Loading...
HomeMy WebLinkAboutDRC-2009-002082 - 0901a0688011922ft>tC'9w^{'00'7^'^X >» Steve Landau <SLandau@denisonmines.com> 5/19/2009 5:07 PM >>> Dear Mr. Finerfrock, Please find attached a written notice In accordance with Part I.G.3,(a) of the GWDP for the White Mesa Mill. The notice pertains to a repair of the liner In Cell 1 on the dyke, and above the pond solution level. This Is a follow-up to the oral notification given the UDEQ Emergency Reporting Staff on May 15, 2009. Should you have any questions regarding this notice, please contact me. Yours truly, Steven D. Landau Manager, Environmental Affairs Steve Landau Manager, Environmentel Affairs t: (303) 389-4132 | f: (303) 389-4125 1050 17th Street, Suite 950, Denver, CO 80265 DENISON MINES (USA) CORP www.denisonmines.com { httD,7/www.denisonmlnes,com/,) This e-mail is intended for exclusive use the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. If you are not the intended reclplent(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the Intended recipient(s). D i : D«ni«on Mines (USA) Corp. & I 105017tft StTMt, Suite 9S0 m 01 D«nv«r, CO 80263 •mM "»A AMINES Tal: 303 628-7798 Fax: 303 389-412S www.danltonininas.com May 19,2009 Mr. Dane Finerfrock, Executive Secretary Utah Radiation Control Board Utah Department ofEnvironmental Quality 168 North 1950 West P.O. Box 144810 Salt Lake City, UT 84114-4810 Dear Mr. Finerfi"ock: Re: White Mesa Mill Cell No. 1 Liner Repair GWDP UGW37004- Part I.G.3.(a) Notification In accordance with the provisions of Denison's procedure. Liner Maintenance Provisions-Cells 1,2,3 and Roberts Pond dated October 6, 2008, and Part I.G.3.(a) ofthe Ground Water Discharge Permit, the following information is provided as a written follow-up to our oral notification that was given to UDEQ's Emergency Reporting staff on May 15, 2009. On May 14, 2009 at approximately 4:00 PM the Mill initiated work to repair a plugged tailings line on the dyke near the Northeeist corner of Cell 1. The tailings pipe connection flange was disassembled to allow flushing ofthe line, which unfortunately released a significant outflow of tailings solufion and sand that eroded the soil cover over the liner exposing a part ofthe liner. The exposed liner was observed to be damaged which appears to have been caused by the force ofthe outflow, which also eroded some ofthe underlying soils. This occurred at the lip edge of the dyke near the anchor trench well above the solution level. Because of the saturated soil in the area ofthe damage, it will be several days before we can assess the extent ofthe damage and make the required repairs. Repair work will involve the installation ofa PVC repair patch over the damaged PVC liner, above the solufion level in the pond. Subsequent to the repair installafion, the glued seams will need to be tested by means of a vacuum box in order to assure that all seams are intact and that no leakage will occur. Once that test is completed, the area will be recovered with earthen material in order to preclude damage ofthe PVC from sunlight. In accordance with Denison's procedure, Liner Maintenance Provisions-Cells 1,2,3 and Roberts Pond dated October 6, 2008, Denison will issue a repair report once the work is completed, including the information specified in the procedure. Ifyou should require additional infoimation about this matter please contact me. Yours very tmly. DENISON MINES (USA) CORP. STEVEN D. LANDAU MANAGER, ENVIRONMENTAL AFFAIRS DENISON J? MINES