Loading...
HomeMy WebLinkAboutDAQ-2024-004344Electronic Submittal January 25, 2024 Mr. Harold Burge, Manager Utah Division of Air Quality 195 North 1950 West Salt Lake City, Utah 84116 Re: Kinder Morgan Altamont LLC Altamont Main Gas Processing Plant (Title V Permit #1300006003) 40 CFR 60 subpart OOOO Semiannual LDAR Report July 1, 2023 through December 31, 2023 Dear Mr. Burge, Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the attached Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOO, Standards of Performance for Crude Oil and Natural Gas Production, Transmission, and Distribution. This report covers the period from July 1, 2023 through December 31, 2023. If you have any questions or require additional information, please contact me by phone at (303)914-7605 or by email at Erin_Dunman@KinderMorgan.com. Sincerely, Erin Dunman Environmental Engineer Attachments: Attachment 1: NSPS OOOO Semiannual LDAR Report Cc: Joe Randolph (UDAQ) rcvd email 1/25/24 REVIEWED Initials JBR Date 1/29/24 Comp Status Meets File # 10005 Blue 2 ATTACHMENT 1 NSPS OOOO SEMIANNUAL LDAR REPORT Kinder Morgan LLC - Altamont Main Gas Processing Plant 17790 W. 3750 N. Altamont, UT 84001 Page 1 Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOO This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOO, Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution. This report covers the period from July 1, 2023 through December 31, 2023. Below is the specific information required by §60.5422(a) and (c). 60.487a(c)(1) Process Unit Identification • Condensate • Refrigeration • Truck Loading Second Half 2023 Citation Jul Aug Sep Oct Nov Dec Valves – Gas Vapor/Light Liquid 60.487a(c)(2)(i) Leak count 5 11 5 3 9 3 60.487a(c)(2)(ii) Repaired Late 0 0 0 0 0 0 Pumps – Light Liquid 60.487a(c)(2)(iii) Leak Count 0 0 0 0 1 1 60.487a(c)(2)(iv) Repaired Late 0 0 0 0 0 0 Pressure Relief Devices – Gas Vapor/Light Liquid 60.5422(c)(1) Leak Count 0 0 0 0 0 0 60.5422(c)(2) Repaired late 0 0 0 0 0 0 Connectors 60.5422(a) & 60.487a(c)(2)(vii) Leak Count 1 1 1 0 2 0 60.5422(a) & 60.487a(c)(2)(viii) Repaired late 0 0 0 0 0 0 Reporting per 60.487a(c)(2)(xi) No components were placed on delay of repair during the semi-annual reporting period. Reporting per 60.487a(c)(3) There were no process unit shutdowns during the reporting period. Kinder Morgan LLC - Altamont Main Gas Processing Plant 17790 W. 3750 N. Altamont, UT 84001 Page 2 Reporting per 60.487a(c)(4) Reportable Inventory Components Current Period Ending 6/30/2023 Current Period Ending 12/31/2023 Valves (Excluding no detectable emissions) (60.487a(b)(2)) 782 785 Pumps (excluding dual-seal and closed vent) (60.487a(b)(3)) 6 7 Connectors (60.487a(b)(5)) 3569 3605 ATTACHMENT 2 REPAIR DELAYED HISTORY REPORT