Loading...
HomeMy WebLinkAboutDRC-2013-002983 - 0901a068803b043aDepartment of Environmental Quality Amanda Smith Acting Executive Director JON M. HUNTSMAN, JR Governor DIVISION OF RADIATION CONTROL Rusty Lundberg Director" DRC-2013-002983 GARY HERBERT Lieutenant Governor July 2, 2013 Jo Ann Tischler Director, Compliance and Permitting Energy Fuels Resources (USA) Inc. 225 Union Blvd., Suite 600 Lakewood, CO 80228 Dear Ms. Tischler: SUBJECT: Compliance: Cell 1 Liner Repairs; Radioactive Materials License UT1900479 (RML) and Groundwater Discharge Permit (GWDP) UG370004, Energy Fuels Resources, Inc. (EFR) White Mesa Mill, Blanding, Utah; Closeout On September 25, 2012 the Utah Division of Radiation Control (DRC) extended approval of the Cell 1 Liner Repair project. The DRC elected to keep the file open pending fluid levels in Cell 1 reaching sufficient elevation to provide a 30-day wet test of liner integrity and verify that the liner repair was successful. On May 30, 2013, the DRC received the First Quarter, 2013 DMT Performance Standards Monitoring report in which Energy Fuels Resources documented fluid levels in Cell 1 above the repair section for the entire quarter with no fluid detected in the leak detection system. On June 6, 2013 during a site inspection the DRC also verified that solution in Cell 1 was above the repair elevation of 5613 feet. In light of this information, the Cell 1 Liner Repair project is closed out. If you have any questions please contact Russell J. Topham, P.E. at (801) 536-4256. Sincerely RL:RJT:rjt 168 North 1950 West • Salt Lake City, UT Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T D D (801) 536-4414 www deq Utah gov Printed on 100% recycled paper