Loading...
HomeMy WebLinkAboutDERR-2025-009030 SITE VISIT REPORT DATE: 12/03/2025 SITE: The Other Side Village Phase II VCP SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Bill Rees (DERR), Tim Stay (TOSA), Lew Swain (TOSA), Catherine Wyffels (Salt Lake City), Amy Austin (Terracon), Jill Hernandez (Terracon) ARRIVAL TIME: 2:00 PM - DEPARTURE TIME: 4:00 PM Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: The goal of the visit was to check-in on Phase I (Redwood Road Dump VCP) of the project and to understand TOSA’s needs for timing on Phase II (The Other Side Village VCP). TOSA has expressed interest in focusing on a smaller phase within Phase II. The group also discussed potential options for excess fill material that would need to be removed from Phase II. The group then walked the perimeter of Phase I and discussed some of the recent data and findings from the site characterization report for Phase II. PHOTO LOG: Photo 1: Looking north to the Phase II area (from the northern end of Phase I).