Dave,
The cushion geotextile flap (sewn seam) can be placed on either side of the header pipe as it is a feature not related to the
performance of the filter geotextile other than to seal the edge. The cushion geotextile and overlying woven geotextile currently
conform to the intent of the design drawings and the additionai requirements outlined in the permit.
The sand bags will be rearranged to provide continuous coverage (end to end, not side to side) along both the woven geotextile
flaps. We will send photos of the completed sand bag rearrangement v^rhen complete.
Please let us know if you have questions or need additional Information.
Regards,
Greg
—^Original Message—
From: Steve Snyder [mailto:SSnyder@denisonmines.com]
Sent: Tuesday, December 14, 2010 3:12 PM
To: Greg Corcoran
Subject: FW: Requirement for Cell 4B: GWDP Part I.H.11
Greg,
Please see the email from the State below.
• (
Steve Snyder
Plant Engineer
t: 435-678-2221 xi 01 I c: 435-459-9994 I f: 435-678-2224
6425 S. Highway 191, PO Box 809, Bianding, UT 84511
DENISON MINES (USA) CORP ,
http://www.denisonmines,com/ This e-mail is intended for the exclusive use of the person(s) mentioned as the recipient(s). This message and any attached files
vAVn it are confidential and may contain privileged or proprietary information. If you are not the intended recipient(s) please delete
this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s).
—Original Message—
From: Harold Roberts
Sent: Tuesday, December 14, 2010 3:20 PM
Cc: Steve Snyder
Subject: Re: Requirement for Cell 4B: GWDP Part I.H.11
Make sure Greg gets this. v
Sent using BlackBerry
Harold Roberts
Executive Vice President, US Operations
t: (303)389-4160 | f: (303) 389-4125
1050 17th Street, Suite 950, Denver, CO 80265
DENISON MINES (USA) CORP
http://wvw.denlsonmines.com/
This e-mail is intended for the exclusive use of the person(s) mentioned as the recipient(s). This message and any attached files
with it are confidential and may contain privileged or proprietary information, if you are not the intended recipient(s) please delete
this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s).
(1/20/2011) Sonja Robinson - FW: Requirement for Cell 4B: GWDP Part I.H.11 Page 2
— Original Message -—
From: Dave Rupp <DRUPP(gutah.gov>
To: Harold Roberts
Cc: Steve Snyder; Loren Morton <lmorton(gutah.gov>
Sent: Tue Dec 14 16:44:27 2010Subject: Requirement for Cell 4B: GWDP Part I.H.11
Harold,
We are currentiy reviewing the Cell 4B Construction Quality Assurance (CQA) Report. As a courtesy, we wish to notify you that
we have discovered the subject requirements in the Ground Water Discharge Permit (GWDP), which affect the Ceil 4B project.
Part I.H.11 of the GWDP reads as follows:
"11. Corrections to Engineering Dravinng Sheet 6 of 8 - prior to construction of Cell 4B, the
Permittee shall revise Cross-section B-7 presented in Engineering Drawing Sheet 6 of 8 and
any related technical specifications, to reflect the following changes:
(a) Both cushion geotextile material flaps must be extended at least 1-foot laterally
beyond the sewn seam at the right (north) side of toe of the drainage aggregate
windrow, and
(b) Sandbags placed on both the right (north) and left (south) side of the drainage
aggregate windrow, must be placed and abutted continuously along the length of the
vflndrow."
We are not aware if the above changes are included on the current as-built drawings ih the CQA Report. Also, it appears item
11 .b. above has not been implemented in the field:
Please assure the following;
1. If not already included, please submit the above drawing corrections as addenda In the Cell 4B Construction Quality
Assurance Report.
2. Implement the requirements of item 11 .b in the work, and provide written documentation, with dated photographs, certified
by a Utah-licensed Professional Engineer, that demonstrates completion of this requirement, and include it as part of the Ci3A
report.
The subject items, and others, are required to be completed for DUSA to receive DRC authorization to operate Cell 4B. This
email has been provided as a early notice regarding the subject, and because we believe DUSA is desirous to rapidly complete all
requirements needed to begin operation of Cell 4B. If you have any questions on the above, please contact me. - -
David A. Rupp, P.E.