Loading...
HomeMy WebLinkAboutDRC-2011-007647 - 0901a06880292874DENISO MINES December 2, 2011 VIA E-MAIL AND OVERNIGHT DELIVERY Mr. Rusty Lundberg Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144850 Salt Lake City, UT 84114-4850 Denison Mines (USA) Corp. 1050 17th Street, Suite 950 Denver, CO 80265 USA Tel: 303 628-7798 Fax:303 389-4125 www.denisonmines.com Re: Updated Surety Estimate, White Mesa Mill Dear Mr. Lundberg: Due to a change in the conventional ore processing schedule at the White Mesa Mill, Denison Mines (USA) Corp. ("Denison") is submitting a revised surety estimate, Revision 4.7, to reflect the additional cost for disposal in the tailings area of a larger quantity of conventional ore than contemplated by the surety estimate dated November 1, 2011 of $19,328,258 (the "November 1 Surety Amount"), which was approved by the Division of Radiation Control on November 15, 2011. The disposal cost for conventional ore is estimated through March of 2012, when the next annual surety update is due. We have aisp updated the quantities of alternate feed material stored on site to reflect recent processing and projected deliveries to March 2012. Attached for your review is Revision 4.7 of the Mill Decommissioning section of the surety estimate and a revised Summary page detailing the new total cost of $19,420,335 (the "Updated Surety Amount"). This revision adds approximately $92,000 to the currently approved surety amount. Under License Condition 9.5, Denison is required to submit written evidence of the November 1 Surety Amount within 30 days of receipt of your November 15, 2011 letter. However, in light of the foregoing, please advise Denison if you would prefer that we: 1. submit the revised surety documents for the November 1 Surety Amount within 30 days of our receipt of your November 15, 2011 approval, without reference to the Updated Surety Amount. The surety would then be replaced with the Updated Surety Amount, within 30 days after approval of the Updated Surety Amount; or 2. not submit the revised surety documents for the November 1 Surety Amount, but, instead, wait until the Updated Surety Amount is approved, in which case a revised surety that reflects the Updated Surety Amount would be submitted within 30 days after approval of the Updated Surety Amount. If you advise us to follow option 2 above, we will consider that to be your waiver of the requirement to submit the revised surety documents for the November 1 Surety Amount within 30 days of receipt of your November 15 letter. Letter to Mr. Rusty Lundberg Revised Surety Estimate December, 2011 Page 2 Please contact me if you have any questions or require any further information. Yours very truly, DENISON MINES (USA) CORP. Jo Ann Tischler Director, Compliance and Permitting cc: David C. Frydenlund Harold R. Roberts David E. Turk K. Weinel DENISO MINES WHITE MESA MILL RECLAMATION COST ESTIMATE December 2011 Revision 4.7 Mill Decommissioning $2,058,398 Cell 1 $1,671,808 Cell 2 $1,704,415 Cells $2,106,627 Cell 4A $1,360,123 Cell 4B $1,387,762 Miscellaneous $3,637,667 Subtotal Direct Costs $13,926,801 Profit Allowance 10.00% $1,392,680 Contingency 15.00% $2,089,020 Licensing & Bonding 2.00% $278,536 UDEQ Contract Administration 4.00% $557,072 Contractors Equipment Floater $82,250 Automobile and General Liability Insurance $284,600 Long Term Care Fund $809,376 Total Reclamation $19,420,335 Revised Bond Amount $19,420,335 12/2/2011 - 11:08 AM - WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. Wliite Mesa Mill MILL DECOMMISSIONING MILL DECOMMISSIONING Mill Building Demolition Resource Description Units Cost/Unit Task Units Task Cost tirs $16.77 640 $10,736 hrs $12.51 320 $4,002 hrs $1.35 960 $1,296 hrs $95.11 640 $60,872 hrs $16.67 640 $10,671 hrs $134.11 160 $21,458 hrs $17.21 160 $2,754 hrs $130.25 160 $20,840 hrs $20.65 160 $3,304 hrs $147.18 160 $23,548 hrs $20.65 160 $3,304 hrs $103.61 160 $16,577 hrs $15.76 160 $2,522 hrs $65.24 80 $5,219 hrs $15.76 80 $1,261 hrs $18.46 1,360 $25,102 sf $3.30 37,500 $123,750 Mechanics Laborers Snnall Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 60 Ton Crane 60 Ton Crane Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total Mill Building Demolition $337,218 Ore Feed Demolition Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 64 $1,074 hrs $12.51 32 $400 hrs $1.35 96 $130 hrs $95.11 64 $6,087 hrs $16.67 64 $1,067 hrs $134.11 16 $2,146 hrs $17.21 16 $275 hrs $130.25 16 $2,084 hrs $20.65 16 $330 hrs $147.18 16 $2,355 hrs $20.65 16 $330 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 112 $2,067 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Total Ore Feed Demolition $18,346 SX Building Demolition Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 60 Ton Crane 60 Ton Crane Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total SX Building Demolition hrs $16.77 320 $5,368 hrs $12.51 160 $2,001 hrs $1.35 480 $648 hrs $95.11 320 $30,436 hrs $16.67 320 $5,336 hrs $134.11 80 $10,729 hrs $17.21 80 $1,377 hrs $130.25 80 $10,420 hrs $20.65 80 $1,652 hrs $147.18 80 $11,774 hrs $20.65 80 $1,652 hrs $103.61 0 $0 hrs $15.76 0 $0 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 560 $10,336 sf $3.30 55,970 $184,701 $276,430 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING CCD Circuit Removal Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 120 $2,013 hrs $12.51 60 $750 hrs $1.35 180 $243 hrs $95.11 120 $11,414 hrs $16.67 120 $2,001 hrs $134.11 30 $4,023 hrs $17.21 30 $516 hrs $130.25 30 $3,908 hrs $20.65 30 $620 hrs $147.18 30 $4,415 hrs $20.65 30 $620 hrs $103.61 30 $3,108 hrs $15.76 30 $473 hrs $65.24 15 $979 hrs $15.76 15 $236 hrs $18.46 255 $4,707 sf $3.30 15,000 $49,500 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 60 Ton Crane 60 Ton Crane Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total CCD Circuit Removal $89,525 Sample Plant Removal Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total Sample Plant Removal hrs $16.77 32 $537 hrs $12.51 16 $200 hrs $1.35 48 $65 hrs $95.11 32 $3,044 hrs $16.67 32 $534 hrs $134.11 8 $1,073 hrs $17.21 8 $138 hrs $130.25 8 $1,042 hrs $20.65 8 $165 hrs $147.18 8 $1,177 hrs $20.65 8 $165 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 56 $1,034 sf $3.30 4,200 $13,860 $23,033 Temporary Storage Building Removal Resource Description Units Cost/Unit Task Units Task Cost Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Equipment Maintenance (Butler) Concrete Removal Total Temporary Storage Building Removal Truck Shop Removal ^ Resource Description hrs $12.51 8 $100 hrs $1.35 8 $11 hrs $95.11 2 $190 hrs $16.67 2 $33 hrs $134.11 2 $268 hrs $17.21 2 $34 hrs $18.46 4 $74 sf $3.30 600 $1,980 Units Cost/Unit Task Units $2,691 Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator 12/1/2011 - 1:49 PM-WMM Rec Plan Est Decemt)er 2011 Rev4.7.xls hrs $16.77 32 $537 hrs $12.51 16 $200 hrs $1.35 48 $65 hrs $95.11 24 $2,283 hrs $16.67 24 $400 hrs $134.11 8 $1,073 hrs $17.21 8 $138 hrs $130.25 8 $1,042 Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total Truck Shop Removal hrs $20.65 8 $165 hrs $147.18 8 $1,177 hrs $20.65 8 $165 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 48 $886 sf $3.30 4,200 $13,860 $21,991 Boiler Demolition Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 160 $2,684 hrs $12.51 80 $1,000 hrs $1.35 240 $324 hrs $95.11 160 $15,218 hrs $16.67 160 $2,668 hrs $134.11 40 $5,364 hrs $17.21 40 $689 hrs $130.25 40 $5,210 hrs $20.65 40 $826 hrs $147.18 40 $5,887 hrs $20.65 40 $826 hrs $103.61 0 $0 hrs $15.76 0 $0 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 280 $5,168 sf $3.30 2,900 $9,570 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 60 Ton Crane 60 Ton Crane Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total Boiler Demolition $55,435 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Vanadium Oxidation Circuit Removal Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator 60 Ton Crane 60 Ton Crane Operator 30 Ton Crane 30 Ton Crane Operator Equipment Maintenance (Butler) Concrete Removal Total Vanadium Oxidation Circuit Removal hrs $16.77 64 $1,074 hrs $12.51 32 $400 hrs $1.35 96 $130 hrs $95.11 64 $6,087 hrs $16.67 64 $1,067 hrs $134.11 16 $2,146 hrs $17.21 16 $275 hrs $130.25 16 $2,084 hrs $20.65 16 $330 hrs $147.18 16 $2,355 hrs $20.65 16 $330 hrs $103.61 0 $0 hrs $15.76 0 $0 hrs $65.24 0 $0 hrs $15.76 0 $0 hrs $18.46 112 $2,067 sf $3.30 1,200 $3,960 $22,306 Main Shop/Warehouse Demolition Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 128 $2,147 hrs $12.51 64 $800 hrs $1.35 192 $259 hrs $95.11 128 $12,174 hrs $16.67 128 $2,134 hrs $134.11 32 $4,292 hrs $17.21 32 $551 hrs $130.25 32 $4,168 hrs $20.65 32 $661 hrs $147.18 32 $4,710 hrs $20.65 32 $661 hrs $18.46 224 $4,134 sf $3.30 19,300 $63,690 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Concrete Removal Total Main Shop/Warehouse Demolition $100,382 Decon Pads (2) Demolition Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Concrete Removal Total Decon Pads (2) Demolition hrs $16.77 64 $1,074 hrs $12.51 32 $400 hrs $1.35 96 $130 hrs $95.11 64 $6,087 hrs $16.67 64 $1,067 hrs $134.11 16 $2,146 hrs $17.21 16 $275 hrs $130.25 16 $2,084 hrs $20.65 16 $330 hrs $147.18 16 $2,355 hrs $20.65 16 $330 hrs $18.46 112 $2,067 sf $3.30 1,350 $4,455 $22,801 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Office Building Demolition Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 96 $1,610 hrs $12.51 48 $600 hrs $1.35 144 $194 hrs $95.11 96 $9,131 hrs $16.67 96 $1,601 hrs $134.11 24 $3,219 hrs $17.21 24 $413 hrs $130.25 24 $3,126 hrs $20.65 24 $496 hrs $147.18 24 $3,532 hrs $20.65 24 $496 hrs $18.46 168 $3,101 sf $1.25 12,100 $15,125 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Concrete Removal Total Office Building Demolition $42,644 Septic Tanks and Drain Fields Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Total Septic Tanks and Drain Fields hrs $16.77 0 $0 hrs $12.51 16 $200 hrs $1.35 32 $43 hrs $95.11 16 $1,522 hrs $16.67 16 $267 hrs $134.11 8 $1,073 hrs $17.21 8 $138 hrs $130.25 8 $1,042 hrs $20.65 8 $165 hrs $147.18 0 $0 hrs $20.65 0 $0 hrs $18.46 32 $591 $5,040 Misc. Tankage & Spare Parts Removal Resource Description Units Cost/Unit Task Units Task Cost hrs $16.77 48 $805 hrs $12.51 24 $300 hrs $1.35 72 $97 hrs $95.11 48 $4,565 hrs $16.67 48 $800 hrs $134.11 12 $1,609 hrs $17.21 12 $207 hrs $130.25 12 $1,563 hrs $20.65 12 $248 hrs $147.18 12 $1,766 hrs $20.65 12 $248 hrs $18.46 84 $1,550 Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Total Misc. Tankage & Spare Parts Removal $13,759 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Alternate Feed Circuit and Reagent Storage Building Resource Description Units Cost/Unit Task Units Task Cost Mechanics Laborers Small Tools Cat 770 Haul Truck Truck Drivers Cat 988 Loader Cat 988 Loader Operator Cat 365 Excavator Cat 365 Excavator Operator PC 300 w/metal Shears PC 300 Operator Equipment Maintenance (Butler) Concrete Removal hrs $16.77 50 $839 hrs $12.51 50 $625 hrs $1.35 96 $130 hrs $95.11 50 $4,756 hrs $16.67 50 $834 hrs $134.11 34 $4,560 hrs $17.21 34 $585 hrs $130.25 34 $4,429 hrs $20.65 34 $702 hrs $147.18 52 $7,653 hrs $20.65 52 $1,074 hrs $18.46 170 $3,138 sf $3.30 3,500 $11,550 Total Alternate Feed Circuit and Reagent Storage Building $40,874 Mill Yard Decontamination Resource Description Units Cost/Unit Task Units Task Cost Cat 637 Scraper hrs $210.35 257 $54,060 Cat 637 Scraper Operator hrs $19.31 257 $4,962 Cat 988 Loader hrs $134.11 65 $8,717 Cat 988 Loader Operator hrs $17.21 65 $1,119 Cat D8N Dozer With Ripper hrs $95.82 65 $6,228 Cat D8N Dozer Operator hrs $20.65 65 $1,342 Cat D7 Dozer hrs $81.27 65 $5,283 Cat D7 Dozer Operator hrs $20.65 65 $1,342 Cat 651 Watenwagon hrs $113.30 65 $7,364 Cat 651 Watenwagon Operator hrs $18.16 65 $1,180 Cat 14G Motorgrader hrs $71.34 65 $4,637 Cat 14G Motorgrader Operator hrs $20.62 65 $1,340 Equipment Maintenance (Butler) hrs $18.46 582 $10,742 Total Mill Yard Decontamination $108,319 Ore Storage Pad Decontamination Resource Description Units Cost/Unit Task Units Task Cost Cat 637 Scraper hrs $210.35 189 $39,757 Cat 637 Scraper Operator hrs $19.31 189 $3,649 Cat 988 Loader hrs $134.11 48 $6,437 Cat 988 Loader Operator hrs $17.21 48 $826 Cat D8N Dozer With Ripper hrs $95.82 48 $4,599 Cat D8N Dozer Operator hrs $20.65 48 $991 Cat D7 Dozer hrs $81.27 48 $3,901 Cat D7 Dozer Operator hrs $20.65 48 $991 Cat 651 Watenwagon hrs $113.30 48 $5,438 Cat 651 Watenwagon Operator hrs $18.16 48 $872 Cat 14G Motorgrader hrs $71.34 48 $3,424 Cat 14G Motorgrader Operator hrs $20.62 48 $990 Equipment Maintenance (Butler) hrs $18.46 429 $7,918 Total Ore Storage Pad Decontamination $79,794 Equipment Storage Area Cleanup Resource Description Units Cost/Unit Task Units Task Cost Cat 637 Scraper hrs $210.35 68 $14,304 Cat 637 Scraper Operator hrs $19.31 68 $1,313 Cat 988 Loader hrs $134.11 17 $2,280 Cat 988 Loader Operator hrs $17.21 17 $293 Cat D8N Dozer With Ripper hrs $95.82 17 $1,629 12/1/2011 -1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Cat D8N Dozer Operator Cat D7 Dozer Cat D7 Dozer Operator Cat 651 Watenwagon Cat 651 Watenwagon Operator Cat 14G Motorgrader Cat 14G Motorgrader Operator Equipment Maintenance (Butler) hrs $20.65 17 $351 hrs $81.27 17 $1,382 hrs $20.65 17 $351 hrs $113.30 17 $1,926 hrs $18.16 17 $309 hrs $71.34 17 $1,213 hrs $20.62 17 $351 hrs $18.46 153 $2,824 Total Equipment Storage Area Cleanup $28,524 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Revegetate Mill Yard & Ore Pad Resource Description Units Cost/Unit Task Units Task Cost Cat 637 Scraper Cat 637 Scraper Operator Cat 988 Loader Cat 988 Loader Operator Cat D8N Dozer With Ripper Cat D8N Dozer Operator Cat D7 Dozer Cat D7 Dozer Operator Cat 651 Watenwagon Cat 651 Watenwagon Operator Cat 14G Motorgrader Cat 14G Motorgrader Operator Seed Mix Equipment Maintenance (Butler) Total Revegetate Mill Yard & Ore Pad Total Demolition and Decontamination hrs $210.35 174 $36,601 hrs $19.31 174 $3,360 hrs $134.11 0 $0 hrs $17.21 0 $0 hrs $95.82 33 $3,162 hrs $20.65 33 $682 hrs $81.27 33 $2,682 hrs $20.65 33 $682 hrs $113.30 0 $0 hrs $18.16 0 $0 hrs $71.34 33 $2,354 hrs $20.62 33 $681 Acre $322.50 50 $16,125 hrs $18.46 273 $5,039 $71,366 I $1,360,477| CLEANUP OF WINDBLOWN CONTAMINATION Scoping Survey Resource Description Units Cost/Unit Task Units Task Cost Soil Samples each $50.00 100 $5,000 Survey Crew hrs $16.14 752 $12,140 Sample Crew hrs $16.14 1,312 $21,181 Total Scoping Survey $38,322 Characterization Survey Resource Description Units Cost/Unit Task Units Task Cost Soil Samples each $50.00 472 $23,600 Sample Crew hrs $16.14 1,136 $18,340 Total Characterization Survey $41,940 Final Status Survey Resource Description Units Cost/Unit Task Units Task Cost Soil Samples each $50.00 300 $15,000 Sample Crew hrs $16.14 3,552 $57,344 Total Final Status Survey $72,344 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Windblown Cleanup Resource Description Units Cost/Unit Task Units Task Cost hrs $210.35 680 $143,039 hrs $19.31 680 $13,129 hrs $95.82 170 $16,289 hrs $20.65 170 $3,511 hrs $81.27 170 $13,817 hrs $20.65 170 $3,511 hrs $71.34 170 $12,127 hrs $20.62 170 $3,506 each $50.00 500 $25,000 hrs $16.14 163 $2,632 hrs $16.14 83 $1,340 hrs $18.46 1,190 $21,964 Cat 637 Scraper Cat 637 Scraper Operator Cat D8N Dozer With Ripper Cat D8N Dozer Operator Cat D7 Dozer Cat D7 Dozer Operator Cat 14H Motorgrader Cat 14G Motorgrader Operator Soil Samples Survey Crew Sample Crew Equipment Maintenance (Butler) Total Windblown Cleanup Quality Control Resource Description Units Cost/Unit Task Units $259,864 Task Cost Quality Control Contractor Total Quality Control Total Cleanup Windblown Contamination hrs $62.00 2,080 $128,960 $128,960 $541,430 Conventional Ore Disposal Resource Description Units Cost/Unit Task Units Task Cost hrs $95.11 378 $35,946 hrs $16.67 378 $6,302 hrs $134.11 126 $16,895 hrs $17.21 126 $2,169 hrs $113.30 126 $14,273 hrs $18.16 126 $2,288 hrs $71.34 25 $1,783 hrs $20.62 25 $516 hrs $18.46 655 $12,087 Cat 770 Haul Truck (3) Truck Drivers (3) Cat 988 Loader Cat 988 Loader Operator Cat 651 Watenwagon Cat 651 Watenwagon Operator Cat 14G Motorgrader Cat 14G Motorgrader Operator Equipment Maintenance (Butler) Total Conventional Ore Disposal Total Quantity $92,2581 74,074 Cubic Yards* 196 Cubic Yards per Truck per hour 378 Truck Hours * 100,000 tons maximum projected for March 2012 Loose (in-truck) material unit weight assumed as 100 lb/cubic foot Alternate Feed Disposal Cabot and FMRI Material Resource Description Units Cost/Unit Task Units Task Cost Cat 770 Haul Truck (3) Truck Drivers (3) Cat 988 Loader Cat 988 Loader Operator Cat 651 Watenwagon Cat 651 Watenwagon Operator Cat 14G Motorgrader Cat 14G Motorgrader Operator 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls hrs $95.11 39 $3,705 hrs $16.67 39 $650 hrs $134.11 13 $1,742 hrs $17.21 13 $224 hrs $113.30 13 $1,471 hrs $18.16 13 $236 hrs $71.34 10 $713 hrs $20.62 10 $206 Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING Equipment Maintenance (Butler) hrs $18.46 75 $1,383 Total Cabot & FMRI Material $10,330 Total Quantity 7,636 Cubic Yards* (projected to 03/01/2012) 196 Cubic Yards per Truck per hour 39 Truck Hours * Includes Cabot and FMRI Cameco Barrels and Honeywell Barrels Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $16.67 427 $7,126 Flat Bed Trailer and Tractor* hrs $55.00 427 $23,505 Fork Lift (2) hrs $18.00 855 $15,385 Equipment Maintenance (Butler) hrs $18.46 427 $7,888 Total Cameco and honeywell Barrels $53,903 * includes operator 42,735 Barrels (projected to 03/01/2012) 40 Barrels per load 0.4 Hours per load 427 Truck Hours Tons lbs. per barrel No. Drums CaF2 Calcined Regen KF UF4 1,686 3,842 551 1,756 2 727 320 406 309 547 4,636 24,013 2,714 11,366 7 7,837 42,735 Sub-Total Alternate Feed Disposal $64,232| TOTAL MILL DECOMMISSIONING I $2,058,398| 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev4.7.xls Denison Mines (USA) Corp. White Mesa Mill MILL DECOMMISSIONING WMM ALTERNATE FEED Ending Inventory, tons & barrels Projection to March 2012 Cabot Fansteel/FMRI Prior Year Ending Balance 6,157 11,177 2011 YTD Received 488 Proiected deliveries less Processed processing to 2011 March 2012 6,645 1,369 500 Ending Material Balance tons 500 9,808 17,334 488 10,308 tons tons GaF2- Honeywell Calcined Product- Cameco KF Product- Cameco Regen Product- Cameco UF4 Material- Cameco 1,083 2,349 1,455 324 2 2,315 1,493 216 162 tons tons tons 1,712 85 65 1,686 3,842 1,756 551 2 5,213 4,186 1,712 7,837 12/1/2011 - 1:49 PM-WMM Rec Plan Est December 2011 Rev 4.7.xls Denison Mines (USA) Corp. White Mesa Mill