HomeMy WebLinkAboutDAQ-2024-004090FILIEEFI PO Box 907
Brigham City, UT 84302
www.nucorbuildingsystems.com
Phone: 435-919-3100BU'LE'ING .SYSTEIVIS - UTA,H, LLC
Date: January 4,2024
Subpart XXXXXX Coordinator
Division of Air Quality
Utah Department of Environmental Quality
P.O. Box 144820
Salt Lake city, UT 84114-4820
! \ \r - i] ':tl?i;
LIVIsIOI! OF AIR OUALITY
Subject:Annual Certification and Compliance Report
Under 40 C.F.R. Part 63. Subpart XXXXXX
Dear Sir or Madam:
This document is submitted to meet the requirements for Annual Certification and Compliance
Reports as specified in 40 C.F.R. Part 63, Subpart XXXXXX (40 C.F.R. 63.11519OX1).
40 CFR 63.11519O)Q) Dates:
(i-iii) Applicable dates
This report covers the following reporting period:
Start date: January 1,2023
End date: December 31,2023
40 CFR 63.115lg(b)(3) Alternate dates:
Not applicable.
40 CFR 63.11519(b)(4) General requirements:
(i) Company's nnme and address
Owner and Operator:
Nucor Building Systems, Utah, LLC
P.O. Box 907
1050 N. Watery Lane
Brigham City, UT 84302
ACCNEDITED
REVIEWEDInitials:Date:Jan 16, 2024Compliance Status: OKFile #: 10028 (B2)
FIUEEIFI PO Box 907
Brigham City, UT 84302
www. nucorbui ldingsystems.com
Phone: 435-919-3100BU'LDING .SYSTEMS - UTA,H, LLC
(ii) A statement by a responsible olftcial with that official's namq title, and signature,
certifying the truth, accuracy, and completeness of the contents of this report;
I hereby certifr the truth, accuracy, and completeness of this annual report.
Nucor Building Systems, Utah, LLC General Manager I D;Vi;iuN Oi: AIR Gl,a.LlTy
(%
(iii) Date of Report, and beginning and ending dates of the reporting period
Date of report: January 4,2024
Start date: January I,2023
End date: December 31,2023
40 CFR 63.11519(b)(5) Visual determination offugitive emissions requirements
(i) Date of every visual determination offugitive emissions which resulted in detection of
visible emissions;
No visible emissions were observed during the reporting period.
(ii) Description of conective actions taken subsequent to the test
No visible emissions were observed during the reporting period. Therefore, no corrective actions
were required.
(iii) Date and results offollow-up visual determination offugitive emissions performed after
the corrective actions.
No visible emissions were observed during the reporting period. Therefore, no corrective
actions, or follow-up visual determinations were required.
40 CFR 63.11519(b)(6) Visual determination of emissions opacity requirements
No visible emissions were observed during the reporting period. Therefore, no opacity
measurements were required.
Name: Kris Kutterer
aA.uEs\u/
ACCREDrIEO
FIrJEEFI PO Box 907
Brigham City, UT 84302
www. nucorbuildingsystems.com
Phone: 435-919-3100BIJILE ING .SYSrErtnS - UTAH, LLC
40 CFR 63.11519(b)(7) Reserved
Not applicable.
40 CFR 63.11519(b)(8) Exceedences of 20 percent opacityfor welding affected sources
No visible emissions were observed during the reporting period. Therefore, no opacity
measurements were required.
40 CFR 63.11519(b)(9) Site-speciJic Welding Emissions Management Plan reporting
No visible emissions were observed during the reporting period. No opacity measurements were
required. Therefore, a Site-specific Welding Emissions Management Plan was not required.
' r1-, _. r'ir i)/iF. i ,r,,i, L l Ui:
!',". i ii i:l.: t'.:a.]:j..j i;,i: Q i-lAI l-r-y-- I
IKris Kutterer
General Manager
Nucor Building Systems, Utah, LLC
CC: US EPA Region 8
OLIALITY
.4,@
ACCREDTTEO