Loading...
HomeMy WebLinkAboutDERR-2025-009029 SITE VISIT REPORT DATE: 12/03/2025 SITE: Redwood Road Dump VCP SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Bill Rees (DERR), Tim Stay (TOSA), Lew Swain (TOSA), Catherine Wyffels (Salt Lake City), Amy Austin (Terracon), Jill Hernandez (Terracon) ARRIVAL TIME: 2:00 PM - DEPARTURE TIME: 4:00 PM Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: The goal of the visit was to check in with the group on the status of the remedial action plan (RAP) for the Redwood Road Dump VCP site. Most of the RAP has already been implemented, with some remaining vapor mitigation systems not yet in place for the remainder of the homes and the technical building to the south. The group also discussed the timing of developing a monitoring well network as part of the site management plan now that construction is mostly complete. The group then walked the perimeter of the site and checked the areas in real time. All work completed to date has been consistent with the RAP. PHOTO LOG: Photo 1: Permanent fence installed along eastern boundary in accordance with the RAP. Photo 2: Homes have been installed and landscaped on the northern end of the site.