Loading...
HomeMy WebLinkAboutDRC-2011-007903 - 0901a06880303bf1RusseU Topham - Replacement Figure for response to 2010 Stormwater Inspection - White Mesa Mill From: Jo Ann Tischler <jtischler(gdenisonmines com> To: Rusty Lundberg <rlundberg EQSHW EQDOMAIN@utah gov> Date: 10/20/2011 12 06 PM Subject: Replacement Figure for response to 2010 Stormwater Inspection - White Mesa Mill CC: Phillip Goble <Pgoble@utah gov>, Thomas Rushing ii <TRUSHING(gutah gov>, Harold Roberts <HRoberts(gdenisonmines com>, David Frydenlund <DFrydenlund(^denisonmines com>, David Turk <DTurk(§denisonmines com>, "KathyWeinel" <KWeinel(gdenisonmines com>, Meredith Goble <MGoble(gdenisonmines com> Attachments: New Concrete-Layoutl pdf Attached please find a pdf file of the Construction As-Built drawing for the Alternate Feed Area Concrete Pad at Denison Mines (USA) Corp's ("Denison's") White Mesa Mill The figure transmitted with this email is intended to replace the figure provided in Attachment D of Denison's October 17, 2011 response to Utah Division of Radiation Control's (PRC's") Inspection Report and Confirmatory Action Letter regarding the Stormwater Best Management Practices Plan 2010 inspection The figure enclosed with the October 17, 2011 response letter was an intermediate working version The attached pdf is a final version of the drawing, indicating that construction has been completed consistent with the design notes Please contact me if you have any questions regarding this transmittal Yours truly, Jo Ann Tischler Jo Ann Tischler Director, Compliance and Permitting t 303-389-4132 I f 303-389-4125 1050 17th Street, Suite 950 Denver, CO, US, 80265 DENISON MINES (USA) CORP www denisonmines com This e-mail is intended for the exclusive use the of person(s) mentioned as the recipient(s) This message and any attached files with it are confidential and may contain pnvileged or propnetary information If you are not the intended recipient(s) please delete this message and notify the sender You may not use, distnbute pnnt or copy this message if you are not the intended recipient(s) file //C \Documents and Settings\rtopham\Local Settings\Temp\XPgrpwise\4EA040E4E 10/21/2011 10 AREA THE GRADING LINES SUBGRADE IS CQMPDSED OF COMPACTED SOIL AND ROCK CONCRETE IS 4000 PSI MIX CONCRETE IS 6 SLAB ON GRADE CONCRETE EXPANSION JOINTS WERE DETERMINED AT INSTALLATION JOINTS LEAVE A MINIMUM OF E4 OF PROTRUDING REBAR FDR THE NEXT POUR REINFORCEMENT BAR IS tt4 REBAR AND IS LOCATED APPROXIMATELY MIDWAY THROUGH THE CONCRETE SLAB REINFORCEMENT BAR SPACING IS 12 ON CENTER WITH MINIMUM DF 18 OVERLAP HYDRO-FLEX WATERSTDP WAS APPLIED TO ALL COLD JOINTS IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION DETAIL 8-D CURB DETAIL SCDLE N/D EXISTING CONCRCTE CURB NEW CONCRETE SLAB CUT CXISTWC CURB FTK DRAINAGE DETAIL 8-E DRAIN DETAIL SCALE N/A SIGNATURE DATE SRS 10/20/11 BKWH SRS 10/ao/ii APPR. DH 10/20/11 dENiSO MINES ALTERNATE FEED CONCRETE SLABS FOR BRUN STAGlNG/HANBLmC SHEET 1 of 1 10