HomeMy WebLinkAboutDDW-2024-007291 April 23, 2024 Kale Watkins Morgan City Water System PO Box 1085 Morgan, Utah 84050 Subject:Approval of 2024 Water Line Installation Standards per R309-500-7;Morgan City Water System, System #15008, File #13669 This Approval expires on June 30, 2029. Dear Kale Watkins: The Division of Drinking Water (the Division) received the following documents on April 8, 2024: The 2024 water line installation drawings and specifications for Morgan City Water System, stamped and signed by Matthew Hartvigsen, P.E., and dated August 24, 2023. The completed application form signed by Kale Watkins and dated April 8, 2024, formally designates: Matthew Hartvigsen, P.E., as the Professional Engineer (PE) has direct responsibility for the design of the entire water, and Matthew Hartvigsen, P.E., is the PE responsible for oversight of the hydraulic analysis of the entire water system. We completed our review of the 2024 water line installation drawings and specifications and found theybasically comply with the applicable portions of Utah's Rules for Public Drinking Water Systems in R309-550. On this basis, Morgan City Water System 2024 water line installation drawings and specificationsare hereby approved. Morgan City Water System has met the criteria in R309-500-7 to install water lines up to 16 inches in diameter and is not required to obtain Plan Approval or an Operating Permit for the qualified water line projects. Please note the following restrictions to this approval: 1. This approval does not apply to booster pump stations. 2. If minimum separation between water and sewer lines cannot meet the requirements in R309-550-8, an exception must be obtained prior to water line construction.This Approval expires on June 30, 2029. You must notify the Division if there is a change to standard installation drawings and specifications or the designated PE for design or hydraulic analysis during the term of this Approval. To continue using standard installation drawings and specifications for water transmission and distribution lines after the expiration date, you must submit a complete renewal application to the Division.Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this approval, please contact Cameron Draney, P.E., of this office, at (385) 271-7039, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager CLD/mrn/mdbcc:Scott Braeden, Weber Morgan Health Department, sbraeden@co.weber.ut.usKale Watkins, Morgan City Water System, kwatkins@morgancityut.org Matthew Hartvigsen, P.E., Jones Civil, matth@jonescivil.com Cameron Draney, P.E., Division of Drinking Water, cdraney@utah.gov CDraney 15008 13669 Approved Water Line Installation Standards