HomeMy WebLinkAboutDRC-2011-007903 - 0901a06880303bf1RusseU Topham - Replacement Figure for response to 2010 Stormwater Inspection - White Mesa
Mill
From: Jo Ann Tischler <jtischler(gdenisonmines com>
To: Rusty Lundberg <rlundberg EQSHW EQDOMAIN@utah gov>
Date: 10/20/2011 12 06 PM
Subject: Replacement Figure for response to 2010 Stormwater Inspection - White Mesa Mill
CC: Phillip Goble <Pgoble@utah gov>, Thomas Rushing ii <TRUSHING(gutah gov>,
Harold Roberts <HRoberts(gdenisonmines com>, David Frydenlund
<DFrydenlund(^denisonmines com>, David Turk <DTurk(§denisonmines com>,
"KathyWeinel" <KWeinel(gdenisonmines com>, Meredith Goble
<MGoble(gdenisonmines com>
Attachments: New Concrete-Layoutl pdf
Attached please find a pdf file of the Construction As-Built drawing for the Alternate Feed Area Concrete Pad at
Denison Mines (USA) Corp's ("Denison's") White Mesa Mill The figure transmitted with this email is intended
to replace the figure provided in Attachment D of Denison's October 17, 2011 response to Utah Division of
Radiation Control's (PRC's") Inspection Report and Confirmatory Action Letter regarding the Stormwater Best
Management Practices Plan 2010 inspection The figure enclosed with the October 17, 2011 response letter was
an intermediate working version The attached pdf is a final version of the drawing, indicating that construction
has been completed consistent with the design notes
Please contact me if you have any questions regarding this transmittal
Yours truly,
Jo Ann Tischler
Jo Ann Tischler
Director, Compliance and Permitting
t 303-389-4132 I f 303-389-4125 1050 17th Street, Suite 950 Denver, CO, US, 80265
DENISON MINES (USA) CORP
www denisonmines com
This e-mail is intended for the exclusive use the of person(s) mentioned as the recipient(s) This message and any attached files with it are confidential and may
contain pnvileged or propnetary information If you are not the intended recipient(s) please delete this message and notify the sender You may not use, distnbute
pnnt or copy this message if you are not the intended recipient(s)
file //C \Documents and Settings\rtopham\Local Settings\Temp\XPgrpwise\4EA040E4E 10/21/2011
10
AREA
THE GRADING LINES
SUBGRADE IS CQMPDSED OF COMPACTED SOIL AND ROCK
CONCRETE IS 4000 PSI MIX
CONCRETE IS 6 SLAB ON GRADE
CONCRETE EXPANSION JOINTS WERE DETERMINED AT INSTALLATION
JOINTS LEAVE A MINIMUM OF E4 OF PROTRUDING REBAR FDR THE NEXT POUR
REINFORCEMENT BAR IS tt4 REBAR AND IS LOCATED APPROXIMATELY MIDWAY
THROUGH THE CONCRETE SLAB
REINFORCEMENT BAR SPACING IS 12 ON CENTER WITH MINIMUM DF 18 OVERLAP
HYDRO-FLEX WATERSTDP WAS APPLIED TO ALL COLD JOINTS IN ACCORDANCE WITH
MANUFACTURER RECOMMENDATION
DETAIL 8-D
CURB DETAIL SCDLE N/D
EXISTING CONCRCTE CURB
NEW CONCRETE SLAB
CUT CXISTWC CURB FTK DRAINAGE
DETAIL 8-E DRAIN DETAIL SCALE N/A
SIGNATURE DATE
SRS 10/20/11 BKWH
SRS 10/ao/ii APPR.
DH 10/20/11
dENiSO MINES
ALTERNATE FEED
CONCRETE SLABS FOR BRUN STAGlNG/HANBLmC
SHEET 1 of 1