HomeMy WebLinkAboutDRC-2012-001568 - 0901a068802e2318State of Utah
GARY R. HERBERT
Govemor
GREG BELL
Lieutenani Governor
Department of
Environmental Quality
Amanda Smith
Exeaitive Director
DIVISION OF RAD LOTION CONTROL
Rusty Lundberg
Director
C.2012-00 1568
June 7, 2012
Jo Ann Tischler
Director, Compliance and Pennitting
Denison Mines (USA) Corp.
1050 Seventeenth St. Suite 950
Denver, Colorado, 80265
Subject: Denison Mines (USA) Corp., Jime 6, 2012 Revised White Mesa Uranium Mill Ground
Water Quality Assurance Plan, Rev. 7.2: Approval
Dear Ms. Tischler:
The Utah Division of Radiation Control (DRC) has reviewed the Denison Mines (USA) Corp.
(DUSA) June 6, 2012 Wliite Mesa Uranium Mill Groundwater Monitoring Quality Assurance
Plan Revision 7.2. DRC notes that the only changes made per this revision were to the header
(update of revision number and preparation date), and the Attachment 2-3 section specifymg the
well purging method for monitoring wells which are purged to dryness. Specifically, the revision
replaces the term "redox potential" with "temperature" for two instances.
QAP Rev. 7.2 DRC Approval
Based on DRC review of the White Mesa Uranium Mill QAP Revision 7.2, it appears that the
revisions are appropriate and consistent with agreed on purging methodology, therefore, QAP
Revision 7.2 is approved.
Ifyou have any quesfions regarding this letter please contact Tom Rushing at (801) 536-0080.
Sincerely,
Rusty Lundberg, Director 0
RL:TR:tr
F \DUSA\QAP\QAP Rev 7 2\QAP Revision 7 2 DRC Approval Ltr docx
195 North 1950 West • Salt Lake City, UT
Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 -TDD (801) 536-4414
WI.-W deq Utah gov
Pnnted on 100*!'o recycled paper