Loading...
HomeMy WebLinkAboutDERR-2024-004292VCP/Brownfields Section - Site Visit Report SITE NAME: Silver Pointe Voluntary Cleanup Program (VCP) site SITE LOCATION: Leeds, Utah DATE OF SITE VISIT: 13 FEB 2024 PURPOSE OF SITE VISIT: Division of Environmental Response and Remediation (DERR) oversight of scheduled repairs and activities pursuant to the SEP 2023 annual inspection report. FIELD OBSERVATIONS: The DERR met the Silver Reef Investment Holdings, Inc. (SRIH) Site Engineer (Rich White) near the Large Headframe at the Silver Pointe site on 13 FEB at ~10:45 am. Contaminated soil from the future building lot (15) north of the Headframe, was being loaded into a dump truck bound for the Washington County Landfill. The DERR and SRIH then proceeded to the PCA6 area of the Silver Pointe site, an area within lots 31 and 32. The area had additional clean soil added in areas of erosion, and 2 inches of gravel added to reduce the potential for erosion. We then proceeded to the PCA8 area on the east end of lot 4, and at the eastern property boundary. Both areas appeared to have the specified additional clean cover to replace what was eroded and the additional 2 inches of gravel to inhibit future erosion. View to northwest at PCA8 As the work proceeded during the rest of the day, SRIH and the DERR surveyed with field instruments the excavated area at lot 15, collected aliquots for the confirmation sample and DEQ split, and oversaw the additional clean soil placed at PCA12, PCA5, and the mine adit opening on lot 2. View to the southeast. PCA12 with additional soil and gravel placed. View to the south. Mine adit opening on lot 2 The DERR walked the area of additional soil and gravel at the entrance to the mine found on lot 2, and the extent of the cover was consistent with the recommendations in the Annual Inspection Report. The DERR left the site at ~6:20 pm. SPLIT SAMPLES COLLECTED: SILV-1-DEQ IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? Yes