January 28,2013
CERTIFIED MAIL
(Return Receipt Requested)
Jo Ann Tischler, Director, Compliance
Energy Fuels Resources (USA) Inc
225 Union Boulevard, Suite 600
Lakewood, CO 80228
a
ja m
r=\
[T
m
IT
a o a
a
CO
cr a a
U.S. Postal Service rn
CERTIFIED MAIL , RECEIPT
(Domestic Mail Only; No Insurance Coverage Provided)
For deliverv information visit our website at www.usps.come
o F 1 C . USE
Postage
Certified Fee
Retum Receipt Fee
$
Postmark
. Here
RE 1/28/13, request for extension -approval/TR
JO ANN TISCHLER
ENERGY FUELS RESOURCES (USA) INC
225 UNION BLVD . STE 600
LAKEWOOKCO 80228
PS Form 3»00, August 200S See Reverse for Instructions
Subject Energy Fuels Resources (USA) Inc January 24,2013 Request for Extension of
Time to Submit the Nitrate Corrective Action Plan Phase I Surety Estimate,
Stipulated Consent Order Docket No UGW12-04 DRC Approval
Dear Ms Tischler: DRC.2013-001156
This IS in response to your e-mail request dated January 24, 2013 (4.05 P.M ) Your e-mail
requests an extension of time for Energy Fuels Resources (USA) Inc ("EFR") to submit a revised
surety cost estimate. As you are aware, the surety due date is required by Stipulation and Consent
Order Docket No UGW12-04 ('SCO") Item Ell. Per Item E 11 , the revised surety cost
estimate is reqmred to be submitted by EFR for Director Review and Approval on or before 60
calendar days from the effective date of the SCO. The SCO was signed on December 12,2012,
therefore, the revised surety cost estunate is currently due on or before February 9,2013.
Your extension request is based on time needed by EFR to conduct; "o/ze to three additional rows
of samples, as well as at least six additional samples to assist in bounding the contamination''' at
the ammoma sulfate crystal tanks m order to produce a surety cost estimate for the Phase I
excavation volume. Per a teleconference between you and DRC staff on January 23,2013, you
stated that the ongmal three rows of soil bonngs/samples failed to delmeate the plume boundary
(values at the outermost samples exceed 2 times background concentrations for ammoma and/or
mtrate).
Based on the January 23, 2013 teleconference and your January 24,2013 e-mail request, the
extension of time is approved for an additional 60 calendar days from the onginal deadlme
specified in the SCO Part E.l 1. The revised surety cost estimate is due on or before Apnl 10,
2013
195 North 1950 West • Salt Lake City, UT
Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 'TDD (801) 536-4414
www deq utah gov
Pnnted on 100% recycled paper
Jo Ann Tischler
Page 2
Also, please be aware that per the SCO Part E 6 , all Phase I analytical data is required to be
submitted to the Director withm 60 days of EFR receipt of all the Phase I soil samphng data
results.
If you have questions regarding this letter, please contact Tom Rushing at (801) 536-0080.
Sincerely, '
Rusty Lundberg
Director
RLTRtr