Loading...
HomeMy WebLinkAboutDRC-2012-001163 - 0901a068802b1532State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor CERTIFIED MAIL Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Dll ector - 2012-00 cr ru o Ln [T r- ILEN DC ) U.S. Postal Service™ CERTIFIED MAIL™ RECEIPT (Dtmestic Mail Only; N» Insurance Coverage Pr»viM) January 20 2012 g 1/20/12 install & testing closeout letter/DH Fmr dellverv information visit •ur weksite at www.usps.c«m» 0 F F 1 C IAL USE Postage Certif ed Fee $ Postage Certif ed Fee RETURNED RECEIPT REQUESTED Mr David C Frydenlund Vice President Regulatory Affairs and Counsel Denison Mines (USA) Corp (DUSA) Independence Plaza Suite 950 1050 Seventeenth Street Denver CO 80265 C2 O a David C Frydenlund Vice President & General Counsel Denison Mines (USA) Corp (DUSA) 1050 17th ST STE 950 Denver CO 80265 mtm se (•r Instructions SUBJECT Denison Mines (USA) Corp ( DUSA ) March 17 2010 Letter Report for the Installation and Hydraulic Testing of Perched Groundwater Monitonng Wells TW4 23 TW4 24 and TW4 25 at the White Mesa Uranium Mill - Closeout Letter Dear Mr Frydenlund The Division of Radiation Control ( DRC ) reviewed the DUSA March 17 2010 Letter Report for the InstallaUon and Hydraulic Testing of Perched Groundwater Monitonng Wells TW4 23 TW4 24 and TW4 25 at the White Mesa Uranium Mill ( Report ) This Report was in response to item 1 m the DRC request for additional informaUon letter dated June 1 2010 ( DRC Letter ) Based on the review it appeared that conditions m item 1 of the DRC Letter were satisfied with the exception of missing honzontal survey coordinates for monitonng wells TW4 23 TW4 24 and TW4 25 as required in Part I H 6(b)(5) of the Denison Mines (USA) Corp ( DUSA ) State of Utah Ground Water Discharge Permit No UGW370004 ( Permit ) On November 14 2011 DRC sent a letter to DUSA requesUng addiUonal information for the honzontal survey coordinates for the above three monitor wells On November 26 2011 DUSA responded with a letter that included the horizontal survey coordinates for these wells therefore it appears that DUSA has saUsfied Part I H 6(b)(5) of the Permit This letter constitutes a closeout of the requirements in Part IH 6(b)(5) of the Permit Thank you for your cooperation in this matter If you have any quesuons or comments regarding this letter please contact Dean Henderson at (801) 536 0046 UTAH WATER QUALITY BOARD Rusty Lundberg Co ExecuUve Secretary RL/DH 195 North 1950 West Salt Lake City UT Mailin^ Address PO Box 144850 Salt Lake City UT 84114 4850 Telephone (801) 536 4250 Fax (801) 533-4097 TDD (801)536 4414 vv d q t h g Pr ted 1009f cy 1 d p pe