HomeMy WebLinkAboutDRC-2012-001162 - 0901a068802b1531State of Utah
GARYR HERBERT
Governor
GREG BELL
Lieutenant Governor
Department of n O
Environmental Quality y K U
Amanda Smith
Executive Director
DIVISION OF RADIATION CONTROL
Dane L Finerfrock
Director
-2012-001162
MEMORANDUM
TO
FROM
DATE
SUBJECT
Phil Goble pj2^^
Dean Henderson
January 12 20ig^
>rd Review of the 3 Quarter 2011 Chloroform Monitonng Report for the Chloroform
Contamination Investigation Denison Mines (USA) Corp (hereafter DUSA )
White Mesa Uranium Mill near Blanding Utah
The Division of Radiation Control (hereafter DRC ) has reviewed 3'^^ Quarter 2011 Chloroform
Monitonng Report (hereafter Report ) for the Chloroform Contamination Investigation For the
review of these reports the following regulatory enforcement documents were used
• DUSA was issued Ground Water Quality Discharge Permit No UGW370004 (hereafter
Penrnt ) on March 8 2005 last revised on January 20 2010
• The DUSA Quality Assurance Plan (hereafter QAP ) March 22 2010 (Revision 6 0)
Review
The 3rd Report appeared to be in compliance with the Permit and QAP with the exception of the
not meeting the reporting requirements found m section 6(c)(3^'^ bullet) of Appendix A of the
QAP This section of the QAP requires
Calculate chloroform mass removal by pumping wells Calculations would include 1) total
historic chloroform mass removed 2) total historic chloroform mass removed for each pumping
well 3) total chloroform mass removed for the quarter and 4) total chloroform mass removed
from each pumpmg well for the quarter
DUSA reported incorrect total mass removal for the quarter for pumping wells IVTW 24 TW4 4
TW4 19 and TW4 20 and the total mass removal for the quarter Using volumes (gallons)
pumped and chloroform concentrations reported in the Report DRC calculated 8 1 lbs of
chloroform removed for the quarter (see Table la below) and DUSA reported (calculated) 13 2
168 North 1950 West Salt Uke City UT
Mailing Address PO Box 144850 SaltLakeCity UT 84114 4850
Telephone (801)536 4250 Fax (801) 533-4097 TDD (801)536-4414
\vww d q thg
Pn t d 100% y 1 d p per
Page 2
lbs removed It appears that DUSA rmstakenly used the 2"^* quarter 2011 chloroform
concentration for MW 24 TW4 4 TW4 19 and TW4 20 to calculate the chloroform mass
removal for the 3'^'' quarter 2011 (see Table lb below)
i'
DRC staff recommends that no notice of violation be issued but instead issue DUSA a notice of
enforcement discretion informing them of the error and requesting that they make the necessary
corrections to accurately report chloroform mass removal in future chloroform monitonng reports
Page 3
References
Denison Mines (USA) Corp March 22 2010 White Mesa Uranium Mill Ground Water
Monitonng Quality Assurance Plan (Revision 6 0)
Denison Mines (USA) Corp November 28 2001 White Mesa Uranium Mill Chloroform
Monitonng Report 3rd Quarter (July through September 2011)
\.
State of Utah Division of Water Quality Department of Environmental Quality January 20 2010
Ground Water Discharge Permit for Denison Mines (USA) Corp at the White Mesa Mill Facility
Near Blanding Utah
Chloroform Mass Removal Calculations
DUSA White Mesa Mill Bland Utah
3rd Quarter 2011
Table la
DRC Mass Removal Calculations
Well ID MW4 MW 26 TW4 4 TW4-19 TW4 20
Ave Chloroform (ug/L) 1 700 720 1 500 970 6 800
Chloroform (g/L) 1 70E 03 7 20E 04 1 50E 03 9 70E 04 6 80E 03
Chloroform (Ibs/L) 3 76E 06 1 59E 06 3 31E 06 2 14E 06 "1 50E 05
Chloroform (lbs/gal) 1 42E 05 6 02E 06 1 25E 05 8 11E 06 5 69E 05
Total gallons pumped 1st qtr 2011 85 327 65 618 97 535 141 542 72 311
Ibs of chloroform removed 1 2 04 1 2 1 1 4 1
Gallons of chloroform removed 01 00 0 1 01 03
total Ibs of chloroform removed 8 1
total qallons of chloroform removed 07
Table lb
DUSA Mass Removal Calculations
Well ID <I)MW4 ^^>MW 26 (2)TW4 4 ^^h^4 19 (2)TW4 20
Ave Chloroform (ug/L) 1 700 1 800 1 700 4 000 8 100
Chloroform (g/L) 1 70E 03 1 SOE 03 1 70E 03 4 OOE 03 8 IOE 03
Chloroform (Ibs/L) 3 76E 06 3 98E 06 3 76E 06 8 84E 06 1 79E 05
Chloroform (lbs/gal) 1 42E 05 1 51E 05 1 42E 05 3 35E 05 6 77E 05
Total gallons pumped 1st qtr 2011 85 327 65 618 97 535 141 542 72 311
Ibs of chloroform removed 1 2 1 0 1 4 47 49
Gallons of chloroform removed 01 0 1 01 04 04
total Ibs of chloroform removed 132
total gallons of chloroform removed 1 1
(2) Used 2nd quarter 2011 chloroform concentrations