Loading...
HomeMy WebLinkAboutDERR-2024-0063456952 South High Tech Drive Midvale, Utah 84057 P (801) 545-8500 Terracon.com January 29, 2024 Utah Department of Environmental Quality Division of Environmental Response and Remediation P.O. Box 144840 195 North 1950 West Salt Lake City, Utah 84114-4840 Attn:Mr. Hong-Lei Tao P:385-391-8138 E:htao@utah.gov RE: Monitoring Well Abandonment Report Work Assignment JFK-20-TER Former Freeway Chevron - 990 Buena Vista Boulevard, Washington, Utah Facility ID 6000209, Release Site JFK Terracon Project No. AL067006 Dear Mr. Tao: Terracon Consultants, Inc. (Terracon) has prepared this letter to document the abandonment of the groundwater monitoring wells associated with Release Site JFK at the former Freeway Chevron site in Washington, Utah. Terracon prepared Work Plan JFK-19 to outline the scope of work assumed to be required to abandon the existing monitoring wells. Work Plan JFK-19 included abandonment of 6 on-site monitoring wells and 5 off-site monitoring wells associated with Release Site JFK. Terracon mobilized to the site on January 17, 2024. Upon review of the newly developed site, it was determined that all on-site monitoring wells had been destroyed during redevelopment and re-grading of the site for the installation of the new convenience store and fueling facility. Additionally, only 4 of the 5 off-site wells were still located off-site as MW-9 was destroyed during re-grading of the area. A total of 4 off-site monitoring wells remained in the area (MW- 10, MW-13, MW-15 and MW-16R) and were abandoned following the protocol outlined in the Work Plan. All groundwater monitoring wells that were associated with the release were either destroyed or properly abandoned. A photographic log of the site conditions and off-site monitoring well abandonment procedures is attached. Work Plan JFK-20 - Well Abandonment Former Freeway Chevron Release Site JFK | Washington, Utah January 29, 2024 | Terracon Project No. AL067006 Facilities |Environmental | Geotechnical | Materials 2 If you should have any questions or comments regarding this project, please contact Amy Austin at (801) 746-5464. Sincerely, Terracon Consultants, Inc. Amy Austin Andy King, P.G. Certified UST Consultant #CC238 Certified UST Consultant #CC030 Attached: Photographic Log ' P \ ' X V W L Q Work Plan JFK-20 - Well Abandonment Former Freeway Chevron Release Site JFK | Washington, Utah Site Photos January 17 and 18, 2024 | Terracon Project No. AL067006 1 Photo #1 View West. Former Freeway Cheveron Station demolished and replaced with new Maverik Station. Entire site was regraded. Photo #2 View North. Entire site was regraded and resurfaced. All onsite monitoring wells were destroyed. Asphalt covering former MW locations. Photo #3 View South. Entire site was regraded and resurfaced. All onsite monitoring wells were destroyed. Asphalt covering former MW locations. Photo #4 View West. Entire site was regraded and resurfaced. All onsite monitoring wells were destroyed. Asphalt covering former MW locations. Photo #5 View East. Entire site was regraded and resurfaced. Photo #6 View South. Roadside median area was regraded and resurfaced with gravelly cobble. Work Plan JFK-20 - Well Abandonment Former Freeway Chevron Release Site JFK | Washington, Utah Site Photos January 17 and 18, 2024 | Terracon Project No. AL067006 2 Photo #7 View South. Offsite regraded roadside median area where MW-9 was located. MW-9 destroyed during regrading. Photo #8 View North-east. MW-9 flushmount completion laying on surface. MW-9 destroyed during regrading of the area. Photo #9 View South. Preparing to abandon offsite monitoring well MW-13. Photo #10 Monitoring abandonment methodology (MW-13). Fill with bentonite and hydrate. Photo #11 Cap placed on top of filled casing.Photo #12 Additional bentonite placed in surface completion and hydrated.