Loading...
HomeMy WebLinkAboutDDW-2024-007362 April 16, 2024 Max Covey North Village SSD PO Box 519 Heber City, Utah 84032 Dear Max Covey: Subject: Public Drinking Water Requirements for North Village SSD , UTAH26096 According to the Division of Drinking Water ’s records, North Village SSD is a Community water system that now serves a population of about 1,280 people. This population change results in the following changes to your systems sampling requirements as follows: Disinfection Byproducts (DBPs) Sampling The water system’s Disinfection Byproducts (DBP) sampling requirement has changed because the system has qualified for reduced monitoring based on previous sample results. The system is now required to collect one (1) DBP sample every year. Each sample must be a dual sample set of total trihalomethanes (TTHMs) and haloacetic acids (HAA5). The next DBP samples must be collected during the July 1 - September 30, 2024, monitoring period. The system must submit an updated DBP sample site plan to the Division within 30 days of this letter. A sample site plan template with instructions has been enclosed. For any questions regarding the DBP rule contact Luke Treutel at (385) 258-6084 or ltreutel@utah.gov. A current monitoring schedule for your system has been enclosed. If this letter is in error please contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts in maintaining a safe drinking water system. Sincerely, 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Max Covey Page 2 of 2 Mark Berger Monitoring and Standards Section Manager Enclosure: Monitoring Schedule Disinfection Byproduct (DBP) Sample Site Plan Template cc: Max Covey, mcovey@jssd.us Dwight Hill, Wasatch County Health Department Luke Treutel Contacts Type: Administrative Contact Name: MAX L COVEY Office: 435-654-9233 Emergency: Email: mcovey@jssd.us Site Information Legal Contact: NORTH VILLAGE SSD Address: PO BOX 519 , HEBER CITY, UT 84032 Phone: County: WASATCH COUNTY System Type: Community Certification Required: D1 Total Population: 890 Site Updates Last Inventory Update: 01/29/2024 Last Surveyor Update: 08/26/2021 Surveyor: JULIE JENNIFER COBLEIGH Operating Period: 1/1 - 12/31 Last IPS Update: 03/26/2024 14:10:00 Political Districts Representative: 54 Senate: 26 Water Usage Information per ERC Total Ips Points: 15 Public Water System Water Monitoring ReportDEQ | Drinking Water North Village Ssd PWS ID: UTAH26096 Rating: Approved 11/22/2005 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 2 Routine Monthly 04/01/2013 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 2 Routine Quarterly UTAH26096 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MD001 MID POINT DISTRIBUTION SYS 02/05/2024 04/01/2024-06/30/2024 MR001 MAX RETENTION 02/05/2024 04/01/2024-06/30/2024 Sample during the following months: November, February, May, August OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 10 Routine 3 Years 08/2023 06/01/2026-09/30/2026 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH26096 DISTRIBUTION SYSTEM 12 Routine Monthly -- MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Corrective Action Agreement CAA COLLECT AND RECORD WATER USE DATA MIN 01/07/2020 09/01/2020 Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2024 07/01/2024 CCR SCHEDULES Submit CCR Certification Letter 01/01/2024 10/01/2024 Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 09/10/2018 10/31/2018 Revised 7/30/2021 Utah Div ision of Drinking Water Stage 2 Disinfectant Byproduct (DBP) Sampling Plan In accordance with State of Utah Rule R309-210-10(3): Any Community (COM) or Non-Transient Non-Community (NTNC) drinking water system that regularly applies a chemical disinfectant must develop and implement a DBP monitoring plan. The system must maintain current version of the plan on file and submit a copy of 1) the monitoring plan, 2) a schematic of the distribution system, and 3) the justification for site selection (IDSE water, modeling analysis, etc.) to the Division of Drinking Water. BASIC WATER SYSTEM INFO Water System Name: Water System #: Residual Disinfectant Type: ☐ Chlorine ☐ Chlorine Dioxide ☐ Ozone # of Service Connections: Population (# of customers): Sampling Schedule ( # of sampling locations): Per Quarter Per Year SITE SELECTION INFO Associated Rules: R309-210-9(2)(b)(i)(Q): A dual sample set (i.e., a TTHM and an HAA5 sample) must be taken at each monitoring location during each monitoring period. Associated Info: Disinfection By Product Sampling schedules are based on population and source water type. DBPs may be required quarterly, annually, or every three years. For a complete list of possible schedules please see associated DBP handout. •One dual sample set must be taken at the highest TTHM (trihalomethanes) sampling site, at a location that represents maximum residence time; typically in the furthest reaches of your distribution system, or where water is oldest. This location is denoted as MR001. •One dual sample set must be taken at the highest HAA5 (haloacetic acids) sampling site, at a location that represents the average residence time; typically located mid distribution system This location is denoted as MD001. R309-210-10(3)(ii): •Water system must identify which locations will be used for compliance monitoring by alternating selection of locations representing high TTHM and high HAA5 levels until the required number of compliance monitoring locations have been identified. Water system sampling schedules with sampling locations and details are available at any time at WaterLink.utah.gov SAMPLES Sample Code Specific sampling location ADDRESS Site Characteristics / Site Selection Justification (check those that apply) MR001 MR002 MR003 MR004 ☐Highest TTHM/HAA5 in prior data ☐Endpoint of distribution system and/or maximum water age ☐Other: MD001 MD002 MD003 MD004 ☐Highest TTHM/HAA5 in prior data ☐Midpoint of a large distribution system ☐Endpoint of distribution system and/or maximum water age ☐Other: Annual samples must be collected within a specific time frame in accordance with State of Utah Rules R309-210-10(2)(a)(ii)(N): All systems must monitor during months of highest DBP concentrations. R309-210-9(2)(b)(i)(R): The peak historical month is the month with the highest TTHM or HAA5 levels or the warmest water temperature. Source Water Types: ☐Ground water ☐Ground water purchasing from wholesale Water System #: UTAH ☐Ground water Under Direct Influence of surface water ☐Surface water ☐Surface water purchasing from wholesale Water System #: UTAH CERTIFICATION I certify that I am the person authorized to fill out this application and the information I have provided is accurate and complete to the best of my knowledge at the time it was completed. X X Printed Name Signature Date: Title: ☐ Administrative Contact ☐ Operator SUBMITTAL Mail the completed form to: Or Email: Division of Drinking Water Attn: DBP Rule Manager 195 N 1950 W PO BOX 144830 Salt lake City, UT 84114 DDWREPORTS@UTAH.GOV This application and related environmental information are available online at DrinkingWater.utah.gov For more information, or to answer questions, please contact the DBP Rule Manager, Luke Treutel at (385) 258-6084 ltreutel@utah.gov Revised 7/30/2021