Loading...
HomeMy WebLinkAboutDAQ-2024-004453KTHDEwoB$#il FedEx 27OO79309696 January 22,2024 Bryce Bird, Director Utah Department of Environmenta! Quality Division of Air Quality 195 North 1950 West salt Lake city, utah 84LL6 UTAH DEPARTMENT OF ENVIRONMENTAL OUAUTY llu a. .J i\.'i (' , t Re: I);\,'ISION OF AIR QUALITY Kinder Morgan Altamont LLC Altamont Main Gas Processing Plant, Title V Operating Permit No. 1300006003 Semiannual Monitoring Report -July L,2OZg through December 3L,2023 Dear Mr. Bird, Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report for the reporting period from July L,2023 through December 3L, 2023 as required by Condition l.S.2.a of Title V Operation Permit No. 1300006003 for the Altamont Main Gas Processing Plant (Altamont Plant). There were two (2) deviations from the facility Title V Operating Permit conditions during the compliance period covered by this six month monitoring report. lf you have any questions or. ,"qrir"'rdditional information, please contact me by phone at (303) 974-7605 or by email at Erin_Dunman@KinderMorgan.com. Sincerely, Erin Dunman Environmental Engineer Enclosures: o Six-Month Monitoring Report (July 1, 2023 through December 3t,2023l, REVIEWED Initials JBR Date 2/5/2024 Comp Status Meets File # 1010005 Blue 1 2 dev rpt and in file. EhIVI RONMENTAL {]t,lALITY TO: FROM: RE: DATE: KrNoeFlfiUloB.s*![ SIX MONTH MONITORING REPORT Director, Utah Division of Air Quality Kinder Morgan LIC - Altamont Main Gas Processing Plant Monitoring Report for Permit # 1300006003 lanuarv 22,2024 ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC) R307-415-6a(3XcXi), the following monitoring report is submitted. This Report covers the period from July t,2023 through December 3L,2023. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision l.S.2.a and UAc R307-a1s-6a (3XcXi). ln lieu of attachingthe above list, deviation reports submitted in accordance with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii)as referenced below. August 2,2023 submittalfor not repairing a OOOOa leaking valve placed on delay of repair during the plant shutdown. The plan is to repair to the valve during the next plant shutdown in June 2024. Deviation was identified on July 25, 2023. October 3,2023 submittalfor Unit ICE-6 exceeding permitted emissions limit for CO. Deviation occurred on September 26, 2023 and unit was successfully retested on September 28, 2023. ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certif,i that the statements and information in this document are true, accurate, and complete. Don Perkins, Director tr tr tr 1. 2. DtvtstoN oF AtR oilALtTY ature of Responsible Official for the Source Print or type the name and title of Responsible Official