Loading...
HomeMy WebLinkAboutDSHW-2024-005919Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 www .cleanharbors .com April 17, 2024 Sent via dwmrcsubmit@utah.gov Mr. Douglas J. Hansen Division of Waste Management & Radiation Control Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4880 RE: Responses to Compliance Advisory Letter No. 2402018 DWMRC 2023 Annual Inspection UTD 981 552 177 Dear Mr. Hansen, Clean Harbors Aragonite LLC (CHA) is in receipt of your letter dated March 19, 2024, regarding the Compliance Evaluation Inspection conducted by the DWMRC in 2023. As noted, many of these alleged violations were self-reported and corrective actions were taken promptly when the issue(s) was discovered. For other alleged violations, CHA acted where possible when notified by the DWMRC. CHA is providing explanations and justification on the corrective actions requested by the DWMRC. These responses are for finding numbers eight (8) and nine (9) found on Compliance Advisory Letter No. 2402018. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision according to a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Should you have any questions regarding this matter, please contact me at the number listed below. Sincerely, William L Simmons Facility GM III Clean Harbors Aragonite, LLC 11600 North Aptus Road PO Box 1339 Grantsville, Utah 84029-1339 (o) 435.844.8351 (c) 870.310.6029 simmons. william@cleanharbors.com www.cleanharbors.com Compliance Advisory Letter No. 2402018 This docwnent is CHA's response to both corrective actions on Compliance Advisory Letter No. 2402018 Finding #8 -Section 1.2 of Attachment 8 requiring AG to ship rejected wastes no more than 60 Days from the Plant Received date. CHA Response: • • Container A0070TX3 o This container was Plant Received on 11 /15/2022 and shows placed in OFFC on 12/7/2022 due to the container being a'!. extra on a shipment. The container was Rejected to an Alternate facility and shipped out on 1/28/2023. o CHA has been conducting Daily Pyrophoric Audits amongst the teams to prevent containers in CR status from making it to CHA . This will also provide CHA additional visibility on pyrophoric containers throughout the Clean Harbors Network. Container A0024QTC o This container was Plant Received to CHA on 4/21/2022, was scanned to the Receiving floor on 5/14/2022, and was placed in storage on 5/15/2022. The container left CHA on 6/18/2022 on trailer 3202339, with a destination to WI (container was on the property for 34 Days). o On 9/8/2022, container A0024QTC arrived back onto the property, as was placed in storage. o Container A0024QTC was placed in the OFFC row for investigation on 1/22/2023 due to a profile issue and was resolved and Rejected to an Alternate Facility within 15 Days. The container was finally sent off the property on 212/2023 with a new container number A007KPSK o CHA shall retrain operators to mitigate the potential for these issues to occur. • Container A006517V o This container shows Plant received to CHA on 10/25/2022. However , this container was not scanned to the floor , and was given permission prior to offload to where it could be Rejected to an Alternate Facility. The manifest for the container (0l 7935424FLE) was having IP issues, so a new manifest was created for the container as well as a new container number generated (A005YNC9). Finding #9 -Section 2 of Attachment 14 requiring annual inspections of the duct work between the sludge pad direct burn system and the closed vent system. CHA Response -CHA performs annual inspections of the duct work between the sludge pad direct burn system and the closed vent system. CHA has attached the last two (2) annual inspections on this system for reference . There may have been a miscommunication between Page 1 of2 CHA and the DWMRC in regards to the new Drum Pumping station modification, as this new process is not incorporated with the existing closed vent system, and this system is still not in operation. Page 2 of2 Area Information Area: The duct work sections between sludge pad direct burn system and the closed vent system. When it can be inspected: While the sludge pad direct burn system is being operated and incinerator is be in g o perated. Inspection Information Inspector Name: cJ > (J A ~ G µ-AIM. fv"\. 0~ Date of Inspection: It /6/ 2c£,3 j Start Time: {!,· I 0 End Time: ({;30 Are there any leaks, holes, gaps, loose connections, corrosion, etc. that Yes ~ could lead to detectable emissions? (circle either yes or no) PID Meter Readings Background Result: o.o ppm Sample Result: o.o ppm Actual Result (Background Result -Sample Result): 0-0 ppm Note : Actual result must be below 500 ppm for nondetectable emissions Comments: / ,l_, Sy.sf~ JuA ~ f ~ , ',.., 5'..et1.,v ta., ~ft,•~ f /4..t.. <j--w..1e,, Gv .... -p 61.uY u,,..>vt.:__Q S >...s1~+,~ J Mofl._1, ~J 0~ f ~ ~I__ f'1 tJ /'V\J.,,1" .. UL r\ ~ I ) Inspector Signature: IAJhr ~ ~ Area Information Area: The duct work sections between sludge pad direct bum system and the closed vent system. When it can be inspected: While the sludge pad direct bum system is being operated and incinerator is being operated . Inspector Name: Date of Inspection: Start Time: I nspection Information , (J L 11~{\J"'A G f~AIAA/IV\ CJ¾' 1 / ~ / <~ ( Z-u -i-~ End Time: Are there any leaks, holes, gaps, loose connections, corrosion, etc. that could lead to detectable emissions? (circle either yes or no) PID Meter Readings Yes Background Result: __ c_,._l ___ ppm Sample Result: U • ') ppm ------ Actual Result (Background Result -Sample Result): r-i i.f _____ ->_· _____ ppm Not e: Actual result must be below 500 ppm/or nondetectable emissions Comments: fl, 5 .fy 1 I~ 1.v\. I,_ ,;JI) >J O t bzL~ 1 'I'--5"-e f__,V-' •-L /!J4,,t,J ( r,l_ f ";(.6' ;J.Lv.,1_,. ~C---~ ~ Ut.JJ ,~5~J,U'A_ J JUc II--, l:.,----r IA..-t. 1-L. -+ le_ r 11.J /t v1t.-l-~ ,-1..... A I f\ Inspector Signature: /,J /J; ~ ( ~/