HomeMy WebLinkAboutDRC-2013-002983 - 0901a068803b043aDepartment of
Environmental Quality
Amanda Smith
Acting Executive Director
JON M. HUNTSMAN, JR
Governor
DIVISION OF RADIATION CONTROL
Rusty Lundberg
Director" DRC-2013-002983
GARY HERBERT
Lieutenant Governor
July 2, 2013
Jo Ann Tischler
Director, Compliance and Permitting
Energy Fuels Resources (USA) Inc.
225 Union Blvd., Suite 600
Lakewood, CO 80228
Dear Ms. Tischler:
SUBJECT: Compliance: Cell 1 Liner Repairs; Radioactive Materials License UT1900479 (RML)
and Groundwater Discharge Permit (GWDP) UG370004, Energy Fuels Resources, Inc.
(EFR) White Mesa Mill, Blanding, Utah; Closeout
On September 25, 2012 the Utah Division of Radiation Control (DRC) extended approval of the
Cell 1 Liner Repair project. The DRC elected to keep the file open pending fluid levels in Cell 1
reaching sufficient elevation to provide a 30-day wet test of liner integrity and verify that the liner
repair was successful. On May 30, 2013, the DRC received the First Quarter, 2013 DMT
Performance Standards Monitoring report in which Energy Fuels Resources documented fluid
levels in Cell 1 above the repair section for the entire quarter with no fluid detected in the leak
detection system.
On June 6, 2013 during a site inspection the DRC also verified that solution in Cell 1 was above
the repair elevation of 5613 feet. In light of this information, the Cell 1 Liner Repair project is
closed out.
If you have any questions please contact Russell J. Topham, P.E. at (801) 536-4256.
Sincerely
RL:RJT:rjt
168 North 1950 West • Salt Lake City, UT
Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 • T D D (801) 536-4414
www deq Utah gov
Printed on 100% recycled paper