HomeMy WebLinkAboutDAQ-2024-004453KTHDEwoB$#il
FedEx 27OO79309696
January 22,2024
Bryce Bird, Director
Utah Department of Environmenta! Quality
Division of Air Quality
195 North 1950 West
salt Lake city, utah 84LL6
UTAH DEPARTMENT OF
ENVIRONMENTAL OUAUTY
llu a.
.J i\.'i (' , t
Re:
I);\,'ISION OF AIR QUALITY
Kinder Morgan Altamont LLC
Altamont Main Gas Processing Plant, Title V Operating Permit No. 1300006003
Semiannual Monitoring Report -July L,2OZg through December 3L,2023
Dear Mr. Bird,
Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report
for the reporting period from July L,2023 through December 3L, 2023 as required by Condition
l.S.2.a of Title V Operation Permit No. 1300006003 for the Altamont Main Gas Processing Plant
(Altamont Plant).
There were two (2) deviations from the facility Title V Operating Permit conditions during the
compliance period covered by this six month monitoring report.
lf you have any questions or. ,"qrir"'rdditional information, please contact me by phone at (303)
974-7605 or by email at Erin_Dunman@KinderMorgan.com.
Sincerely,
Erin Dunman
Environmental Engineer
Enclosures:
o Six-Month Monitoring Report (July 1, 2023 through December 3t,2023l,
REVIEWED
Initials JBR Date 2/5/2024
Comp Status Meets
File # 1010005 Blue 1
2 dev rpt and in file.
EhIVI RONMENTAL {]t,lALITY
TO:
FROM:
RE:
DATE:
KrNoeFlfiUloB.s*![
SIX MONTH MONITORING REPORT
Director, Utah Division of Air Quality
Kinder Morgan LIC - Altamont Main Gas Processing Plant
Monitoring Report for Permit # 1300006003
lanuarv 22,2024
ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC)
R307-415-6a(3XcXi), the following monitoring report is submitted.
This Report covers the period from July t,2023 through December 3L,2023.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The
list includes the information required by Operating Permit provision l.S.2.a and
UAc R307-a1s-6a (3XcXi).
ln lieu of attachingthe above list, deviation reports submitted in accordance
with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii)as referenced below.
August 2,2023 submittalfor not repairing a OOOOa leaking valve
placed on delay of repair during the plant shutdown. The plan is to
repair to the valve during the next plant shutdown in June 2024.
Deviation was identified on July 25, 2023.
October 3,2023 submittalfor Unit ICE-6 exceeding permitted
emissions limit for CO. Deviation occurred on September 26, 2023 and
unit was successfully retested on September 28, 2023.
ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on
information and belief formed after reasonable inquiry, I certif,i that the statements and
information in this document are true, accurate, and complete.
Don Perkins, Director
tr
tr
tr
1.
2.
DtvtstoN oF AtR oilALtTY
ature of Responsible Official for the Source
Print or type the name and title of Responsible Official