Loading...
HomeMy WebLinkAboutDRC-2013-001156 - 0901a06880345936State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director January 28,2013 CERTIFIED MAIL (Return Receipt Requested) Jo Ann Tischler, Director, Compliance Energy Fuels Resources (USA) Inc 225 Union Boulevard, Suite 600 Lakewood, CO 80228 a ja m r=\ [T m IT a o a a CO cr a a U.S. Postal Service rn CERTIFIED MAIL , RECEIPT (Domestic Mail Only; No Insurance Coverage Provided) For deliverv information visit our website at www.usps.come o F 1 C . USE Postage Certified Fee Retum Receipt Fee $ Postmark . Here RE 1/28/13, request for extension -approval/TR JO ANN TISCHLER ENERGY FUELS RESOURCES (USA) INC 225 UNION BLVD . STE 600 LAKEWOOKCO 80228 PS Form 3»00, August 200S See Reverse for Instructions Subject Energy Fuels Resources (USA) Inc January 24,2013 Request for Extension of Time to Submit the Nitrate Corrective Action Plan Phase I Surety Estimate, Stipulated Consent Order Docket No UGW12-04 DRC Approval Dear Ms Tischler: DRC.2013-001156 This IS in response to your e-mail request dated January 24, 2013 (4.05 P.M ) Your e-mail requests an extension of time for Energy Fuels Resources (USA) Inc ("EFR") to submit a revised surety cost estimate. As you are aware, the surety due date is required by Stipulation and Consent Order Docket No UGW12-04 ('SCO") Item Ell. Per Item E 11 , the revised surety cost estimate is reqmred to be submitted by EFR for Director Review and Approval on or before 60 calendar days from the effective date of the SCO. The SCO was signed on December 12,2012, therefore, the revised surety cost estunate is currently due on or before February 9,2013. Your extension request is based on time needed by EFR to conduct; "o/ze to three additional rows of samples, as well as at least six additional samples to assist in bounding the contamination''' at the ammoma sulfate crystal tanks m order to produce a surety cost estimate for the Phase I excavation volume. Per a teleconference between you and DRC staff on January 23,2013, you stated that the ongmal three rows of soil bonngs/samples failed to delmeate the plume boundary (values at the outermost samples exceed 2 times background concentrations for ammoma and/or mtrate). Based on the January 23, 2013 teleconference and your January 24,2013 e-mail request, the extension of time is approved for an additional 60 calendar days from the onginal deadlme specified in the SCO Part E.l 1. The revised surety cost estimate is due on or before Apnl 10, 2013 195 North 1950 West • Salt Lake City, UT Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 'TDD (801) 536-4414 www deq utah gov Pnnted on 100% recycled paper Jo Ann Tischler Page 2 Also, please be aware that per the SCO Part E 6 , all Phase I analytical data is required to be submitted to the Director withm 60 days of EFR receipt of all the Phase I soil samphng data results. If you have questions regarding this letter, please contact Tom Rushing at (801) 536-0080. Sincerely, ' Rusty Lundberg Director RLTRtr F \Energy FuelsVNitrate Corrective Action PlanVPhase I Extension LetterNPhase I Nitrate CAP Extension docx