Loading...
HomeMy WebLinkAboutDRC-2011-007741 - 0901a0688029accaState of Utah GARY R. HERBERT Govemor GREGBELL Lieutenant Govemor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director December 28, 2011 CERTIFIED MAIL (Return Receipt Requested) EC m i-=i i-=i tr o a o a HI i-^ o HI HI a U.S. Postal Servidfe™ CERTIFIED MAIL RECEIPT (Domestic Mail Only; Nb Insurance Coverage Provided) For delivetV information visit pur website at www.usps.com® \, •-- 1™ 1™ 1 C,^ 1 I.J ^ . .. Postage Certified Fee Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) $ Postmark Here Postage Certified Fee Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Postmark Here Postage Certified Fee Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Postmark Here Postage Certified Fee Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Postmark Here Total Postage & Sent To street, Apt. No.; or PO Box No. City, state, Z/P+4 Re: Final Memo / PG David C Frydenlund Denison Mines ( USA) Corp 1050 17th Street, Suite 950 Denver, Co 80265 PS Form 3800. August 2006 See Reverse for Instructions. David C. Frydenlund, Vice President, Regulatory Affairs and Counsel Denison Mines (USA) Corp. 1050 17'^ Street Suite 950 Denver, CO 80265 Subject: Final Memorandum of Agreement between DRC and Denison Mines (USA) Corp. Regarding URS Services for the White Mesa Nitrate Corrective Action Plan Review Dear Mr. Frydenlund: A copy ofthe Final and Executed Memorandum of Agreement between the Utah Division of Radiation Control and Denison Mines (USA) Corp for the Nitrate Corrective Action Plan Review, is enclosed. Ifyou have any questions or concems regarding this transmittal, please contact Phil Goble at (801)536-4044. Sincerely, Rusty Lundberg, Director Utah Division of Radiation Control 195 North 1950 West • Salt Uke City, UT Mailing Address: P.O. Box 144850 • Salt Uke City, UT 84114-4850 Telephone (801) 536^250 • Fax (801) 533^097 • T.D.D. (801) 536^14 www.deq. utah.gov Printed on 100% recycled paper MEMORANDUM OF AGREEMENT BETWEEN UTAH DIVISION OF RADIATION CONTROL AND DENISON MINES (USA) CORP. L General The Utah Division of Radiation Control (DRC) and Denison Mines (USA) Corp. (DUSA) hereby enter into this Memorandum of Agreement (MOA). A. DUSA owns and operates a uranium mill processing and tailings facility near Blanding, Utah named the White Mesa Uranium Mill. B. A Stipulated Consent Agreement, Docket No. UGW09-03-A (SCA) was Duly Executed by DRC and DUSA on September 30, 2011 which addresses corrective actions for groundwater contamination (nitrate and chloride) in groundwater below and in the vicinity of the White Mesa Uranium Mill. C. The SCA requires the submission ofa Corrective Action Plan to DRC by November 30, 2011. D. The SCA Part 11 .A. specifies 3 phases of activity to be included in the Nitrate CAP. These include: 1) Phase I - Source control activities at the Ammonium Sulfate Crystal Tanks 2) Phase II - Active near term remediation ofthe ground water contamination 3) Phase III - Long term remediation plan for the ground water contamination E. The SCA Part 11 .B. outlines minimum performance measures as well as additional measures, other than those in the 3 phases listed in Part 11 .A., required by the Co- Executive Secretary, in order to insure that the CAP meets the intention of all applicable mles and regulations. F. On November 29, 2011, DRC received the required CAP from DUSA (via e-mail). The CAP is dated November 30, 2011 and was prepared for DUSA by Hydro Geo Chem Inc. G. Part 1 l.F.l of the SCA states that DUSA will reimburse DRC for reasonable costs incurred for ''Consulting services rendered by URS for review of the CAP, including any document submitted to the Executive Secretary under Item 11 of this Agreement prior to and in connection with approval of the CAP''' H. In conformance wdth the SCA, this MOA pertains to project tasks associated with the following: 1) URS review ofthe DUSA November 30, 2011 CAP and associated activities. I. This agreement may be extended or modified to include other identified project tasks or phases of activity (future revisions), if expressly agreed to in writing by both parties to this agreement at least 30 days prior to its expiration date. Decembers, 2011, Rev. 0 Pagel II. Duration This MOA will become effective immediately upon signature by authorized representatives ofDUSAandDRC. This MOA will expire on December 31, 2012. The DEQ fee schedule allows for reimbursement of actual costs of special projects. III. Agreement Per this MOA DRC Agrees to: A. Engage the services of URS Corporation to accomplish review of the November 30, 2011 CAP under the current contract (State Contract No. 116259). URS will follow the agreed upon tasks and total costs in Attachment A of this Agreement to the degree possible. B. Provide DUSA with: a. A URS technical memorandum detailing the URS review summary and specific comments regarding review ofthe CAP (which also incorporate any additional DRC review comments related to the CAP), b. Any URS invoices for services rendered on the project, including hour's expended, hourly rates and job classification of URS staff involved, and a breakdown of any other expenses incurred during project completion. C. Bill DUSA for URS work efforts in completion of the project described above, up to $27,336, These costs are based on the work elements and schedule assumptions found iri Attachmerit A of this Agreement (Note that the cost estimate projects that the initial November 30, 2011 CAP be reviewed, as well as 2 additional revisions, the costs for review of revisions will only apply if needed). Additionally, the cost estimate provides for three telephone conferences between DRC and URS; and three telephone conferences or face-to-face meetings amongst URS, the DRC and DUSA. This agreement may be amended, for any reason, after consent by both parties. DUSA Agrees to: Provide DRC with timely payment of any invoice(s) for URS Corporation consulting services related to completion of the activities referenced in this Agreement. SIGNATURES: Rusty Lund'l2prg, Director Q Amnqrizeti Representative Division of Radiation Control Denison Mines (USA) Corp. Date Date December 8, 2011, Rev. 0 Page 2 Attachment A - Cost Estimates for URS by task and staff time NITRATE PLUME CORRECTIVE ACTION PLAN REVIEW; BASIS FOR COST ESTIMATE Person Hours Baird 16 Hydro 44 Admin-01 12 Bitter 32 Cox 46 Brown-Gustin 62 Greenwood 4 Admln-02 9 Total Hours 225 Labor Cost $27,275 Other Direct Costs $61 Total Cost $27,336 Activity Hours £ss! Review draft Corrective Action Plan 122 $14,291 Review revised draft Corrective Action Plan 64 $7,841 Review final Corrective Action Plan 39 $5,205 Totals 225 $27,336 December 8, 2011, Rev. 0 Page 3 MEMORANDUM OF AGREEMENT BETWEEN UTAH DIVISION OF RADIATION CONTROL AND DENISON MINES (USA) CORP. I. General The Utah Division of Radiation Control (DRC) and Denison Mines (USA) Corp. (DUSA) hereby enter into this Memorandum of Agreement (MOA). A. DUSA ovms and operates a uranium mill processing and tailings facility near Blanding, Utah named the White Mesa Uranium Mill. B. A Stipulated Consent Agreement, Docket No. UGW09-03-A (SCA) was Duly Executed by DRC and DUSA on September 30,2011 which addresses corrective actions for groundwater contamination (nitrate and chloride) in groundwater below and in the vicinity of the White Mesa Uranium Mill. C. The SCA requires the submission of a Corrective Action Plan to DRC by November 30, 2011. D. The SCA Part 1 I.A. specifies 3 phases of activity to be included in the Nitrate CAP. These include: 1) Phase I - Source control activities at the Ammonium Sulfate Crystal Tanks 2) Phase II - Active near term remediation ofthe ground water contamination 3) Phase III - Long term remediation plan for the ground water contamination E. The SCA Part 11 .B. outlines minimum performance measures as well as additional measures, other than those in the 3 phases listed in Part 11.A., required by the Co- Executive Secretary, in order to insure that the CAP meets the intention of all applicable mles and regulations. F. On November 29, 2011, DRC received the required CAP fi:om DUSA (via e-mail). The CAP is dated November 30, 20IT and was prepared for DUSA by Hydro Geo Chem Inc. G. Part 11 .F.I ofthe SCA states that DUSA will reimburse DRC for reasonable costs incurred for "Consulting services rendered by URSfor review of the CAP, including any document submitted to the Executive Secretary under Item 11 of this Agreement prior to and in connection with approval ofthe CAP." H. In conformance with the SCA, this MOA pertains to project tasks associated with the following: 1) URS review ofthe DUSA November 30,2011 CAP and associated activities. I. This agreement may be extended or modified to include other identified project tasks or phases of activity (future revisions), if expressly agreed to in writing by both parties to this agreement at least 30 days prior to its expiration date. Decembers, 2011, Rev. 0 Pagel Attachment A - Cost Estimates for URS by task and staff time NITRATE PLUME CORRECTIVE ACTION PLAN REVIEW; BASIS FOR COST ESTIMATE Person Hours Baird 16 Hydro 44 Admin-01 12 Bitter 32 Cox 46 Brown-Gustin 62 Greenwood 4 Admin-02 9 Total Hours 225 Labor Cost $27,275 Other Direct Costs $61 Total Cost $27,336 Activity HOUrS £i2St Review draft Corrective Action Plan 122 $14,291 Review revised draft Corrective Action Plan 64 $7,841 Review final Corrective Action Plan 39 $5,205 Totals 225 $27,336 December 8, 2011, Rev. 0 Page 3