Loading...
HomeMy WebLinkAboutDRC-2010-002776 - 0901a0688017a6a5State of Utah GARY R. HERBERT Governor GREG BELL Ueulenant Govenwr Department of Environmental Quality Amanda Jbmilh Executive Director DIVISION OF RADIATION CONTROL Dane L. Finerlrnck Director DRC-201C-GC2776 U.S. Postal Service-.' CERTIFIED MAIL.' RECEIPT (Domestic fi/tail Only; No Insurance Coverage Provided) For delivery information visit our website at www.-usps.com April 8. 2010 CERTIFIED MAIL RETURNED RECEIPT REOUESTED Mr. David C. Frydenlund Vice President, Regulatory Affairs and Counsel Denison Mines (USA) Corp. (DUSA) Independence Plaza, Suite 950 1050 Seventeenth Street Denver, CO 80265 rr LH m • I n-a~ r- o • a a n i-=i r~ r- in RE: APR(L,2009 DUDA OP AND MAINTNCE- CONDITIONA APPRV LTR DATE: APRIL 8, 2010/DH. POBlags CerBfied Fea Retum Rscelpt Feo (Endorsement Required) Reslrided Delivery Fea Poslmarti More ll„l,ll l.l.llu.l.l.l.lul MR DAVID C FRYDENLUND VICE PRESIDENT AND GENERAL COUNSEL DENISON MINES (USA( CORP (DUSA) 1050 17TH STREET STE 950 DENVER CO 80265 SUBJECT; April, 2009 DUDA Operations and Maintenance Plan Chloroform Pumping Syslem, Chlorofonn Contamination Investigation, White Mesa Uranium Mill, - Conditional Approval Letter Dear Mr. Landau: The Division OfRadiation Control (hereafter 'DRC") has reviewed the April 2009 Operations and Maintenance Plan Chloroform Pumping System at the White Mesa Uranium Mill that was submitted to DRC by DUSA May 4, 2009 (hereafter *'Plan"). The submitted Plan is in response to a ConFirmatory Action Letter issued by DRC dated April 14, 2009. Based on our review the Plan is conditionally approved with the following modifications: 1. Item 4 in the Winterization For Long-Term Operations section ofthe Plan needs to be modified with the following wording changes (modifications are underlined and delefions are strikelhrough): 'The proiective features, discharge line placement and winter inspections described in items 1), 2) and 3) above will apply to not only lhef4) {5} pumping wells currently in operation, but will apply also to any future pumping wells associated with the chloroform pumping system." 2. The following parts ofthe Operations section of the Plan need tobe removed: • The 3'^ paragraph in the Operations section. • Item 1 "Background'", in the Operations section. • Item 2 "Quaiterly Water Levels", in the Operaiions section. • Item 3 "Proposed Water Level Targets" in the Operations section. Instead, the definitions and performance standards for overall function ofthe chloroform pump and treat sy.stem to hydraulically contain and control the groundwater contaminant plume IfiS North l')50 West • Salt Uke Ciiv, UT Mailing Addrcis: P.O. Box I44S50 • Sair Lake Cify. UT K4 ? I4-IS50 Telephone 1801) 536-4250 • Fax (HIH) 5:ii-40q7 -TDD. (801) 5.16 4414 wi\'n-.(trq.lilnH.i;(ii- Printed on IOO* reLvrled |>;iper Page 2 needs to be left lo the final Corrective Action Plan (CAP). The DRC recognizes your August 21, 2007 submittal ofa preliminary CAP, which is currently under review. DRC comments on that document will be forthcoming shortly. 3. The Maintenance section ofthe Plan (modificalions are underlined and deletions are strikethrough): When a system failure occurs and is not repaired and fullv made operational within 24 hours of discovery DUSA shall call the Executive Secretarv to verballv report the svstem failure AU nystcm ropairs will bo completed within 2A hours of said discovory and will be reported to the Executive Secretary in a written report within 5 days ofthe failure. Said written failure report shall contain the following information: a) A description of the pumping system failure(s) and their root causefs) b) The period of lime that the pumping system was not or will not be in operation c) The date by which the pumping svstem will be repaired and fully operational d) Steps taken or lhat will be taken to repair and make the pumping system fully operational e) Steps taken or that will betaken to eliminate, and ef prevent reoccurrence of pumping system failure(s) f) Each system failure and corrective actions, listed above, will be summarized in the corresponding quarterly chloroform groundwater moniloring reports In addition, all system failures will be reported in the followine quarterly chloroform groundwater monitoring report. 4. At the end ofthe Introduction section ofthe Plan the following wording needs to be added; "This operations and maintenance plan is required for all pumping wells approved by lhe Executive Sectary associated with the chloroform pumping system." In our conference call on April 7, 2010 it was agreed that within 30 days of the receipt of this letter DUSA would provide, in electronic PDF format, both a final copy of the Plan and a copy of the Plan in redline strikeout format showing the above modificafions requested. If this was not your understanding please respond in writing with in three (3) calendar days of receiving this letter. Thank you for your cooperation in this matter. If you have any quesfions call Dean Henderson at 1-801-536-0046. UTAH WATER QUALITY BOARD DaneLFineiffrock Co-Executive Secretary DCH:dh