Loading...
HomeMy WebLinkAboutDDW-2025-010466State of Utah DEPARTMENT OF NATURAL RESOURCES Division of Water Rights SPENCER J. COX JOEL FERRY TERESA WILHELMSEN Governor Executive Director State Engineer/Division Director DEIDRE M. HENDERSON Lieutenant Governor October 29, 2025 Glendale Town Municipal Corporation P. O. Box 92 Glendale UT 84729 Dear Applicant:RE: WATER RIGHT 81-1605() EXPIRATION DATE: April 29, 2026 Your application to replace an existing well evidenced by 81-1605() is hereby APPROVED. You currently have a right to divert water from the well to be replaced, which is located at a point: North 1215 feet, West 239 feet from the E4 Cor, Sec 36, Town 39S , Range 7W, SLB&M. The drilling of a new well for the purpose of securing a normal water supply must be completed by a currently licensed Utah water well driller and must be accomplished with respect to the following conditions: 1)The replacement well must be drilled within a 150 foot radius of the existing well at the location described in the replacement application, which is: North 1235 feet, West 259 feet from the E4 Cor, Sec 36, Town 39S , Range 7W, SLB&M. 2)No more water can be diverted and beneficially used from the new well than has been previously allowed under valid water rights referencing the old well. 3)You MUST have the licensed driller permanently abandon (seal from bottom to top) the well being replaced (as per State of Utah Administrative Code, R655-4-14) before the drill rig is removed from the site. 4)The new well MUST be constructed in compliance with the construction standards described in the Administrative Rules for Water Well Drillers. Enclosed you will find two postage-paid forms. One is the Driller (START) Card form, which you must give to the licensed driller with whom you contract to drill the new well. The other is the Applicant Card form. It is YOUR RESPONSIBILITY to sign and return this form to this office immediately upon well completion. Your submittal of the APPLICANT Card form will be notice to our office that the work has been completed and will begin the 30-day period in which the driller is to submit a report as required herein. The driller cannot legally commence drilling the new well until you provide him with the Driller (START) Card form, which will then be submitted to our office for verification. You should thoroughly review this letter with the driller so that the instructions and conditions mentioned are understood by all parties. Sincerely, Michael Freeman, P.E., Regional Engineer - Cedar City MF:kb 1594 West North Temple, Suite 220, PO Box 146300, Salt Lake City, UT 84114-6300 telephone (801) 538-7240 - facsimile (801) 538-7467 - www.waterrights.utah.gov