to guide the Nitrate Investigation. Both parties agreed that the initial CSM could be subject to revision as Phases 2 through 5 of the investigation proceeded forward. March 15,2011 Page 2 of 6 Rev.3 II. Duration This MOA will become etfective immediately upon signature by DUSA and DRC. This MOA will expire on August 1, 2011. The DEQ fee schedule allows for reimbursement of actual costs of special projects. III. Agreement Per Revisions 1 and 2 ofthis MOA DRC agrees to: A, Engage the services of URS Corporation to accomplish Phase 1 of the project under the current contract (State Contract No. 116259), according to the agreed upon tasks and total costs in Table 1, below Table I. URS Task and Cost Summary For Phase 1 * Task Description Hours Attend 4 DWQ Meetings 20 Review and discuss lustoncal docxunents firom DWQ website 48 Review the initial Wortc Plan and produce comments 36 Conduct two lejcconftrence calls with the istate DEQ/DRC 7 Conduct one teleconfererKC call with Denison Mines (USA) Corp: (approximately 7 work d9^3 after review start) 5 Review the fmal wtirk plan 7 Subcontract and payment for M. Singleton for isotopic analysis/review 6 Contract IDWA Management 12 Total Hours 141 Total Cost (iflj to) $17,704 * Tasks and costs per an e-mail fix»m URS, received by DRC on 2/15/2011 (Included as Attachment A of this MOA). B. Provide DUSA with: I) A telqjhone conference call with DRC and URS to share preliminary impressions and observations regarding review of the initial work plan (to be arranged approxiniately 7 days after beginning work plan review). March 15, 2011 Page 3 of 6 Rev. 3 2) A final report of findings (observations and requests for additional information) regarding the Revised Work Plan, on or before March 21,2011, and, 3) Any URS invoices for services rendered on this project, including hours expended, hourly rates and job classification of URS staff involved, and a breakdown of any other expenses incurred during project completion, C. Bill DUSA for URS work efforts expended in completion of the total project for review ofthe February 18, 2011 Work Plan Review^ (MOA Part I.B.5) and/or Attachment A, up to $17,704. These costs are based on the work element and schedule assumptions found in Table 1 above. This agreement may be amended, for any reason, after consent by both parties. Per Revision 3 of the MOA DRC Agrees to: A. Engage the services of URS Corporation to accomplish review ofthe project under the current contract (State Contract No. 116259), according to the agreed upon tasks and total costs in Attachment B of this Agreement B. Bill DUSA for URS work efforts in completion of the current phased project (MOA Parts LB.6 and I.B.7), up to $14,209. These costs are based on the work elements and schedule assumptions found in Attachment B. This agreement may be amended, for any reason, after consent by both parties. DUSA Agrees to: Provide DRC with timely payment of any invoice for URS Corporation consulting services related to completion of the activities referenced above and/or included in Attachments A andB. SIGNATURES: Rusty lontdberg. Director Division oOtactiation Control Afipbrizep Representative Dtaiison Mines (USA) Corp. Date Date F:\DUSAVNitrate Contanunation Inve3tigation\MOA for URS ServtcesVRev. 3\fledline Rev: 3 Nitrate Work Plan MOA.doc March 15,2011 Page 4 of 6 Rev. 3 Attachment A - Cost Estimates for URS by task and staff time URS Scope of Work for UDRG: Review of Denison Mines Reports EFFORT BY TASK 1) Attend 4 DWQ Meetings (2 meetings already attended) 2) Review and discuss historical documents from OWQ web site 3) Review draft work plan and produce comments 4) Two TeleconferwTce calls wtth state DWQ 5) One teleconference cali wltti Denison 6) Review final work plan 7) Subcx^niract and payment fbr M Singleton for isotope snalysis consultation fi> Contract IDWA management Total hours Totals 20 48 36 7 9 Cost 6 12 141 $ 17,7«4 EFFORT BY PERSON Totals Robert Baird Paul Bitter Jeremy Cox M Singleton Admin Total hours Totai^Goit ^ 17 3d 44 28 14 141 $ 17,704 March 15,2011 Page 5 of 6 Rev. 3 Attadiment B - Cost Estimates for URS by task and staff time (MOA Parts I.B.6 and LB.7) DUSA NITRATE PLUME INVESTIGATION WORK PLAN; CONTINUING REVIEWS ^gj-~ 'Kiaawi TaMMC tort Ism OMt PXSaJ* « nrj i, 3 H f*' feS '•' 4 3 3 '4 ct 0 7 191 tt.yi.4 RmMvPhMAlWoiH Ptae 2 3 1 a e Submit Cpm(iwn4« ta tfORC 1 2 0 3 3 &» TBiamnfmnoa vHti UDRC 1 i 3 3 Q 9 sne tfal# appvnUrnata RwpoM to JDRC CammMi» ? 1 2 ? :» 5 Tftaaonrmm V(mi UDRC « DUSA (munad) 3 3 3 2 « a ini tMi* OMmhrrtaitt Tftaaonrmm V(mi UDRC « DUSA (munad) B 1 13 t t) r • ism 90 »«ao R«ww P hu« n - V Wortc Plait Raviaw 9 a 7 4 0 19 19 <w SHbmi coiTTMnh to tJi;f«; > 5 4 12 Vt» TtlaaofMtsoa tJONC ? 2 3 3 ? « I? HO dwta •mwnmiaiiM Raspond |« UORC ComntwitB 3 ? ? c 8 VZ2 TateoDoTwanoa vrltti UDRC S DUSA (aMUfnai*) 2 « tf S H i 4 »« 14 '9 ujm W KV iW* aiipotknat* TtUittwl yo M i -:<> 1)1 AM S UW 1 «» » i« » M « U 9 100 (14 tas Cm* H 9 >U 1 3JM t t** « i, soo (14 tas March 15, 2011 Page 6 of 6 Rev. 3