Loading...
HomeMy WebLinkAboutDAQ-2024-004345Submitted via EPA CEDRI January 22, 2024 Director, US EPA Region 8 US EPA Region 8 Enforcement and Compliance Assurance Division 1595 Wynkoop Street, Mail Code 8ENF Denver, CO 80202-1129 Re: Kinder Morgan Altamont LLC Altamont Main Gas Processing Plant (Title V Permit #1300006003) 40 CFR 60 subpart OOOOa Semiannual LDAR Report July 1, 2023 through December 31, 2023 Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the enclosed Semi-annual Monitoring Report as required by 40 CFR 60 Subpart OOOOa. The monitoring report covers the semi-annual period from July 1, 2023 through December 31, 2023. If you have any questions or concerns please contact me by phone at (303) 914-7605, or at erin_dunman@kindermorgan.com. Sincerely, Erin Dunman Environmental Engineer Attachments: Attachment 1: NSPS OOOOa Semiannual LDAR Report Attachment 2: CEDRI report template Attachment 3: Delay of Repair Form Cc: Mr. Harold Burge, Manager Division of Air Quality 195 North 1950 West Salt Lake City, Utah 84116 Electronic Submittal rcvd email 1/25/24 REVIEWED Initials JBR Date 1/29/24 Comp Status Meets File # 10005 Blue 2 OOOO under sep rpt Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOOa This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOOa, Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification, or Reconstruction Commenced after September 18, 2015. This report covers the period from July 1, 2023 through December 31, 2023. Below is the specific information required by §60.5422a(a)-(c). 60.487a(c)(1) Process unit identification • Fractionation • Inlet • Storage 60.487a(c)(2)(i)-(iv), (vii)-(viii), and 60.5422a(c) Provided in reporting template submitted via CEDRI. 60.487a(c)(2)(xi) See attached. 60.487a(c)(3) There were not process unit shutdowns during the reporting period. 60.487a(c)(4) Component Type Component Count (period ending 6/30/2023) Component Count (period ending 12/31/2023) Valve 2587 2524 Pump 6 6 Connector 9372 9382 Facility Record No. *  (Field value will  automatically  generate.) Facility Name * Address of Processing  Plant*Address 2 City * County * State  Abbreviation*Zip Code * Responsible  Agency  Facility ID  (State Facility  Identifier) Beginning Date of  Reporting Period *  Ending Date of  Reporting Period *  Please enter any  additional  information Enter associated file  name reference.  e.g.: ABC Company e.g.: 123 Main Street e.g.: Suite 100 e.g.: Brooklyn e.g.: Kings County e.g.: NY e.g.: 11221 e.g.: 01/01/2016 e.g.: 06/30/2016 e.g.: filename.pdf 1 Altamont Main Gas P17790 West 3750 NorthPO Box 587 Altamont Duchesne UT 84001 UDEQ 07/01/2023 12/31/2023 2024‐01‐22 Altamont Main OOOOa semiannu FACILITY INFORMATION ADDITIONAL INFORMATION 40 CFR Part 60 ‐ Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 ‐ 60.5422a(a) Semiannual Report The asterisk (*) next to each field indicates that the corresponding field is required. Facility Record No. *  (Select from  dropdown list) Month Identification*  (Select from  dropdown list) Number of pressure  relief devices for  which leaks were  detected * (§60.5422a(c)(1)) Number of pressure  relief devices for  which leaks were not  repaired * (§60.5422a(c)(2)) Number of valves for  which leaks were  detected * (§60.487a(c)(2)(i)) Number of valves for  which leaks were not  repaired * (§60.487a(c)(2)(ii)) Number of pumps for which  leaks were detected * (§60.487a(c)(2)(iii)) Number of pumps for  which leaks were not  repaired * (§60.487a(c)(2)(iv)) Number of connectors  for which leaks were  detected * (§60.487a(c)(2)(vii),  §60.5422a(a)) Number of connectors for  which leaks were not  repaired * (§60.487a(c)(2)(viii),  §60.5422a(a)) e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 1 July 00511 0 15 0 1 August 0 0 23 0 1 0 14 0 1 September 00500 0 10 0 1 October 00700 0 7 1 1 November 0 0 32 0 0 0 4 1 1 December 0 0 10 0 0 0 2 0 40 CFR Part 60 ‐ Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 ‐ 60.5422a(a) Semiannual Report The asterisk (*) next to each field indicates that the corresponding field is required. EQUIPMENT INFORMATION Repair Delay - Current List (R323_1)Report Date:11/28/2023 Report Parameters Unit:All Units UNIT:FRACTIONATION AREA: Unrepairable Delayed for Shutdown Expected Repair Last Date Last PPM Ref. No. Date DelayedTag#:Class Location Reason For Delay Approved By Drawing 000148. 0E CONEC T SE SDE OF V-19 ON DECK 11/13/23 1330 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ BEN BARNS 11/15/2 3 6/30/24 FRACTIONATION 000253. 01R VALVE N SDE OF FIN FAN E OF DEPROP TWR 11/9/23 43299 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ BEN BARNS 6/14/23 6/30/24 FRACTIONATION 002570. 00 VALVE NE OF V-1 DEETH TOWER IN PIPE RACK ABOVE 1ST INSULATED LINE MD 11/14/23 9770 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ BEN BARNES 7/31/23 6/30/24 FRACTIONATION This report produced using LeakDAS. Last modified: 4/20/2021 Page 1 of 2 Repair Delay - Current List (R323_1)Report Date:11/28/2023 Report Parameters Unit:All Units UNIT:INLET AREA:NORTH INLET Unrepairable Delayed for Shutdown Expected Repair Last Date Last PPM Ref. No. Date DelayedTag#:Class Location Reason For Delay Approved By Drawing 001471. 0B CONEC T N SDE OF HP SLUG CATCHER 11/10/23 1633 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ BEN BARNES 10/30/2 3 6/30/24 INLET This report produced using LeakDAS. Last modified: 4/20/2021 Page 2 of 2