Loading...
HomeMy WebLinkAboutDRC-2010-006186 - 0901a068801e458dDENISO MINES 1 o \vC>, 10-006 186 Denison IVIInes (USA) Corp. 10S0 17tii Street, Suite 950 Denver, CO 80265 USA Tel: 303 628-7798 Fax: 303 389-4125 www.denisonmine8.com November 29, 2010 Sent VIA Federal Express Mr. Rusty Lundberg Co-Executive Secretary Utah Water Quality Board Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144810 Sak Lake City, UT 84114-4820 Re: Transmittal of DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 3rd Quarter of 2010 Dear Mr. Lundberg: Enclosed please find two copies of the DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 3rd Quarter of 2010, as required under Parts 1.F.2 and I.F.3 of the White Mesa Mill's State of Utah Groundwater Discharge Permit No. UGW370004. Also enclosed are two CDs, each with an electronic word-searchable copy of the enclosed Report. If you have any questions regarding this Report, please contact the undersigned at (303) 389- 4132 or Mr. David Turk at (435) 678-2221. Yours very truly, DENISON MINES (USA) CORP. Jo Aim Tischier Director, Compliance and Permitting cc David C, Frydenlund Ron F. Hochstein Harold R. Roberts David E. Turk Kathy Weinel WHITE MESA URANIUM MILL DMT PERFORMANCE STANDARDS MONITORING REPORT AND CELL 4A BAT PERFORMANCE STANDARDS MONITORING REPORT 3rd Quarter July through September 2010 State of Utah Groundwater Discharge Permit No. UGW370004 Prepared By: Denison Mines (USA) Corp. 1050 17th Street, Suite 950 Denver, CO. 80265 November 29, 2010 TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................. 1 2.0 MEASUREMENTS TAKEN AND MONITORING PERFORMED DURING THE QUARTER ......................................................................................................................... 1 3.0 WEEKLY TAILINGS WASTEWATER POOL ELEVATION MONITORING ...... 1 4.0 MONTHL Y SLIMES DRAIN WATER LEVEL MONITORING ............................... 3 4.1 GENERAL .............................................................................................................................. 3 4.2 RESULTS FOR THE QUARTER ................................................................................................. 4 4.3 QUALITY ASSURANCE EVALUATION AND DATA VALIDATION .............................................. 5 4.4 GRAPHIC COMPARISON TO PREVIOUS yEAR ......................................................................... 5 5.0 WEEKLY WASTEWATER LEVEL MONITORING: ROBERTS POND ................ 5 6.0 WEEKLY FEEDSTOCK STORAGE AREA INSPECTIONS AND INSPECTIONS OF FEEDSTOCK MATERIAL STORED OUTSIDE THE FEEDSTOCK STORAGE AREA ............................................................................................................. 6 7.0 TAILINGS CELLS AND POND LINER SYSTEM REPAIRS .................................... 6 8.0 DECONTAMINATION PADS ......................................................................................... 7 8.1 SUMMARY OF WEEKLY WATER LEVEL (DEPTH) INSPECTIONS ............................................. 7 8.2 ANNUAL INSPECTION OF EXISTING DECONTAMINATION PAD ............................................... 8 8.3 NEW DECONTAMINATION PAD ............................................................................................. 8 9.0 CELL 4A BAT PERFORMANCE STANDARDS REPORT FOR THE QUARTER8 9.1 LDS MONITORING ................................................................................................................ 8 9.1.1 Operational Status of LDS Pumping and Monitoring Equipment ................................ 8 9.1.2 Measurement of Weekly Fluid Head at the Lowest Point in the Secondary Membrane . ... ............................................................... .................. ... ........................ ... 9 9.1.3 Measurement of the Volume of Fluids Pumped from the LDS ...................................... 9 9.2 MEASUREMENT OF WEEKLY WASTEWATER FLUIDS IN CELL 4A .......................................... 9 9.3 SLIMES DRAIN RECOVERY HEAD MONITORING .................................................................... 9 10.0 SIGNATURE AND CERTIFICATION ........................................................................ 10 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.dOcx LIST OF TABLES Table 1 -Summary of Waste Water Pool Elevations Table 2 -Cell 2 Slimes Drain Recovery Head and SDRE Values for 2009 Table 3 -Cell 2 Slimes Drain Recovery Head and SDRE Values for 2010 Table 4 -New Decontamination Pad Inspection Portal Level for the Second Quarter 2010 ATTACHMENTS A Tailings Cell and Roberts Pond Wastewater Elevations B Notices Pursuant to Part 1.G.3 of the Pennit C Monthly Cell 2 Slimes Drain Water level Over Time D Graph of Cell 2 Slimes Drain Water Levels over Time E Cell Liner R~pair Reports and Notices F Cell4A Leak Detection System Data for the Qu.arter il WHITE MESA URANIUM MILL DMT PERFORMANCE STANDARDS MONITORING REPORT AND CELL 4A BAT PERFORMANCE STANDARDS MONITORING REPORT FOR THE 3rd QUARTER OF 2010 1.0 INTRODUCTION This is the routine Discharge Minimization Technology ("DMT") Performance Standards Monitoring Report for the 3rd quarter of2010 (the "Quarter") prepared by Denison Mines (USA) Corp. ("Denison"), as required under Part I.F.2 of the White Mesa Mill's (the "Mill's") State of Utah Groundwater Discharge Permit No. UGW370004 (the "Permit"), and the Routine Cell 4A Best Available Technology ("BAT") Performance Standards Monitoring Report for the Quarter, as required under Part I.F.3 of the Permit. 2.0 MEASUREMENTS TAKEN AND MONITORING PERFORMED DURING THE QUARTER During the Quarter, the following DMT monitoring was performed or addressed, as required under Part I.E.7 of the Permit: • Weekly tailings wastewater pool elevations for tailings Cells 1 and 3; • Monthly slimes drain water levels in Cell 2; • Weekly wastewater level measurements in Roberts Pond; • Weekly feedstock storage area inspections and inspections of feedstock materials stored outside of the feedstock storage area; • Any tailings cell and pond liner system repairs; and • Decontamination Pad Concrete Inspection (not required this reporting period) Also during the Quarter, the following Cell 4A BAT performance standards monitoring was performed or addressed, as required by Part I.E.8 ofthe Permit: • Leak detection system ("LDS") monitoring for CeIl4A; and • Weekly tailings wastewater pool elevations for tailings Ce1l4A. 3.0 WEEKLY TAILINGS WASTEWATER POOL ELEVATION MONITORING Mill personnel monitored and recorded weekly the elevation of wastewater in Tailings Cells 1,3 and 4A to ensure compliance with the maximum wastewater elevation criteria mandated by Condition 10.3 of the Mill's State of Utah Radioactive Materials License No. UT 1900479 (the "License"). These measurements were made from an elevation survey. The results of such monitoring, reported as feet above mean sea level (fmsl), are included in Attachment A. 1 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx Condition 10.3 of the License provides that the freeboard limit for Cell 1 shall be set in accordance with procedures that have been approved by the U.S. Nuclear Regulatory Commission ("NRC"). Under those procedures the freeboard limit for Cell 1 is set as per the January 10, 1990 Drainage Report for CellI at a liquid maximum elevation of 5,615.4 fmsl. Condition 10.3 ofthe License also provides that the freeboard limit for Cells 3, 4A and 4B shall be recalculated annually in accordance with the procedures approved by the Executive Secretary of the State of Utah Radiation Control Board (the "Executive Secretary"). The current freeboard limit for Cell 3 was previously calculated under this procedure at 5,601.6 fmsl. However, in a letter from the Executive Secretary dated November 20, 2008, an interim variance and limit was established at 5,602.5 fmsl for Cell 3. During the weekly tailings survey measurement performed at approximately 1 :00 pm on July 30, 2010, the wastewater pool elevation in Cell 3 was measured to be 5,603.10 finsl, compared to the current freeboard limit for Cell 3 of 5,602.50 finsl, representing an exceedance of 0.6 feet, or 7.2 inches. During the weekly tailings survey measurement performed on July 23, 2010, the wastewater pool elevation in Cell 3 was measured to be 5,602.76 finsl, compared to the current freeboard limit for Cell 3 of 5,602.50 fmsl, representing an exceedance of 0.26 feet, or 3.12 inches. These exceedances of the freeboard limit for Cell 3 were the subject of a Notice to the Executive Secretary under Part I.G.3 of the Permit and Utah Administrative Code ("UAC") R317-6-6.16(C), dated August 4,2010, a copy of which is included in Attachment B. The Mill is filling Cell 3 to its final tailings solids capacity in preparation for closure, and Cell 3 is at this time nearly filled with solids and closure activities will begin shortly. The notice of August 4, 2010 explained that it is no longer possible to manage the Cell 3 freeboard to achieve the calculated freeboard limit during the final stages of filling Cell 3 with solids and closing Cell 3. The exceedances occurred despite the fact that monitoring and surveying were performed at the required frequency, all pumping equipment was operating properly, and the liquid transfer from Cell 3 to Cell 4A was occurring as planned. As discussed below, the freeboard limit for Cell4A has been set to accommodate Cell 3 as well as CeIl4A. In addition, Part I.D.2 of the Permit provides that under no circumstances shall the freeboard of any tailings cell be less than three feet, as measured from the top of the flexible membrane liner ("FML"). The top of the FML in Cell 1 is at 5,618.5 fmsl, the top of the FML in Cell 3 is at 5,608.5 fmsl and the top of the FML in Cell 4A is at 5,598.5 fmsl. This means that the maximum wastewater pool elevations in Cells 1, 3 and 4A permitted under Part I.D.2 of the Permit are 5,615.5, 5,605.5 and 5,595.5 fmsl, respectively. The wastewater pool elevations in Cells 1, 3 and 4A, as measured during the Quarter, are summarized in the following Table 1. Except as indicated in Table 1, the applicable freeboard limits were not exceeded during the Quarter for Cell 1 and Ce1l4A. As discussed above, Cell 3 is nearly full of solids and the freeboard limits are no longer meaningful. 2 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx Table 1-Summary of Waste Water Pool Elevations Tailings Maximum Maximum Maximum Cell Wastewater Elevation Wastewater Elevation Wastewater Measured During the Permitted Under Elevation Permitted Quarter (fmsl) License Condition Under Part I.D.2 of 10.3 (fmsl) the Permit (fmsl) Celli 5,614.22 5,615.4 5,615.5 Cell 3 5,604.88* 5,602.5** 5,605.5** Cell4A 5,588.68 5,593.74+ 5,595.5 *ThIS IS the maximum wastewater elevatIOn in Cell 3 durmg the Quarter. * * Cell 3 is nearly full of solids and the freeboard limit specified here is no longer meaningful. +The freeboard limit for Cell4A is not set out in the License. The freeboard limit of 5,593.74 for Cell4A is set out in a letter from the Executive Secretary dated November 20,2008. Denison has proposed in the DMT Plan revision dated November 12,2010 the removal of the freeboard limit for Cell4A to be replaced by a freeboard limit for new Cell4B that will accommodate the freeboard requirements of Cells 2,3, 4A, and 4B. It should be noted that the maximum elevation of 5,593.74 fmsl for Cell 4A has been set assuming that the total probable maximum precipitation ("PMP") volume for Cells 2, 3 and 4A will be accommodated in Cell 4A. By letter dated December 11,2008, Denison applied for an amendment to the License to set the freeboard limit for Ce1l4A at 5,593.74 finsl and to eliminate the need to set a freeboard limit for Cell 3, given that the freeboard limit of 5,593.74 fmsl for Cell 4A is adequate to accommodate the total PMP volume for Cells 2, 3 and 4A. The Utah Division of Radiation Control ("DRC") has indicated, in a letter of April 29, 2010, their agreement with Denison's proposed revisions to the freeboard limits for Cells 3 and 4A, pending Denison's submittal of revisions to the Permit and the White Mesa Mill Tailings Management System and Discharge Minimization Technology Monitoring Plan ("DMT Plan") reflecting the proposed changes. Denison prepared and submitted these revisions on November 12, 2010. 4.0 MONTHLY SLIMES DRAIN WATER LEVEL MONITORING 4.1 General Part I.D.3(b)(1) of the Permit provides that the Permittee shall at all times maintain the average wastewater recovery head in the slimes drain access pipes of each of Cells 2 and 3 to be as low as is reasonably achievable, in accordance with the DMT Plan. Part I.D.3(b)(3) of the Permit provides that for Cell 3, this requirement shall apply after initiation of dewatering operations. Similarly, Part I.D.6(c) of the Permit provides that, after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4A, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of the upper FML) in 6.4 years or less. Part I.D.3(b )(2) of the Permit provides that the Permittee shall conduct a monthly slimes drain recovery test at each tailings cell that meets the following minimum requirements: 1) includes a 3 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx duration of at least 90-hours, as measured from the time that pumping ceases, and 2) achieves a stable water level at the end of the test, as measured by three consecutive hourly water level depth measurements, with no change in water level, as measured to the nearest 0.01 foot. At this time, initiation of dewatering operations has not commenced in Cell 3 nor has the Mill initiated pumping conditions in the slimes drain layer of Cell 4A. As a result, the requirements in Part I.E.7(b) to monitor and record monthly the depth to wastewater in the slimes drain access pipes as described in Part I.D.3 of the Permit apply only to Cell 2 at this time. Accordingly, this Report is limited to slimes drain recovery head information relating to Cell 2 only. Pursuant to Parts 1.E.7(b) and I.F.2 of the Permit, Section 8.2 of the DMT Plan and correspondence from DRC, dated February 7, 2008, the results of monthly recovery monitoring of the slimes drain for Cell 2 are to be recorded and included with the results of quarterly monitoring in the quarterly White Mesa Mill DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report (the "DMT Reports"). Further, beginning in 2008, quarterly DMT Reports must include both the current year monthly values and a graphic comparison to the previous year. An annual slimes drain recovery head report, that addresses the requirements of Part I.F.11 of the Permit and Section 8.2 of the DMT Plan must be included in the 4th quarter DMT Report. 4.2 Results for the Quarter In accordance with these requirements, the individual monthly slimes drain recovery head monitoring data for the Quarter, which includes the date and time for the start and end of the recovery test, the initial water level, and the final depth to stable water level, is included as Attachment C to this Report. Those data, as well as the data for the previous year, including the slimes drain recovery elevations ("SDRE"), are summarized in the following Tables 2 and 3 and presented graphically in Attachment D. Table 2 -Cell 2 Slimes Drain Recovery Head and SDRE Values for 2009 Elevation of Reported Final Depth to SDRE Values Reported 2009 Test Closinl,! Date Measurement Point Stable Water Level as fmsl 1/30/2009 5,614.83 11.25 5,603.58 2/27/2009 5,614.83 9.35 5,605.48 3/28/2009 5,614.83 8.84 5,605.99 4/27/2009 5,614.83 11.98 5,602.85 5/20/2009 5,614.83 10.28 5,604.55 6/22/2009 5,614.83 13.00 5,601.83 7/30/2009 5,614.83 13.00 5,601.83 8/3112009 5,614.83 11.04 5,603.79 9/28/2009 5,614.83 11.46 5,603.37 10/30/2009 5,614.83 13.35 5,601.48 11123/2009 5,614.83 12.49 5,602.34 12114/2009 5,614.83 13.12 5,601.71 4 N:lRequired Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx Table 3 -Cell 2 Slimes Drain Recovery Head and SDRE Values for 2010 Elevation of Reported Final Depth to SDRE Values Reported 2010 Test Closine: Date Measurement Point Stable Water Level as fmsl 1115/2010 5,614.83 13.96 5,600.87 2/2112010 5,614.83 12.50 5,602.33 3/15/2010 5,614.83 11.04 5,603.79 4/12/2010 5,614.83 10.40 5,604.43 5119/2010 5,614.83 10.43 5,604.40 6/30/2010 5,614.83 10.13 5,604.70 8/2/2010 5,614.83 10.74 5,604.09 9/1/2010 5,614.83 10.65 5,604.18 9/24/2010 5,614.83 11.50 5,603.33 4.3 Quality Assurance Evaluation and Data Validation Denison management has evaluated all slimes drain data collected, data collection methods, and all related calculations required by the Permit, and have verified the accuracy and reliability of both the data and calculations reported. As a result of its quality assurance evaluation and data validation review, Denison has concluded that all of the 1 st, 2nd and 3rd Quarter 2010 and all of the 2009 monthly slimes drain tailings fluid elevation measurements set out in Tables 2 and 3 meet the test performance standards found in Part LD.3(b )(2) of the Permit and can be used for purposes of determining compliance with the requirements of Part LD.3(b )(2) of the Permit. 4.4 Graphic Comparison to Previous Year A graph showing the final depth to stable water level readings for each month in 2010 and 2009, for which validated data is available (see Section 4.3 above), is included as Attachment D, which shows a graphic comparison of this Quarter's data to data for the previous year. 5.0 WEEKLY WASTEWATER LEVEL MONITORING: ROBERTS POND During the Quarter, Mill personnel monitored and recorded weekly the wastewater levels at Roberts Pond to determine compliance with the DMT operations standards in Part LD.3(e) of the Permit. Part I.D.3(e) of the Permit provides that the water level in Roberts Pond shall not exceed an elevation of 5,624 fmsl. The maximum wastewater elevation measured in Robert's Pond during the quarter was 5,618.50 fmsl, which did not exceed the maximum permitted elevation of 5,624 fmsl. The results of such monitoring are included in Attachment A. 5 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx 6.0 WEEKLY FEEDSTOCK STORAGE AREA INSPECTIONS AND INSPECTIONS OF FEEDSTOCK MATERIAL STORED OUTSIDE THE FEEDSTOCK STORAGE AREA Weekly feedstock storage area inspections were performed by the Mill's Radiation Safety Department, to confirm that the bulk feedstock materials are stored and maintained within the defined area described in the Permit and that all alternate feedstock located outside the defined feedstock area is maintained within containers that comply with the requirements of Part J.D. 11 of the Permit. The results of these inspections are recorded on the Weekly Mill Inspection forms, which are available at the Mill for inspection. One item was noted during the weekly feedstock storage area inspections. On July 30, 2010 a drum of Regeneration Material, an alternate feed material, was knocked over and some of the contents were spilled. The spilled materials were cleaned up on the same day. 7.0 TAILINGS CELLS AND POND LINER SYSTEM REPAIRS The liner systems at Cells 1, 2, and 3 were inspected on a daily basis pursuant to the requirements of Sections 2.1 and 2.2 of the Mill's DMT Plan. The results of those inspections are recorded on the Mill's Daily Inspection Data sheets, which are available at the Mill for review. A visual inspection of Roberts Pond was performed on a weekly basis. The results of those inspections are recorded on the Weekly Mill Inspection forms, which are available at the Mill for review. In accordance with Part J.E.7(t) of the Permit, in the event that any liner defect or damage is identified during a liner system inspection, the Mill shall immediately implement the currently approved Liner Maintenance Provisions. Further, Part J.F. 2 of the Permit provides that when a liner repair is performed at any tailings cell or at Roberts Pond, a Repair Report shall be prepared and included with the next quarterly DMT report. Mill personnel detected an accumulation of fluid in the LDS standpipe of Cell 1 on Wednesday, June 2, 2010. Transfer of fluids from Cell 1 to Ce1l4A to lower the CellI level sufficiently to detect and repair any damage began on June 2,2010. Maintenance identified some FML damage and performed repairs during the period when the level was lowest. Following the repairs, the level was allowed to gradually return to its June 3 level of5614.57 feet and the LDS remained dry until, after a period of heavy rains in late July and early August (and an increase in the solution in level in Cell 1), a recurrence of the LDS liquid level was identified on August 7, 2010. At that time, Mill resumed pumping CellI to Cell 4 to lower the solution level. During discussions on August 12, 2010, DRC personnel agreed with Denison that both the June and August identifications of LDS solutions were part of one event. The temporary cessation of flow into the LDS between June and August detections may have resulted from lowering the solution level to a point below some tears or damage that were not identified during the July repair efforts. Denison submitted to DRC a plan and schedule for inspection and repair, if necessary, of the inside slope areas ofthe CellI FML above the 5613 foot level, on August 18, 2010, and updated plan on August 30, 2010. DRC conditionally approved the updated plan in a 6 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx letter dated September 22,2010. The updated plan commits to completion of the repairs by July 31,2012. The September 22 DRC letter and Part I.F.2 of the groundwater discharge permit require that the repairs be documented in a liner repair report which shall be included with the next quarterly DMT report, that is, following completion of the repairs to be reported. Consistent with the proposed date for completion of repairs in July 2012, Denison will include the required repair report with the third quarter DMT report to be submitted on December 1,2012. During the Quarter, no liner repairs were performed at any of the Mill's tailings cells other than Cell 1. Consistent with the approved repair plan and schedule, repairs to the Cell 1 FML are ongomg. 8.0 DECONTAMINATION PADS 8.1 Summary of Weekly Water Level (Depth) Inspections Section 3.1 of the DMT Plan requires that the vertical inspection portals on the New Decontamination Pad which are located between the primary and secondary containments be visually observed on a weekly basis as a means of detecting any leakage from the primary containment into the void between the primary and secondary containments. The New Decontamination Pad was placed into service on March 22, 2010. Use of the New Decontamination Pad was temporarily suspended during the second quarter 2010 as a result of a cease and desist order from DRC dated May 18,2010. Because the New Decontamination Pad was not in use, the weekly inspections of the containments were stopped. Table 4 below indicates the water level measurements in each portal measured during the second quarter 2010 that correspond to the last usage of the New Decontamination Pad. The data have been maintained here for information purposes only. Table 4 -New Decontamination Pad Inspection Portal Level for the Second Quarter 2010 Portal! Portal! Portal! Liquid Level Liquid Level Liquid Level Date (in Feet) (in Feet) (in Feet) 4/2/10 0.00 0.00 0.00 4/9/10 0.00 0.00 0.00 4/16/10 0.00 0.00 0.00 4/23/10 0.00 0.00 0.00 4/30/10 0.00 0.00 0.00 517110 0.00 0.00 0.00 5/14/10 0.00 0.00 0.00 5/21110 0.00 0.00 0.00 5/28/10 0.00 0.00 0.00 6/4/10 0.00 0.00 0.00 6/11/10 0.00 0.00 0.00 6/18/10 0.00 0.00 0.00 6/25/10 0.00 0.00 0.00 7 N:\Required ReportslDMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx As can be seen from the foregoing table, no fluids were observed to be present in any of the portals during the second quarter. 8.2 Annual Inspection of Existing Decontamination Pad As required by the Party I.H.5 (c) of the Permit, annual inspections of the existing decontamination were conducted during the second quarter 2010. The documentation for the annual inspections are reported in the Second Quarter DMT report submitted on August 30, 2010. 8.3 New Decontamination Pad As previously stated, the New Decontamination Pad was placed into service on March 22,2010. Use of the New Decontamination Pad was temporarily suspended as a result of a cease and desist order from DRC dated May 18,2010. DRC's approval for use of the New Decontamination Pad has been withheld pending submittal of revisions to the DMT Plan and DRC observation of hydrostatic testing of the in-ground water holding tanks. Revisions to the DMT Plan were submitted by Denison on November 12, 2010 and are currently under review by DRC. Hydrostatic testing will be re-performed during the fourth quarter of 20 1 0, and at the time of this report, advance notice has been provided to DRC to allow DRC staffto observe testing. The New Decontamination Pad was taken out of service and inspected during the second quarter on April 13, 2010 to ensure integrity of the washpad's exposed concrete surface, as required by Part I.H.4(a)3 of the Permit and Section 6.5 of the DMT Plan. No abnormalities were identified. No significant cracks (greater than 1/8 inch), deterioration or damage were identified. No repairs were required at the time of the inspection. A few minor cracks (less than 1/8 inch) were observed. These minor cracks are being monitored to determine whether they expand over time and require repair. 9.0 CELL 4A BAT PERFORMANCE STANDARDS REPORT FOR THE QUARTER This Section constitutes the routine Ce1l4A BAT Performance Standards Monitoring Report for the Quarter, as required under Part I.F.3 of the Permit. 9.1 LDS Monitoring 9.1.1 Operational Status of LDS Pumping and Monitoring Equipment The LDS pumping and monitoring equipment, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment operated continuously during the Quarter. 8 N:\Required Reports\DMT ReportslQ3 2010 DMT ReportlQ3 2010 DMT Report.docx During the Quarter, there were no failures of any pumping or monitoring equipment not repaired and made fully operational within 24-hours of discovery, as contemplated by Part LE.8(a)(I) of the Permit. 9.1.2 Measurement o/Weekly Fluid Head at the Lowest Point in the Secondary Membrane The readings pertaining to the fluid head above the lowest point in the secondary FML for Cell 4A are provided in Attachment F. As can be seen from a review of Attachment F, at no point in the Quarter did the fluid head in the Cell 4A LDS sump exceed a I-foot level above the lowest point in the lower FML on the Cell floor (where for purposes of compliance monitoring this 1- foot distance equates to 2.28 feet above the LDS system transducer), as stipulated by Part LE.8(a)(2) of the Permit. During the Quarter, the fluid head in the Cell 4A LDS sump did not exceed 9.7 inches above the LDS transducer. 9.1.3 Measurement o/the Volume 0/ Fluids Pumpedfrom the LDS The readings pertaining to the volume of fluids pumped are provided in Attachment F. As can be seen from a review of Attachment F, during the Quarter, the average daily LDS flow volume did not exceed 24,160 gallons/day, as stipulated by Part LE.8(a)(3) of the Permit. Based on the maximum head recorded on the FML during the Quarter of about 33 feet, the allowable flow rate would actually be approximately 23,299 gallons per day, as determined under the Mill's Cell 4A BAT Operations and Maintenance Plan, Table 1 (also included in Attachment F of this report), and assuming a liner elevation of 5555.55 feet and approximately 39.66 acres of liquid area. It is important to note that the calculation of the allowable flow rate per day is based on a maximum head of 35 feet, since Table 1 does not specify a rate for 33 feet of head. For third quarter 2010, a total of3,600 gallons were pumped. 9.2 Measurement of Weekly Wastewater Fluids in Cell4A Weekly fluid elevations for Cell 4A are provided in Attachment A along with elevations for Cells 1 and 3 and Roberts Pond. During the Quarter, the Mill operated and maintained wastewater levels in Cell 4A to provide the minimum vertical freeboard as required by Part LE.8(a)(4) of the Permit. See the discussion in Section 3 above. 9.3 Slimes Drain Recovery Head Monitoring As the Mill has not initiated pumping conditions in the Ce1l4A slimes drain system at this time, monthly recovery head tests and fluid level measurements are not required to be made at this time pursuant to Part LE.8(b) of the Permit. 9 N:\Required Reports\DMT Reports\Q3 2010 DMT Report\Q3 2010 DMT Report.docx 10.0 SIGNATURE AND CERTIFICATION This document was prepared by Denison on November 29,2010. By: David C Frydenlund Vice President, Regulatory Affairs and Counsel CERTIFICATION: I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the infl rmation submitted is, to the best of my knowledge and belief, true, accurate and complete. I a aware that there are significant penalties for submitting false information, includin t e pos ility of fine and imprisonment for knowing violations. Da d C. Frydenlund Vice President, Regulatory affairs and Counsel Denison Mines (USA) Corp. 10 N:\Required Reports\DMT ReportslQ3 2010 DMT ReportlQ3 2010 DMT Report.docx INDEX OF AITACHMENTS A Tailings Cell and Roberts Pond Wastewater Elevations B Notices Pursuant to Part I.G.3 of the Permit C Monthly Cell 2 Slimes Drain Water level Over Time D Graph of Cell 2 Slimes Drain Water Levels over Time E Cell Liner Repair Reports and Notices F Cell4A Leak Detection System Data for the Quarter Attachment A Tailings Cell and Roberts Pond Wastewater Elevations Roberts Date Cell 1 Cell 3 Cell4A Pond 7/2/2010 5613.65 5601.36 5586.66 5618.03 7/16/2010 5614.13 5601.86 5586.45 5618.50 7123/2010 5614.21 5602.76 5586.35 5618.37 7130/2010 5614.00 5603.10 5586.33 5618.42 8/6/2010 5614.22 5603.22 5586.45 5617.31 8/13/2010 5614.21 5603.24 5586.78 5618.09 8/20/2010 5613.81 5602.25 5587.53 5618.01 8/27/2010 5613.63 5602.86 5587.97 5617.63 9/3/2010 5613.26 5602.88 5588.33 5617.66 9/10/2010 5613.24 5604.62 5588.40 DRY 9/17/2010 5613.20 5604.44 5588.63 DRY 9124/2010 5613.36 5604.88 5588.68 5617.96 Attachment B Notices Pursuant to Part 1.0.3 ofthe Permit OENISOJ)~J MINES August 4, 2010 VIA PDF AND EXPRESS DELIVERY Rusty Lundberg, Co-Executive Secretary Utah Water Quality Board Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144810 Salt Lake City, UT 84114-4820 Dear Mr. Lundberg: Denllon MIne. (USA) Corp. 1050 17th Str •• t, Suite 950 Denver, CO 80265 USA Tel: 303 628·n98 Fax: 303 389-4125 www.d.nlsonmln ••• com Re: State of Utah Ground Water Discharge Permit No. UGW370004 White Mesa Uranium MiII-Notice Pursuant to Part I.G.3 of the Permit and UAC R317-6-6.16(C) Please take notice pursuant to Part I.G.3 of the White Mesa Mill's (the "Mill's") State of Utah Groundwater Discharge Pennit No. UGW370004 (the "Pennit") and Utah Administrative Code ("UAC") R313-6-6.16(C) that Denison Mines (USA) Corp. ("Denison"), as operator of the Mill and holder of the Pelmit, failed to meet the discharge minimization technology ("DMT") standards in Part I.D.2 of the Pennit, by allowing the wastewater elevation in the Mill's tailings Cell 3 to exceed the freeboard limit for that Cell by approximately 7.2 inches, as described in more detail below. This exceedance was discovered at 1 :00 pm on Friday July 30,2010. Initial notice of this failure to maintain DMT was given by telephone to the Utah Department of Environmental Quality ("UDEQ") by phone call to Mr. David Rupp at I :30 pm on August 2, 2010. 1. Facts and Background Information a) Condition 10.3 of the Mill's State of Utah Radioactive Materials License No. UT1900479 (the "License") provides that freeboard limits for Cells 1 and 3 shall be set in accordance with procedures that have been approved by the U.S. Nuclear Regulatory Commission ("NRC"). Under those procedures: (i) The freeboard limits are set as per the January 10, 1990 Drainage Report for Cell 1 at a liquid maximum elevation of 5,615.4 feet above mean sea level ("finsl"); (ii) The fi'eeboard limit for Cell 3 is determined annually using a formula set out in the procedure. The current fi'eeboard limit for Cell 3 was previously calculated under this procedure at 5,601.6 finsl. However, in UDEQ correspondence dated November 20, 2008 an interim variance and limit was established at 5,602.5 fmsl for Cell 3; (iii) In conjunction with the variance established under (ii) above, an interim maximum elevation for Ce114A was also established at 5,593.74 finsl; (iv) The maximum elevation of 5,593.74 fmsl for Cell 4A has been set assuming that the total probable maximum precipitation ("PMP") volume for Cells 2, 3 and 4A will be accommodated in Cell 4A. By letter dated December 11, 2008, Denison applied for an amendment to the License to set the freeboard limit for Cell 4A at 5,593.74 fmsl and to eliminate the need to set a freeboard limit for Cell 3, given that the freeboard limit of 5,593.74 fmsl for Cell 4A is adequate to accommodate the total PMP volume for Cells 2, 3 and 4A; and (v) In addition, Part 1.0.2 of the Permit provides that under no circumstances shall the freeboard of any tailings cell be less than three feet, as measured from the top of the flexible membrane liner ("FML"). The top of the FML in Cell 1 is at 5,618.5 finsl, and the top of the FML in Cell 3 is at 5,608.5 finsl. This means that Part 1.0.2 of the Permit provides a secondary requirement that the maximum wastewater pool elevations in Cells 1 and 3 cannot exceed 5,615.5 and 5,605.5 finsl, respectively. b) In a letter to Denison dated April 29, 2010, UDEQ has indicated their agreement with Denison's position that the freeboard limit is not applicable to Cell 3, since Cell 3 is in pre-closure stages, and the PMP flood volume of Cell 3 can be attributed to, and managed in, Cell 4A. The April 29 letter indicated that to formalize this removal of freeboard limit, Denison needed to provide revisions to two documents, specifically the Discharge Minimization Technology ("DMT") Plan, and the Cell 4A Operations and Maintenance ("O&M") Plan. The requested revisions to both the DMT Plan and O&M Plan are being submitted with this notice. c) During the weekly tailings survey measurement performed at approximately 1 :00 pm on July 30, 2010, the wastewater pool elevation in Cell 3 was measured to be 5,603.10 2 finsl, compared to the current freeboard limit for Cell 3 of 5,602.50 finsl, representing an exceedance of 0.6 feet, or 7.2 inches. d) During the weekly tailings survey measurement performed on July 23, 2010, the wastewater pool elevation in Cell 3 was measured to be 5,602.76 finsl, compared to the current freeboard limit for Cell 3 of 5,602.50 finsl, representing an exceedance of 0.26 feet, or 3. 12 inches. e) The July 23, 2010 elevation of Cell 3 was not reported to Denison's corporate personnel until August 2,2010, (while corporate personnel were collecting information regarding the exceedance on July 30). On August 2, 2010, Mill personnel advised corporate personnel that the primary person responsible for the weekly tailings inspection was on vacation on July 23,2010. The substitute personnel did perform the inspection and record the results; however, no notification was given to Denver Corporate personnel upon recording of the elevated liquid level. f) It should be noted that the current freeboard limit in Cell 3 of 5,602.5 fmsl is 6 feet below the top of the FML in Cell 3, so the exceedance of the current freeboard limit by 7.2 inches resulted in a wastewater pool elevation that was still over five feet below the top of the FML and over two feet below the secondary freeboard limit of 5,605.5 feet set out in Part 1.0.2 of the Permit. As a result, there was no risk of the wastewater in Cell 3 overflowing over the top of the Cell 3 FML. Also, as mentioned above, since the freeboard limit in Cell 4A has been set to accommodate the PMP event for Cells 2, 3, and 4A, there was also no risk that even if a PMP event were to occur there would not have been adequate freeboard available in Cell 4A. The wastewater elevation survey for Cell 4A performed on July 30, 2010 indicated a wastewater elevation 89 inches (7.4 feet) below the freeboard limit of 5,593.74 finsl for Ce114A. g) The Mill has been running on a 10-days on and 4-days off operating cycle. The 4-days off cycle resumed when the Mill shut down at 4:00 am on Saturday July 31, 2010. h) As part of the plan to fill Cell 3 with tailings solids and to close Cell 3, the Mill has been alternating between periods of pumping Cell 3 liquids into Cell 4A and discharging CCD solids into Cell 3. The transfer pump from Cell 3 to Ce1l4A operates for the duration of the 10 days that the Mill operates each run. The transfer pump was operating on July 23 and July 30. i) The intention was to discharge tailings solids into Cell 3 at a rate that, given the rate solutions were being pumped from Cell 3 to Cell 4A, would not result in an exceedence of the freeboard limit in Cell 3. Earlier in 2010, the Mill staff had replaced aENlsoNI)A,~ MINES 3 the existing pump in Cell 3 with a new pump to increase the flow rate of solutions fi'om Cell 3 to Cell 4A during the liquid transfer cycle. j) The Mill completed a cycle of removing liquids from Cell 3, and was in a cycle of operating and discharging CCD solids into Cell 3 at the time of the exceedence. k) Cell 3 was receiving only CCD solids and solutions from the Cell 2 slimes drain, and Ce1l4A was receiving all other tailings liquids, at the time of the exceedence. 2. Action Taken Upon receipt of the initial survey results, the Mill's Environmental Coordinator notified the Mill Manager at I 1 :55am that day. The following plan of action was immediately put into place in accordance with section 5.1 of the Mill's Contingency Plan: a) The transfer pump from Cell 3 to Cell 4A has been on and remains on in an effort to reduce the liquid level; b) Verbal notification was given to Mr. David Rupp ofUDEQ at 1:30 pm on August 2, 2010. The verbal notification was not given within 24 hours after discovery of the event, due to a miscommunication resulting in the failure of Denver staff to file the notification within that time period. This verbal notiiication was followed by this written notification within five days of discovery; c) Solutions continued to be pumped from Cell 3 to Cell 4A in order to reduce the solution in Cell 3; d) Compliance will be achieved during the week of August 2,2010. Solutions continue to be pumped from Cell 3 to Cell 4A to continue the reduction in the Cell 3 liquid level; and e) The Mill staff has been advised that required notifications need to occur even in the absence of primary environmental personnel, and backup staff are to be trained to contact corporate staff with timely notification oflevel exceedances. 3. Root Cause The root cause analysis is as follows 4 IlENISONl)i MINES a) The Mill has been alternating between continually pumping Cell 3 liquids into Cell 4A, while discharging CCO solids into Cell 3 during the Mill's operating periods. b) Cell 3 was receiving only CCD solids, and Cell 4A was receiving all tailings liquids at the time of the exceedence. The Mill continues to pump solutions from Cell 3 to Cell 4A before and while solids are introduced into Cell 3, in an effort to maintain the solution level in Cell 3 below the freeboard limit during this process. c) As a result of following the planned program of filling Cell 3 for closure, the remaining pond area in Cell 3 is small, approximately 7 to 10 acres, and is continually being reduced by the planned expansion of the solids beach as Cell 3 approaches its final tailings capacity. d) As a result of the decreasing pond area, the ability to manage the freeboard level has become increasingly difficult. e) Mill personnel received a copy of the April 29, 2010 letter from UDEQ which agreed with the need to remove the freeboard limit tl'om Cell 3 to allow filling and closure, and which identified plan documents that should be updated to reflect this change. f) Mill personnel were under the mistaken impression, as a result of the April 29, 2010 UDEQ letter, that the freeboard notification requirements for Cell 3 had been relaxed and instantaneous reporting of liquid levels was no longer required. g) Upon review of the circumstances, after the discovery of the exceedance, it is again evident that it is no longer possible to manage the Cell 3 freeboard to achieve the calculated freeboard limit during the final stages of filling Cell 3 with solids and closing Cell 3. The exceedence occurred despite the fact that monitoring and surveying were perfonned at the required frequency, all pumping equipment was operating properly, and the liquid transfer from Cell 3 to Cell 4A was occurring as planned. 4. Actions That Will be Taken to Prevent a Reoccurrence of this Incident The following actions will be taken to prevent a reoccun-ence of this incident: a) The Mill will continue to pump liquids from Cell 3 to Cell 4A, in preparation for dewatering and closure of Cell 3; and b) Denison has completed and submitted with this notice draft revisions to the documents identified in UDEQ's April 19,2010 letter, to document the elimination of freeboard 5 OENISONI)~ I~ MINES limits for Cell 3. 5. Affirmative Defense Denison believes that the affirmative defense in Pmt LG.3.c) of the Permit should be applicable to this incident, for the following reasons: a) Notification By viltue of the initial oral notification given to the UDEQ Duty Officer at I :30 pm on August 2, 2010, and this written notice, Denison has submitted notification according to UAC R317-6- 6.13. The oral notification exceeded the 24 hour requirement, but Denison submits that substantial compliance with the notification requirements have been met in the circumstances, given that Cell 3 freeboard limit is a matter that is currently under discussion between Denison and UDEQ. b) Failure was not Intentional or Caused by the Petmittee's Negligence The exceedance of the freeboard limit was not intentional or caused by Denison's negligence, either in action or in failure to act. The Mill was taking actions to manage the freeboard requirements of all of its active tailings cells while filling Cell 3 to its final tailings solids capacity in preparation for closure. Based on a survey of the wastewater elevation in Cell 3 taken the week of Friday July 16, it appeared that there was ample freeboard in Cell 3, and, based on past Mill experience it was not unreasonable for Mill staff to come to that conclusion. The fact that the water level in Cell 3 increased at an unexpectedly fast rate was due to the planned discharge of CCD solids into Cell 3 coupled with the issue of managing liquids in a pool of decreasing size as the solids fill the cell. This discharge, and the pool's size reduction, are necessary to complete the filling and closure of the Cell. c) The Permittee has Taken Adequate Measures to Meet Petmit Conditions Denison has taken adequate measures to meet Permit conditions in a timely manner. The provisions of the Mill's Contingency Plan are being implemented at the time of this notice. d) The Provisions of UCA 19-5-107 Have Not Been Violated The provisions of Utah Code 19-5-107 have not been violated. There has been no discharge of a pollutant into waters of the state. Denison has not caused pollution which constitutes a menace to public health and welfare, or is harmful to wildlife, fish or aquatic life, or impairs domestic, OENISONI)~ :l,J MINES 6 agricultural, industrial, recreational, or other beneficial uses of water, nor has Denison placed or caused to be placed any waste in a location where there is probable cause to believe it will cause pollution. There was no discharge of solutions from the Mill's tailings impoundments, and there was ample freeboard in Cell 4A to accommodate the PMP for Cells 2, 3, and 4A. Please contact the undersigned if you have any questions or require any further information. Yours truly, ~~ JoAnn Tischler Director, Compliance and Permitting cc: Rich Bartlett David C, Frydenlund Ron F. Hochstein Ryan Palmer Harold R. Roberts David E. Turk f)ENISOJ)~ ~ MINES 7 Attachment C Monthly Cell 2 Slimes Drain Water level Over Time MONTHLY HEAD MEASUREMENT TEST Location: Date: 7/26/10-8/2/10 Slimes Cell # 2 Sampler: Tanner Holliday Garrin Palmer 7/26/2010 7/27/2010 7/28/2010 7/29/2010 7/30/2010 8/1/2010 8/2/2010 600 700 16.09 14.19 13.16 12.32 10.74 800 23.95 15.99 14.15 13.13 12.30 10.74 900 23.18 15.90 14.10 13.10 12.28 10.74 1000 22.25 15.82 14.05 13.05 12.24 1100 21.61 15.64 14.00 13.01 12.22 1200 20.99 15.53 13.95 12.98 12.21 1300 20.55 15.42 13.89 12.94 12.14 1400 20.13 15.32 13.83 12.86 12.10 1500 19.79 15.24 13.77 12.82 12.05 1600 10.94 10.74 Comments: Report number that will be used is 10.74 MONTHLY HEAD MEASUREMENT TEST Location: Date: 8/25/2010 Slimes Cell # 2 Sampler: Tanner Holliday Garrin Palmer 8/25/2010 8/26/2010 8/27/2010 8/28/2010 8/29/2010 8/30/2010 8/31/2010 9/1/2010 600 700 15.85 13.92 11.46 11.08 10.65 800 15.75 13.88 11.43 11.06 10.65 900 21.85 15.61 13.83 11.42 11.05 10.65 1000 21.40 15.50 13.77 11.40 11.04 1100 20.96 15.44 13.70 11.38 11.03 1200 20.38 15.34 13.62 11.36 11.00 1300 19.97 15.25 13.58 11.32 10.97 1400 19.58 15.15 13.52 11.29 10.95 1500 19.23 15.04 13.45 11.56 11.25 10.93 1600 10.65 Comments: Slimes Drain was started a little late on the 25th of August. The full test was completed on September 1st 2010. the report number is 10.65 for this, August 2010. MONTHLY HEAD MEASUREMENT TEST Location: Date: 9/24/2010 Slimes Cell # 2 Sampler: Tanner Holliday Garrin Palmer 9/20/2010 9/21/2010 9/22/2010 9/23/2010 9/24/2010 600 700 15.35 13.07 11.99 11.50 800 25.95 15.20 13.00 11.98 11.50 900 23.78 ·15.06 12.95 11.97 11.50 1000 23.22 14.90 12.90 11.96 1100 22.30 14.77 12.85 11.94 1200 21.48 14.65 12.79 11.92 1300 20.67 14.52 12.73 11.89 1400 20.32 14.40 12.67 11.87 1500 19.75 14.28 12.61 11.84 1600 Comments: Report number that will be used is 11.50 Attachment D Graph of Cell 2 Slimes Drain Water Levels over Time n It) N (I' --0 3 It) en C Dl -0 ::::J N o o U) RO N o ~ o til ro .., iii' III I-' c: :J ro Ql .., VI ro .., ~' .!:: I-' O'l I-' .j:> I-' N Feet Below Top of Standpipe I-' o 00 O'l .j:> N o I " I 1-1/30/2009 2/20/2009 3/13/2009 4/3/2009 4/24/2009 5/15/2009 6/5/2009 6/26/2009 7/17/2009 8/7/2009 -8/28/2009 9/18/2009 10/9/2009 10/30/2009 11/20/2009 12/11/2009 1/1/2010 1/22/2010 2/12/2010 3/5/2010 3/26/2010 4/16/2010 5/7/2010 5/28/2010 6/18/2010 7/9/2010 7/30/2010 8/20/2010 9/10/2010 Attachment E Cell Liner Repair Reports and Notices This Attachment was intentionally left blank. There were no Cell liner repair notices submitted during this reporting period. Attachment F Ce1l4A Leak Detection System Data for the Quarter Cell 4A lOS Monitoring Information July 2010 Date 7/9/2010 7/16/2010 7/23/2010 7/30/2010 Measurements in Inches 9.0 9.7 0.8 1.3 Flow Meter in Gallons 257250 257250 260731 260731 Highest level for the month was 9.7 inches. Total number of gallons pumped was 3,481. August 2010 Date 8/6/2010 8/13/2010 8/20/2010 8/27/2010 Measurements in Inches 0.0 0.0 1.0 0.5 Flow Meter in Gallons 260850 260850 260850 260850 Highest level for the month was 1.0 inches. Total number of gallons pumped was 119. September 2010 Date 9/3/2010 9/10/2010 9/17/2010 9/24/2010 10/1/2010 Measurements in Inches 1.1 2.2 2.1 3.9 3.0 Flow Meter in Gallons 260850 260850 260850 260850 260850 Highest level for the month was 3.9 inches. Total number of gallons pumped was O. ! 1 . I I. Table 1 calculated Action Leakage Rates for VarIous Head Conditions Cell 4A White Mesa Mill Blanding. 4tah Head Above Liner Calculated Action Leakage System (feet) Rate (gallons/acre/dav) 6 222.04 10 314.01 16 384.58 20 444.08 25 496.50 30 543.88 35 587.46 37 604.01 GeoSyntec Consultants ~ ..