HomeMy WebLinkAboutDAQ-2024-0048261 DAQC-CI100420001-23 Site ID 10042 (B1) MEMORANDUM TO: FILE – STAKER PARSON MATERIALS AND CONSTRUCTION – McGuire Pit THROUGH: Chad Gilgen, Minor Source Compliance Section Manager FROM: Connor Kijowski, Environmental Scientist DATE: January 22, 2024 SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Box Elder County INSPECTION DATE: June 2, 2023 SOURCE LOCATION: 8211 South U.S. Highway 89 Willard, UT 84340 SOURCE CONTACTS: Boe Couch, Site Supervisor 385-239-8402 Christian Boudreau, Environmental Specialist 801-871-6704; christian.boudreau@stakerparson.com OPERATING STATUS: Operating normally at the time of inspection. PROCESS DESCRIPTION: McGuire aggregate pit. Bank material is pushed for processing in the main circuit. A power screen and jaw crusher operate above the main plant for specialty processing. The area formerly known as the "north pit" is no longer operating. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN100420011-21, dated May 26, 2021 NSPS (Part 60) -OOO : Standards of Performance for Nonmetallic Mineral Processing Plants SOURCE EVALUATION: Name of Permittee: Permitted Location: Staker Parson Materials and Construction - McGuire Pit 89 West 13490 South Suite 100 8211 South U.S. Highway 89 Draper, UT 84020 Willard, UT 84340 SIC Code: 1442: (Construction Sand & Gravel) ) 1 2 Section I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150] I.8 The owner/operator shall submit documentation of the status of construction or modification to the Director within 18 months from the date of this AO. This AO may become invalid if construction is not commenced within 18 months from the date of this AO or if construction is discontinued for 18 months or more. To ensure proper credit when notifying the Director, send the documentation to the Director, attn.: NSR Section. [R307-401-18] Status: Out of Compliance. The 8x20 screen listed in II.A.8 was modified without review and approval. The source submitted a Replacement-in-Kind notification to address the issue after the inspection and an updated AO was issued (DAQE-AN100420012-23). The remaining conditions of the general provisions in Section I appear to be in compliance. The 2020 Emission Inventory was submitted by the required date. Section II: SPECIAL PROVISIONS II.A The approved installations shall consist of the following equipment: II.A.1 McGuire Pit II.A.2 One (1) Jaw Crusher Rated Capacity: 500 tph Manufacturer: Telsmith Manufacture Date 1997 II.A.3 One (1) 7 x 20 Screen Rated Capacity: 700 tph Manufacturer: El Jay Manufacture Date 1998 3 II.A.4 One (1) Jaw Crusher Rated Capacity: 500 tph Manufacturer: Cedarapids Manufacture Date 2005 II.A.5 One (1) Cone Crusher Rated Capacity: 500 tph Manufacturer: Terex Manufacture Date 2019 II.A.6 One (1) Cone Crusher Rated Capacity: 500 tph Manufacturer: MVP 450 Manufacture Date 1993 II.A.7 Two (2) 8 x 20 Screens Rated Capacity: 600 tph Manufacturer: Terex Manufacture Date 2019 II.A.8 One (1) 8 x 20 Screen Rated Capacity: 600 tph Manufacturer: El Jay Manufacture Date 1992 II.A.9 One (1) 6 x 20 Screen Rated Capacity: 600 tph Manufacturer: El Jay Manufacture Date 1999 II.A.10 One (1) Power Screen Rated Capacity: 250 tph Manufacture Date 1992 Fuel: Diesel II.A.11 Two (2) Diesel Storage Tanks Rated Capacity: 10,000 Gallons each II.A.12 Associated Conveyors & Other Support Equipment Status: Out of Compliance. The 8x20 power screen listed in II.A.8 was replaced with an identical screen, manufactured in 2022, without a Replacement-In-Kind notification. The source provided additional details on the screen after the inspection and an updated AO was issued. II.A.2: The jaw crusher is installed but currently inactive. II.A.3: The 7x20 screen is installed but currently inactive. II.A.8: The permitted screen was replaced with an Astec 8x20 screen, manufactured in 2022. II.A.10: The power screen has been decommissioned. 4 II.B Requirements and Limitations II.B.1 The McGuire Pit shall be subject to the following: II.B.1.a The owner/operator shall not produce more than 2,500,000 tons of aggregate materials per rolling 12-month period. [R307-401-8] II.B.1.a.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the 20th day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. The records of production shall be kept on a daily basis. Production shall be determined by sales records of final product shipped. [R307-401-8] Status: In Compliance. The rolling 12-month production totals from June 2022 - May 2023, are calculated according to this condition and were 1,154,378 tons of aggregate material. II.B.1.b The owner/operator shall not operate the equipment listed in II.A.5 through II.A.9 more than 20 hours per day during any hour of the day. [R307-401-8] II.B.1.b.1 Records of hours of operation shall be kept for all periods when the plant is in operation. The records of operating hours shall be kept on a daily basis. Hours of operation shall be determined by supervisor monitoring and maintaining of an operations log. [R307-401-8] Status: In Compliance. The source is only operating one 12-hour shift a day. Operation logs viewed during the inspection verified this schedule. II.B.1.c The owner/operator shall not allow visible emissions from the following emission points to exceed the following values: A. All crushers - 12% opacity B. All screens - 7% opacity C. All conveyor transfer points - 7% opacity D. All diesel engines - 20% opacity E. All conveyor drop points - 20% opacity F. All storage piles - 10% opacity G. All other points - 20% opacity. [R307-312-4, R307-401-8] II.B.1.c.1 Opacity observations of emissions from stationary sources shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-201-3] Status: In Compliance. The cone crusher was observed at 6.8% over a six-minute average according to 40 CFR 60, Appendix A, Method 9. Refer to the VEO form in the attachments for more details. II.B.1.d The owner/operator shall install water sprays on all crushers, all screens, all conveyor transfer points, and all conveyor drop points to control emissions. Sprays shall operate as required to ensure the opacity limits in this AO are not exceeded. [R307-401-8] Status: In Compliance. Water sprays are installed on all crushers, screens, and conveyor transfer points and operate as needed to ensure opacity limits are not exceeded. II.B.1.e The owner/operator shall perform monthly periodic inspections to check that water is flowing to discharge spray nozzles associated with each crusher, screen, and conveyor. If the owner/operator finds that water is not flowing properly during an inspection of the water spray nozzles, the owner/operator shall initiate corrective action within 24 hours and complete corrective action as expediently as practical. [40 CFR 60 Subpart OOO, R307-401-8] 5 II.B.1.e.1 Records of the water sprays inspections shall be kept and maintained in a logbook for all periods when the plant is in operation. The records shall include the following items: A. Date the inspections were made B. Any corrective actions taken C. Control mechanism used if sprays are not operating. [40 CFR 60 Subpart OOO, R307-401-8] Status: In Compliance. Water spray inspections are performed daily and are maintained in a logbook which was available for review during the inspection. II.B.1.f The owner/operator shall conduct an initial performance test for all new crushers, screens, and conveyor transfer points subject to NSPS Subpart OOO. Performance tests shall meet the limitations specified in Table 3 to Subpart OOO. [40 CFR 60 Subpart OOO] II.B.1.f.1 Initial performance tests for fugitive emissions limits shall be conducted according to 40 CFR 60.675(c). The owner or operator may use methods and procedures specified in 40 CFR 60.675(e) as alternatives to the reference methods and procedures specified in 40 CFR 60.675(c). [40 CFR 60 Subpart OOO] II.B.1.f.2 The owner/operator shall keep and maintain records of the initial performance test for each crusher, screen, and conveyor for the life of the equipment. The record of the initial performance test must be made available to the Director or the Director's representative upon request. [40 CFR 60 Subpart OOO] Status: In Compliance. Initial performance tests were performed August 2022, and were viewed during the inspection. II.B.2 All Haul Roads and Fugitive Dust Sources shall be subject to the following: II.B.2.a The owner/operator shall not allow visible emissions from haul roads and fugitive dust sources to exceed 20 percent opacity on site and 10 percent at the property boundary. [R307-309-5, R307-401-8] II.B.2.a.1 Visible emission determinations for fugitive dust from haul roads and operational areas shall use procedures similar to Method 9. The normal requirement for observations to be made at 15- second intervals over a six-minute period, however, shall not apply. Visible emissions shall be measured at the densest point of the plume but at a point not less than one-half vehicle length behind the vehicle and not less than one-half the height of the vehicle. [R307-309-5, R307-401-8] Status: In Compliance. Visible emissions from haul road traffic was minimal. The site was watered upon arrival and a truck was actively watering during the inspection. II.B.2.b All unpaved roads and other unpaved operational areas that are used by mobile equipment shall be water sprayed and/or chemically treated to control fugitive dust. The application of water or chemical treatment shall be used. Treatment shall be of sufficient frequency and quantity to maintain the surface material in a damp/moist condition unless it is below freezing. If chemical treatment is to be used, the plan must be approved by the Director. [R307-401-8] 6 II.B.2.b.1 Records of water and/or chemical treatment shall be kept for all periods when the plant is in operation. The records shall include the following items: A. Date of treatment B. Number of treatments made, dilution ratio, and quantity C. Rainfall received, if any, and approximate amount D. Time of day treatments were made E. Records of temperature if the temperature is below freezing. [R307-401-8] Status: In Compliance. Regular watering is conducted by a 4,000-gallon water truck which rotates between this site and the Hot Springs pit. Watering records are kept in the water truck and were viewed during the inspection. Magnesium chloride is placed twice a year. II.B.2.c The total haul roads shall not exceed 0.4 miles in length. [R307-401-8] Status: In Compliance. The haul road length has not changed since the previous inspection and does not exceed 0.4 miles in length. II.B.2.d The owner/operator shall use water application or other control options contained in R307-309 to minimize emissions from fugitive dust emissions from storage piles. Controls shall be applied to ensure the opacity limits in this AO are not exceeded. [R307-309-5, R307-401-8] Status: In Compliance. Storage piles are watered as needed with a side cannon on the water truck. II.B.2.e The owner/operator shall comply with a FDCP consistent with R307-309-6, Fugitive Dust Control Plan. The FDCP shall address the control of all fugitive dust sources at the plant. [R307-309-6, R307-401-8] Status: In Compliance. The source submitted a FDCP dated June 12, 2006. II.B.3 Diesel fuel the power screen engine consumes shall be subject to the following II.B.3.a The owner/operator shall only use diesel fuel (e.g. fuel oil #1, #2, or diesel fuel oil additives) as fuel in the power screen engine. [R307-401-8] Status: Not Applicable. The power screen is longer in service. II.B.3.b The owner/operator shall only combust diesel fuel that meets the definition of ultra-low sulfur diesel (ULSD), which has a sulfur content of 15 ppm or less. [R307-401-8] II.B.3.b.1 To demonstrate compliance with the ULSD fuel requirement, the owner/operator shall maintain records of diesel fuel purchase invoices or obtain certification of sulfur content from the diesel fuel supplier. The diesel fuel purchase invoices shall indicate that the diesel fuel meets the ULSD requirements. [R307-401-8] Status: In Compliance. The source utilizes ultra-low sulfur fuel. This was determined from a fuel purchase invoice provided by the supplier, Pilot Thomas Logistics. Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. 7 NSPS (Part 60) -OOO: Standards of Performance for Nonmetallic Mineral Processing Plants Status: In Compliance. Refer to Conditions II.B.1.c through II.B.1.f for more details. 60.670(d)(1): The 8x20 screen (II.A.8) was replaced with a screen of equal size and capacity with the same function as the previous piece of equipment with no increase in the amount of emissions. 60.676(a)(2): The screen surface area of the existing screen and replacement screen were submitted and appear to be the same size and capacity. Refer to the manufacturer dimensions in the attachments. AREA SOURCE RULES EVALUATION: The following Area Source Rules were evaluated during this inspection: Emission Standards: Sulfur Content of Fuels [R307-203] Status: In Compliance. Refer to Condition II.B.3.b.1 for more details. Stationary Sources [R307-210] Status: In Compliance. This rule is satisfied by compliance with 40 CFR Part 60 Subpart OOO. Refer to the Federal Requirements Section for more details. Nonattainment and Maintenance Areas for PM10:Emissions and Fugitive Emissions and Fugitive Dust [R307-309] Status: In Compliance. Refer to Section II.B.2 for more details. Aggregate Processing Operations for PM2.5 Nonattainment Areas [R307-312] Status: In Compliance. R307-312-4 limits visible emissions from crushers to 12%, screens and conveyor transfer points to 7% opacity using Method 9 procedures. These limitations were met during this inspection. EMISSION INVENTORY: Listed before are the 2020Actual Emissions Inventory provided from Staker Parson Materials and Construction - McGuire Pit. A comparison of the estimated total potential emissions (PTE) on AO: DAQE-AN100420011-21, dated May 26, 2021, and the 2020 Emission Inventory are as follows: PTE are supplied for supplemental purposes only. Criteria Pollutant PTE tons/yr Actuals tons/yr CO2 Equivalent 79.00 N/A Carbon Monoxide 0.46 0.00 Nitrogen Oxides 2.11 0.00 Particulate Matter - PM10 17.36 11.97 Particulate Matter - PM2.5 3.58 1.66 Sulfur Dioxide 0.14 0.00 Volatile Organic Compounds 0.17 0.00 Hazardous Air Pollutant PTE lbs/yr Actuals lbs/yr 8 PREVIOUS ENFORCEMENT ACTIONS: No enforcement actions within the past five years. COMPLIANCE STATUS & RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN100420011-21, dated May 26, 2021: Out of Compliance. A Replacement-In- Kind notification was not provided prior to replacing the screen listed in II.A.8. The source provided documentation after the inspection verifying that the screen size, capacity, and emission potential are the same as the replaced equipment. A Compliance Advisory (DAQC-1088-23) and Warning Letter (DAQC-1363-23) were submitted to address the issue and an updated AO was issued (DAQE-AN100420012-23) to include the new equipment. The remaining conditions appear to be in compliance. HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: Inspect at the regular interval. NSR RECOMMENDATIONS: None at this time. ATTACHMENTS: VEO Form, Production Records, Maintenance Logs, Email Correspondence, Screen Manufacturer Dimensions 8/4/23, 10:54 AM State of Utah Mail - Air Quality Inspection Request for Records - Staker Parson McGuire Pit https://mail.google.com/mail/u/0/?ik=0e8810739b&view=pt&search=all&permthid=thread-a:r1058408170161243493&simpl=msg-a:r-55911044805916…1/5 Connor Kijowski <ckijowski@utah.gov> Air Quality Inspection Request for Records - Staker Parson McGuire Pit 10 messages Connor Kijowski <ckijowski@utah.gov>Fri, Jun 2, 2023 at 4:46 PM To: "bryan.jorgensen@stakerparson.com" <bryan.jorgensen@stakerparson.com> Good Afternoon Bryan, I recently performed a routine air quality inspection at the McGuire Pit in Willard. I met with Kelly Brunker who showed me the permitted equipment and provided any records available. There are still some records required to complete the inspection. From the approval order (attached for your reference): Condition II.B.1.a: Rolling 12-month totals (May 2022 - April 2023) for tons of aggregate produced Condition II.B.1.b: Daily operating hours for the equipment listed in II.A.5 through II.A.9 Condition II.B.1.e: Water spray inspection records for the crushers, screens and conveyors Condition II.B.2.b.1: Unpaved road/operational area chemical treatment record (if applicable) Condition II.B.3.b: Diesel fuel sulfur content verification 40 CFR 60 Subpart OOO 60.676(a)(2): Kelly mentioned the 8x20 El Jay screen (II.A.8) was recently replaced with a 8x20 Astec screen manufactured in 2022 with the same capacity rating. Can you please send me confirmation that these two pieces of equipment share the same dimensions and capacity rating according to this condition? The remaining records and conditions looked good. A visible emissions observation was performed for the cone crusher (II.A.5) and yielded a 6-minute average of 6.8%. Please provide these records by June 13, 2023. If you have any questions or concerns, feel free to reach out. Thank you, -- Connor Kijowski Environmental Scientist | Minor Source Compliance M: (385)-245-6720 airquality.utah.gov DAQE-AN100420011-21.pdf 521K Connor Kijowski <ckijowski@utah.gov>Tue, Jun 13, 2023 at 2:29 PM To: "bryan.jorgensen@stakerparson.com" <bryan.jorgensen@stakerparson.com> Good Afternoon Bryan, I wanted to check in and make sure you received my previous email, dated June 2nd. Please provide the records listed above as soon as possible. 8/4/23, 10:54 AM State of Utah Mail - Air Quality Inspection Request for Records - Staker Parson McGuire Pit https://mail.google.com/mail/u/0/?ik=0e8810739b&view=pt&search=all&permthid=thread-a:r1058408170161243493&simpl=msg-a:r-55911044805916…2/5 Thanks, Connor Kijowski [Quoted text hidden] Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com>Tue, Jun 13, 2023 at 2:32 PM To: Connor Kijowski <ckijowski@utah.gov> Hi Connor, I did receive that. I will try to have all that to you tonight or tomorrow morning. Bryan Get Outlook for iOS From: Connor Kijowski <ckijowski@utah.gov> Sent: Tuesday, June 13, 2023 2:29:10 PM To: Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com> Subject: [EXT] Re: Air Quality Inspecon Request for Records - Staker Parson McGuire Pit CAUTION: This email originated from outside of the organizaon. Do not click links or open aachments unless you are expecng this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish buon. [Quoted text hidden] ATTENTION: Ce courriel vient de l'exterieur de l'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pièces jointes, à moins que vous ne connaissiez l'expéditeur du courriel et savez que le contenu est sécuritaire. Si vous pensez qu’il s’agit d’un courriel d’hameçonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tentave d’hameçonnage. Connor Kijowski <ckijowski@utah.gov>Tue, Jun 13, 2023 at 2:33 PM To: "Jorgensen, Bryan (Staker Parson)" <Bryan.Jorgensen@stakerparson.com> Sounds good. Thanks for the quick response. Best, Connor [Quoted text hidden] Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com>Wed, Jun 14, 2023 at 4:07 PM To: Connor Kijowski <ckijowski@utah.gov> Cc: "Couch, Boe (Staker Parson)" <boe.couch@stakerparson.com> Hey Connor, I have attached a week worth of the daily inspections. At the bottom of these inspections is the dust control. This shows ok or not ok and then if there were any problems or corrections that would go in the notes section. With that, the water spray hours also equates to the time that the equipment from Condition II.B.1.b was ran. We are currently running one shift so we are well under our operating hour limits. There is also the rolling 12 month production numbers and the fuel verification record. If you need anything else or have any questions, please feel free to reach out to me. Thanks! 8/4/23, 10:54 AM State of Utah Mail - Air Quality Inspection Request for Records - Staker Parson McGuire Pit https://mail.google.com/mail/u/0/?ik=0e8810739b&view=pt&search=all&permthid=thread-a:r1058408170161243493&simpl=msg-a:r-55911044805916…3/5 Bryan Jorgensen Environmental Specialist Staker Parson Materials & Construction, HK Contractors, Evans Construction A CRH COMPANY 2350 South 1900 West Ogden, UT 84401 O +1 (801) 409-2472 C +1 (801) 648-5483 E bryan.jorgensen@stakerparson.com [Quoted text hidden] 3 attachments Rolling 12 Production 04_22 - 05_23.png 45K McGuire Daly Inspections.pdf 9865K Fuel Record.pdf 305K Connor Kijowski <ckijowski@utah.gov>Wed, Jun 14, 2023 at 7:26 PM To: "Jorgensen, Bryan (Staker Parson)" <Bryan.Jorgensen@stakerparson.com> Cc: "Couch, Boe (Staker Parson)" <boe.couch@stakerparson.com> Bryan, Thank you for these records. There is still one item required to complete the inspection. 40 CFR 60 Subpart OOO 60.676(a)(2): Kelly mentioned the 8x20 El Jay screen (II.A.8) was recently replaced with a 8x20 Astec screen manufactured in 2022 with the same capacity rating. Can you please send me confirmation that these two pieces of equipment share the same dimensions and capacity rating according to this condition? Thanks, Connor [Quoted text hidden] Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com>Wed, Jun 14, 2023 at 7:33 PM To: Connor Kijowski <ckijowski@utah.gov> I apologize. I forgot to attach these. These are the manufactures dimensions of the screen decks. Let me know if this works. 8/4/23, 10:54 AM State of Utah Mail - Air Quality Inspection Request for Records - Staker Parson McGuire Pit https://mail.google.com/mail/u/0/?ik=0e8810739b&view=pt&search=all&permthid=thread-a:r1058408170161243493&simpl=msg-a:r-55911044805916…4/5 And you are working way past state closing hours!! Thanks, [Quoted text hidden] 3 attachments 823400.PDF 295K 821620.PDF 264K 821983.PDF 306K Connor Kijowski <ckijowski@utah.gov>Thu, Jun 15, 2023 at 9:11 AM To: "Jorgensen, Bryan (Staker Parson)" <Bryan.Jorgensen@stakerparson.com> Not a problem, thanks for sending these. I have no additional questions at this time. Sometimes it's a little too easy to work late during this season! Thanks again, Connor [Quoted text hidden] Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com>Thu, Jun 15, 2023 at 1:07 PM To: Connor Kijowski <ckijowski@utah.gov> Hey Connor, I also forgot to let you know that McGuire has not treated the haul roads with mag yet this year, but are on the list to be done. They usually do this twice a year. Thanks, Bryan Jorgensen Environmental Specialist Staker Parson Materials & Construction, HK Contractors, Evans Construction A CRH COMPANY 2350 South 1900 West Ogden, UT 84401 O +1 (801) 409-2472 C +1 (801) 648-5483 E bryan.jorgensen@stakerparson.com 8/4/23, 10:54 AM State of Utah Mail - Air Quality Inspection Request for Records - Staker Parson McGuire Pit https://mail.google.com/mail/u/0/?ik=0e8810739b&view=pt&search=all&permthid=thread-a:r1058408170161243493&simpl=msg-a:r-55911044805916…5/5 From: Connor Kijowski <ckijowski@utah.gov> Sent: Wednesday, June 14, 2023 7:26 PM To: Jorgensen, Bryan (Staker Parson) <Bryan.Jorgensen@stakerparson.com> Cc: Couch, Boe (Staker Parson) <boe.couch@stakerparson.com> [Quoted text hidden] [Quoted text hidden] Connor Kijowski <ckijowski@utah.gov>Thu, Jun 15, 2023 at 1:51 PM To: "Jorgensen, Bryan (Staker Parson)" <Bryan.Jorgensen@stakerparson.com> Great, thank you for that additional information! [Quoted text hidden] SCALE 1/30 DIMENSIONS FOR ORDERING WIRECLOTH FOR COMPLETE DECK QTY 5 REQUIRED SCALE 1 / 6 SCALE 1 / 24 SCALE 1 / 32 SECTION A-A SCALE 1 / 16 DETAIL B SCALE 1 / 2 DETAIL C SCALE 1 / 15 BILL of MATERIAL QTYWIDLENDESCRIPTIONPART NOITEM 1 DECK TOP 3X HD 7-RAIL SNG CRW8214931 10 DRAWPL 5 X 48 X 5/166204782 40 BOLT CARRIAGE 5/8 11NC X4-1/20700353 40 WASHER SPH 21/32 ID FOR 5/86200294 40 NUT 5/8-11NC HVY ZINC0760105 A A B C 86470 Franklin Boulevard Eugene, OR 97405 (541) 736-1400 FAX: (541) 988-9401 This print is loaned subject to return upon demand, and upon the express condition that it not to be reproduced or copied, or information from it furnished to others, or be used in any way detrimental to the interests of JCI, Inc. , an Astec company. All specifications are subject to change without notice. TOLERANCES UNLESS NOTED of SHEET: THIRD ANGLE PROJECTION DWG TITLE: DATE: CHK'D: DWN:SCALE: REVDWG NO. Machining: Fabricating: Angles: Finish: “ 0.015" “ 0.062" “ 1ƒ 125 1 1 PAK DECK BOT 8202HS/7R/SC/3X L. OLSEN 11/24/2009 0821620 B SHEET SIZE CALCULATED WEIGHT: 4359.6 lbmass Johnson Crushers International, Inc. 1 2 354 (98.500 “ 0.250) OUTSIDE HOOK TO OUTSIDE HOOK INSIDE WIDTH OF SCREEN MINUS 1.500" 48.000 - 0.250 0.000 + NOTES: 1. OUTSIDE HOOK TO OUTSIDE HOOK DIMENSION IS BASED ON INSIDE WIDTH OF SCREEN MINUS 1.500". 2. HAS TO WORK WITH 5/16 THICK DRAWPLATES. 0.000 48.000 96.000 144.000 192.000 240.000 0.000 2.674 14.000 26.000 38.000 50.000 62.000 74.000 86.000 97.326 100.000 1.000 B0.250 45.0ƒ (1.203) DETAIL A SCALE 1 / 15 SECTION B-B SCALE 1 / 16 DIMENSIONS FOR ORDERING WIRECLOTH FOR COMPLETE DECK QTY 5 REQUIRED SCALE 1 / 6 SCALE 1 / 24 DETAIL C SCALE 1 / 2 A B B C BILL of MATERIAL QTYWIDLENDESCRIPTIONPART NO.ITEM 1 DECK TOP 8202MS/7R/SC/HD8233951 10 DRAWPL 5 X 48 X 5/166204782 40 BOLT CARRIAGE 5/8 11NC X4-1/20700353 40 WASHER SPH 21/32 ID FOR 5/86200294 40 NUT 5/8-11NC HVY ZINC0760105 86470 Franklin Boulevard Eugene, OR 97405 (541) 736-1400 FAX: (541) 988-9401 This print is loaned subject to return upon demand, and upon the express condition that it not to be reproduced or copied, or information from it furnished to others, or be used in any way detrimental to the interests of JCI, Inc. , an Astec company. All specifications are subject to change without notice. TOLERANCES UNLESS NOTED ofSHEET: THIRD ANGLE PROJECTION DWG TITLE: DATE: CHK'D: DWN:SCALE: REVDWG NO. Machining: Fabricating: Angles: Finish: B 0.015" B 0.062" B 1` 125 1 1 PAK DECK TOP 8203MS/7R/SC SSTEELE 5/22/2017 0823400 B SHEET SIZE CALCULATED WEIGHT: 6561.5 lbmass Johnson Crushers International, Inc. 2 2 345 (97.750 “ 0.250) OUTSIDE HOOK TO OUTSIDE HOOK INSIDE WIDTH OF SCREEN MINUS 2.250" 1.500" STANDARD AND MINUS 0.750" FOR 3/8" TOP DECK SIDE LINERS. 48.000 - 0.250 0.000 + 45.0ƒ 1.000 B0.250 1.203() NOTES: 1. OUTSIDE HOOK TO OUTSIDE HOOK DIMENSION IS BASED ON INSIDE WIDTH OF SCREEN MINUS 1.500" AND MINUS 0.750" FOR 3/8" TOP DECK SIDE LINERS. 2. HAS TO WORK WITH 5/16 THICK DRAWPLATES. 0.000 48.000 96.000 144.000 192.000 240.000 0.000 2.219 14.000 26.000 38.000 50.000 62.000 74.000 86.000 97.781 100.000 DETAIL A SCALE 1 / 15 SECTION B-B SCALE 1 / 16 DIMENSIONS FOR ORDERING WIRECLOTH FOR COMPLETE DECK QTY 5 REQUIRED SCALE 1 / 6 SCALE 1 / 24 DETAIL C SCALE 1 / 2 A B B C BILL of MATERIAL QTYWIDLENDESCRIPTIONPART NO.ITEM 1 DECK TOP 3X HD 7-RAIL SNG CRW8219841 10 DRAWPL 5 X 48 X 5/166204782 40 BOLT CARRIAGE 5/8 11NC X4-1/20700353 40 WASHER SPH 21/32 ID FOR 5/86200295 40 NUT 5/8-11NC HVY ZINC0760106 86470 Franklin Boulevard Eugene, OR 97405 (541) 736-1400 FAX: (541) 988-9401 This print is loaned subject to return upon demand, and upon the express condition that it not to be reproduced or copied, or information from it furnished to others, or be used in any way detrimental to the interests of JCI, Inc. , an Astec company. All specifications are subject to change without notice. TOLERANCES UNLESS NOTED ofSHEET: THIRD ANGLE PROJECTION DWG TITLE: DATE: CHK'D: DWN:SCALE: REVDWG NO. Machining: Fabricating: Angles: Finish: B 0.015" B 0.062" B 1` 125 1 1 PAK DECK CTR 8203MS/7R/SC/HD L. OLSEN 11/24/2009 0821983 B SHEET SIZE CALCULATED WEIGHT: 4441.9 lbmass Johnson Crushers International, Inc. 2 356 (98.500 “ 0.250) OUTSIDE HOOK TO OUTSIDE HOOK INSIDE WIDTH OF SCREEN MINUS 1.500" 48.000 - 0.250 0.000 + 45.0ƒ 1.000 B0.250 1.203() NOTES: 1. OUTSIDE HOOK TO OUTSIDE HOOK DIMENSION IS BASED ON INSIDE WIDTH OF SCREEN MINUS 1.500". 2. HAS TO WORK WITH 5/16 THICK DRAWPLATES. 2 0.000 2.674 14.000 26.000 38.000 50.000 62.000 74.000 86.000 97.326 100.000 0.000 48.000 96.000 144.000 192.000 240.000