HomeMy WebLinkAboutDRC-2018-000141 - 0901a0688079b873IxspBcrrox RnpoRr Inspection Module: RADMOD-ALARA Inspection Location: Energy Fuels - White Mesa Uranium Mill, Blanding Utah. Inspection ltems: 2016 Annual ALARA Report, Daily and Weekly Inspections and Monthly Reports Inspection Dates: November I and2,2017 Inspector(s): Ryan Johnson, Utah Division Waste Management and Radiation Control (DWMRC) Personnel Contacted: David Turk, Energy Fuels Resources Radiation Safety Officer (RSO) Governing Documents:o UAC R3l3-15o Radioactive Materials License (RML) UT1900479, License Condition I1.6o Nuclear Regulatory Commission (NRC) Regulatory Guide 8.31 Openins Meetins Energy Fuels Resources: David Turk (RSO) Utah DWMRC: Ryan Johnson (Health Physics Inspector) Phil Goble (U-MilVRAM Supervisor) During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed during the inspection. The yellowcake precipitation and dryer and the solvent extraction portions of Mill were operating during this inspection processing yellowcake but the rest of the Mill was not operating and maintenance activities were being performed. The Mill staff reminded the inspectors of the safety requirements for the Mill. 1 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMOMUranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\tlP lnspection modulesU0l T\[nspection Reports\lnspection Letter RADMOD-ALARA I I -0 l -l 7.docx DRC Meters Used Model SerialNumber Calibration Due Date Dose Rate Ludlum l9 101673 7^2il8 Inspection Summarv Item 1. Document Review- License Condition I 1.6 of the Mill's RML requires the Mill to perform an annual ALARA audit of the radiation safety program as per NRC Regulatory Guide 8.31. The 2016 ALARA Audit took place in April of 2017. ThJinspector reviewed the r"po.t of that audit. The ALARA report is not required to be submitted to the DWMRC, therefore, it is reviewed by DWMRC Staff at theMillwhen requested. Observations: The DWMRC inspector observed: ALARA Reporto The Mill followed the outline in NRC Regulatory Guide 8.31, Section2.3.3 Radiation protection and ALARA Audit for the ALARA Report; ando The ALARA report contained information on each subject of the outline;r The tables and graphs gave general information on the radiological conditions observed at the Mill. Daily and Weekly lnspections and Monthly Reportso Several different people do daily inspection specific to their job function;r The daily inspection forms are clear, concise and legible;o The lnspector spot checked the daily inspection forms. Of the inspection forms reviewed by the Inspector, no non-compliance issues were identified;o The weekly inspections are done by the RSO (or designee) and someone from operations;o The weekly inspection forms are clear, concise and legible;o The lnspector spot checked the weekly inspection forms. Of the inspection forms reviewed by the Inspector, no non-compliance issues were identified; ando The Monthly reports adequately summarize the information from the daily and weekly inspections. Deficiencies: None Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour included the ore pad, the mill, the tailing cells, solvent the extraction building and the alternate feed circuit. Observations: The DWMRC inspector also observed:o Yellowcake being packaged into 55-gallon drums;o Alternate feed being stockpiled on the ore pad;e OSL badges were appropriately being used by all observed employees at the Mill;o OSL badges are properly being stored; ande Mill personnel were wearing appropriate ppE. Deficiencies: None 2 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMOl.{\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modulesg0l T\lnspectionReports\lnspection Letter RADMOD-ALARA I I -0 I -l 7.docx Radio ca read observed durins Mill tour Location Dose Rate (pR/hr) Yellowcake Storaee Yard 180 Ore Pad 80- r 30 Milt 120-260 Solvent Extraction Buildine 50 Alternate Feed Storage Pad 600 Alternate Feed Circuit 50 Item 3. Vegetation Sampling: During the time of the inspection, the Mill was conducting its vegetation sampling for the Fall sampling event. Observations: The DWMRC inspector observed: o Collect vegetation from 3 different areas on the Mill property; o Collected more than 3,000 grams of ve'getation material from each area;o The sampled material was placed in large plastic bag; and o Each bag was marked with location, date and time of sampling. Deficiencies: None Closeout Meetine Energy Fuels: Logan Shumway (Mill Manager) David Turk (RSO) Utah DWMRC: Ryan Johnson (Health Physics Inspector) Phil Goble (U-MiIVRAM Supervisor) Ganin Palmer (Environmental Tech.) Tanner Halliday (Environmental Tech.) Findines None Recommendationso None Recommendation for Next Inspection o Before the next audit have a conference call between DWMRC and EFRI to discuss what level of detail in the information should be annual ALARA report. Prepared By: Ryan Johnson ,r;/ -AZ -/e1{ Reviewed By: (Print Name) PhilGoble (Print Name) 3 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modules\2017\lnspeotion Reports\lnspection Letter RADMOD-ALARA | | -01-l 7.docx (Signature)(Date)