HomeMy WebLinkAboutDSHW-2024-005788Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 www .cleanharbors.com April 11, 2024 Sent via email to dwrnrcsubmit@utah.gov Mr. Douglas J. Hansen, Director Division of Waste Management & Radiation Control Department of Environmental Quality 195 North 1950 West P.O . Box 144880 Salt Lake City, UT 84114-4880 RE: Class 2 Modification -Amendment to Additional Container Pumping Station and Add ability to Store Containers in E-4 Decant Area Construction Certification Clean Harbors Aragonite, LLC UTD 981 552 177 Dear Mr. Hansen, In accordance with Condition l.N of Clean Harbors Aragonite, LLC (CHA) Hazardous Waste Permit and per the DWMRC visit to CHA on April 9, 2024, CHA is submitting an amendment to the previously submitted construction certification notice that the new container pumping station and storage locations within Building E-4 have been constructed according to the approved design and plans contained in the modification request. This amended submittal will be in addition to the Construction Certification submitted to the DWMRC on April 2, 2024. The following documents have been enclosed: • Updated Attachment 7 Appendix 1 (Closure Cost C~lculations) DWMRC visit on April 9,2024 • Document showing Images of the new storage locations within Building E-4, as well as the redundant Drum Pumping Station Process Lines per DWMRC visit on April 9, 2024 I hereby certify under penalty of law that this document was prepared under my direct supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based upon my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations. "People and Technology Creating a Better Environment" [leJ1nUar_~ ~z.uxmx.u.x..ur.u.zw_ Should you have any questions regarding this matter, please contact me at the number listed below. Sincerely, /~~ Kenneth Banks Senior Environmental Compliance Manager Clean Harbors Aragonite, LLC 11600 North Aptus Road PO Box 1339 Grantsville, Utah 84029-1339 (o) 435.884.8233 (c) 435.579.5193 Banks.kenneth@cleanharbors.com www.cleanharbors.com Section II Area Summary Area Summary Activity Area Removal of Transportation Sampling and Transportation Treatment and 1Engineering Certification 2Contigency Decontamination and Disposal of of Waste in Waste Decon Fluid Analysis Stora2e Disposal Expense of Closure Allowance Container Storage $ -$ 253,112 $ 370,670 $ 174,053 $ 1,139,2 04 $ 9,268 ,786 $ 560,292 $ 22,000 $ I, 178,812 Tank Farm $ 14,393 $ 290,683 $ 82,929 $ 23 ,421 $ 237,08 2 $ 669,100 $ 65,881 $ 22,000 $ 140,549 Bulk Solids $ 7,741 $ 125 ,5 68 $ 80,882 $ 33,825 $ 206,283 $ 1,043,000 $ 74,865 $ 12,600 $ 158,477 Sludge Tanks $ 11,113 $ 64,267 $ 42,063 $ 5,283 $ 14,820 $ 225,900 $ 18,173 $ 9,940 $ 39,156 Kiln $ 140,351 $ 537,863 $ 228,928 $ 232,563 $ 198,059 $ 463,800 $ 90,079 $ 21,760 $ 191,341 Pre-Inflation Totals $ 173,598 $ 1,271,493 $ 805,472 $ 469 ,145 $ 1,795,448 $ 11,670,586 $ 809,290 $ 88 ,300 $ 1,708,335 3 Inflation Factor Post Inflation Total Notes 15% of subtotal of removal of waste, decontamination, transportation and disposal of decon fluid, sampling and analysis, transportation of waste in storage and treatment and disposal. 2 10% contingency allowance was used. Total $ 12,966,929 $ 1,546,03 8 $ 1,743,241 $ 430 ,715 $ 2,104,744 $ 18,791,667 1.07 $ 20,107,084 3 1.070 was the required inflation factor/mulitp\er for 2022 to be used when making adjustments to closure/post-closure costs estimates in 2023. The pre-inflation total was multipled by this factor to bring total to current day costs. Attachment 7 --Closure Plan Appendix 1 --Section II Clean Harbors Aragonite, LLC Page I Draft UTD981552177 Section III Closure Costs by Area Container Storage Area Cost Activi,; Summarv Totals 1_Decontaminatioa s 253.112 1Transnortation and Disnosal or Decon Fluid s 370.670 S:unnlinu :snd i\ml,,sls s 174.053 Transnnrtation of Waste in Sloraoe s 1.139.204 Trea.lmcnt and Oisoosal $ 9.268.786 Entered in vaJues Ac riwlb• 'Samoll.nl! a.nd A 1u1h~ Trt1.t1Ino rt:1 U.on o r Wane In Srornf!'t Trea_tm('n l !wd Dt,noffl.l Container Storage Area PCB Samples Rinse Number or Number or Disposal Cost for Cost Samples Cost Containers/Gallons/Po Trucks/Rail Cost 9Tons or Waste Required Required undss.,.,.e El I IO s 8.690 3 $ l.653 1048 'E2 110 $ 8.690 2 $ 1.102 1536 E3 110 s 8.690 2 $ 1.102 2930 l'E4 93 $ 7.347 2 $ 1.102 1704 ES 110 s 8.690 3 s 1.653 1160 E6 110 $ 8.690 2 $ 1.102 2096 E7 110 $ 8.690 2 $ 1.102 2792 EB 330 $ 26.070 4 s 2.204 2304 Buildino 68 3 s 237 2 ~ 1.102 56 Bu ~dino 69 2 s 158 2 s l .!02 56 BuildinP 70 East/West 3 $ 237 2 $ 1.102 64 Bulld ine 71 Ell!t/Wesl 3 $ 237 2 $ 1.102 64 Breezev.-·nv 65 $ 5.135 3 $ 1.653 256 Stut:d Tower Stom!lC Arc:i/Con\·C\·or 30 $ 2.370 8 $ 4.408 144 El Dock 13 .s 1.027 2 $ 1.102 168 ES Dock 13 $ 1.027 2 s 1.102 168 ES Dock 38 s 3.002 2 $ 1.102 420 Drum PumDil\l! Sto, .... # I 0 s 0 $ 12 D ru m Pumnmg Sloraee #2 0 5 0 $ . 12 c,linde.r S1orl!l!e Area 0 s 0 $ 213 Drum Pumoine Stalion # I I s 79 2 s 1.102 4 Drum Pum pi ne SLali on #2 I $ 79 2 s U02 7.2 7 Laboralnrv Cooler I s 79 2 s 1.102 2 Dru'e Throueh Direct Bum..Slalioob 5 s 395 2 s 1.102 7500 Drive Through Couosi~e Dire.ct Bum SJali.on6 5 .s 395 2 s l.l.02 7500 Truck Unloadin l 39 s 3.081 5 s 2 .755 22920 Bulk Solids Pad' 3IO $ 24.490 3 s 1.653 23760 ATF Ma~ines ( 1 each) II $ 869 4 $ 2.204 90000 Subtotal 1626 s 128,454 67 $ 36,917 17216 So/o Contineency for Sampling 1708 s 134,9)2 71 S 39,121 Notes 1See Oecon Summary and Transportation :ind Disposal ofDecon Fluid Tables for information on how those values were calculated 2E2 includes 4 containers for WS 1, WS2. WS3 3E4 includes 4 containers for repack and decant Cars/Flat Cars Waste s 498.848 $ 731.136 s 1.394.680 $ 811.104 $ 552.1(.0 s 997.696 s 1.328.992 s 1.096.704 s 26.(,56 $ 26.656 s 30.464 216 $ 1,056,515 $ 30.464 $ l2L856 $ 68.544 $ 79.96R s 79.968 $ 199.920 $ 5.712 $ 5.712 s IOl.388 s 1.904 s 3.462 s 952 2 $ 14,820 159 $ 200,340 3 $ 29.469 155 $ 108 .500 3 $ 38.400 45 $ 765.000 224 s 1,139,204 359 s 9,268,786 4PCB wipes "ill only be used to determine PCB decontan'Una1 ion and rinse water samples to ,•erify RCRA decon1amina1ion No PCB samples needed for cylinder storage area since no PCBS would ha-.·e been stored lhere, There are no PCB samples for lhe Slag Pad and Orum Pumping areas since lhis is portable containmenL Added a 5% conlingency to sample amounts lo accounl for cosl of polenlial samples al other areas of the facility or resampling. 5Ma.,imum number of con1ainers allowed lo be slored in storage area Number of trailers calculated by assuming capacity of trailer is 80 containers Assuming il ,vould be destroyed at the Clean Harbors Deer Park faci liLy. 6Tankers and containers are stored in these areas , Used lhe highest amount of gallons that can be stored in lhat area Assuming it would be disposed of as bulk liquid in a rai l car. A rail car can hold 20,000 gallons. Assumed it is being destroyed at the Clean Harbors Deer Park facility 1Containers, roll offs and tankers can be slored in this area Used the highest amount of gallons that can be slored in this area Assuming waste wou ld be disposed of as bulk solids in roll~ffs (12 tons each) which would be carried by nat car (6 roll~orrs per flat car) Assumed it is being destroyed at the Clean Harbors Deer Park facility. 8Maximum ATF Magazines wa.o;le storage capacity is by lhe pound. Jt is assumed that 30,000 pounds of explosives can fit on one trailer. Assumed it is being destroyed at the Clean Harbors Coif a....: foci lity. 9Waste Disposal calculations for lhe Drive through Direct Bum Stati~ Drive Through Corrosive Direct Bum Station, Truck Unloading, Bulk Solids Pad , and ATF Magazines requires a conversion to tons 10 E\'ery calculation is rounded up to its nearest whole vaJue. Anachment 7 --Closure Plan Appendix 1 --Section 1H Clean Harbors Aragonite, LLC Page I Draft UTD98 l 552177 Tank Farm Activity Summary Totals Removal ofW•ste $ 14,393 1 Decontamination $ 290.683 'Transportation and Disposal of $ 82,929 Decon Fluid SamoJing and Analvsis $ 23.421 Transportation of Waste in $ 237,082 Storage Treatment and Disposal $ 669,100 Entered in values Atlivil\• Removal of Waste 'Samnlin" and Anal¥Sis TrAnsnorrntion or Wa ste in Stora~e Tank Farm Area I 'PCB 5Rinse 'Number of 'Number of Rail 'Tank 'Capacity Mandays lo Cost of Equipment Cost Cost Number of Cost Cost Number of Number of I Cost Remove Manpower Cost Samples Samples Containers Trucks Cars for Bulk Tanks Scrap Roll off Boxes Required Required Liquid Waste (Tons) Tank farm I 599956 26 $ 7,696 $ 6.697 142 $ 11.218 20 $ 11,020 34 I $ 4.892 30 $ 222,300 16 160 14 Is 9.890 Subtotal I 599956 26 $ 7,696 $ 6,697 142 $ 11,218 20 $ 11,020 34 I $ 4,892 30 $ 222,300 16 160 14 Is 9,890 5% Contingency for Sampling 150 $ 11,850 21 $ 11,571 10Tank Farm 'Treatment and Disposal Capacity (Gals) Tons Cost Aaueous Waste 149.182 623 $ 311.500 High BTU Waste 450.774 1880 $ 338.400 Scrap Metal . 160 $ 19.200 Subtotal $ 669.100 Notes 'See Decon Summacy and Transportarion and Disposal ofDecon Fluid Tables for infonnarion on how those values were calculated. 2Tanks and piping will be emptied, flushed, then rinsed prior to dismantling. Tanks and piping will then be cut up for disposal as RCRA waste, Volume of waste based on tank volumes and pipe system lineal footage. 3PCB wipes will only be used to determine PCB decontamination and rinse water samples to verify RCRA decontamination . Added a 5% contingency to sample amounts to account for cost of potential samples at other areas of the facility or resampling, 'The tank farm is comprised of four identical containment areas, and two pump houses. These unit containment areas will be sampled individually: 25 per containment area, lO per pump house, 10 miscellaneous structural steel, 12 miscellaneous piping, strainer, pump samples, 'The tank fann is comprised of four identical containment areas, and two pump houses, These unit containment areas will be sampled individually: 4 per containment area and 2 per pwnp house. 611 is expected that approximately 34 drums of waste from the tank farm will be removed. A trailer can transport 80 containers so this could fit on one trailer. 730% added to tank farm capacity to account for flush to remove PCBs. 3 flushes of l0% by volume assumed. 'Assumed tanks would consist of l0,000 lbs. of metal scrap. Also assumed that scrap from pipe, pumps and strainers would equal the amount of the tank (10,000 lbs.) so the amount was doubled. Scrap metal will be disposed of by roll-off (12 tons per roll off) at Clean Harbors Grassy Mountain. 'Bulk liquids from the tank farm would be transported via rail to Clean Harbors Deer Park for Disposal. It is assumed that a rail car capacity would be 20,000 gallons. '0 Aqueous Waste Tank capacity is 114,755 gallons and High BTU Waste is 346,749 gallons. 30% added to account for flush amounts. 11 Evecy calculation is rounded up to its nearest whole value , Attachment 7 •· Closure Plan Appendix I •· Section Ill Clean Harbors Aragonite, LLC Page 2 Draft UTD98!552177 Bulk Solids Activity Summary Totals flemov al of Waste $ 7,741 1O.econtamin.ation $ 125.5(i8 1Transportation and Disposal ofDecon $ 80,882 Fluid Samol irn, and Analvsis $ 33 ,825 Transoortation of Waste in Stora2e $ 206.283 Treatment and Disposal $ 1.043 ,000 Entered in values Aclivitv Removal orWaste 3·"Sampling and Analysis 5.6Transportation or Waste in Storage Treatment and Disposal Bulk Solids Tanks 'Capacity Mandays to Cost or E:quipment PCB Samples Cost Remove Manpower Cost Required Bulk Solids Tanks 229,000 20 $ 5,920 $ 1.821 65 $ 5.135 Subtotal 229000 20 $ 5,920 $ 1,821 65 $ S,13S 5% Contingencv for Samplim! 69 $ 5,451 Notes 1See Decon Summary and Transportation and Disposal ofDecon Fluid Tables for information on how those values were calculated 2Volumes ofwase in inventory based on permitted bulk tank capacity of229,000 gallons , Rinse Samples Required 7 8 9 Concrete Amount Cost Samples Cost Amount Number or Number of Cost of Waste required (Tons) Roll-Offs Flat Cars (Tons) $ 3.857 100 $ 22.300 1490 125 21 $ 206.283 1,490 $ 3,857 100 $ 22,300 1490 12S 21 $ 206,283 1,490 $ 4,959 105 .S 23,415 3PCB wipes will only be used to detennine PCB decontamination and rinse water samples to verify RCRA deco ntamination Added a 5% contingency to sample amounts to account for cost of potential samples at other areas of the facility or resampling 4 15 PCB samples per tank (4 tanks) and 5 PCB samples from containment/vault, 1 rinse sample per tank and 3 rinse samples from the containment/vault, and 20 concrete samples per wall and concrete 20 samples from various floor surfaces , 5Waste from bulks solids tanks will be transferred to roll-offs which will then be transported to Clean Harbors Deer Park by rail flat car for disposaL 6Waste removed from the tanks would be placed in roll-offs ( 12 tons each) which would be shipped by flat car (6 roll-offs per flat car) Ass umed it is be ing destroyed at the Clean Harbors Deer Park facility , 7Every calculation is rounded up to its nearest whole value_ Attachment 7 -Closure Plan Appendix l --Section 111 Clean Harbors Aragonite, LLC Page 3 $ $ Cost 1,043,000 1,043,000 Draft U1D98!552177 Sludge Tanks Activitv Summary Totals Removal of Waste $ I !,I 13 'Decontamination $ 64.267 'Transportation and Disposal ofDecon $ 42,063 Fluid SamnlinQ and Analvsis $ 5.283 Transoortation of Waste in StoraJre $ 14 ,820 Treatment and Disposal $ 225,900 Entered in values Ac ti vi ty Removal of Waste '"Sampling and Analvsis 5Transnortation of Waste in Storage Treatment and Disnosal Sludge Tanks Area Mandays to Cost of Equipment PCB Samples Rinse Amount Number or Rail 6Amount of 2Capacity Remove Manpower Cost Required Cost Samples Cost (Gallons) Cars for Bulk Cost Waste Cost Required Sludee Waste /Tons) •Sludge Tanks 38570 30 $ 8,880 $ 2.233 30 $ 2.370 4 $ 2,204 38570 2 $ 14 .820 251 $ 225 ,900 Subtotal 38570 30 $ 8,880 $ 2,233 30 $ 2,370 4 $ 2,204 38570 2 $ 14,820 251 $ 225,900 5% Contin!!encv for Samnline 32. $ 2,528 5 $ 2,755 Notes 1See Decon Summary and Transportation and Disposal ofDecon Fluid Tables for information on how those values were calculated. 2Volumes of waste in inventory based on permitted sludge tank system capacity of38,570 gallons. 3PCB wipes will only be used to determine PCB decontamination and rinse water samples to verify RCRA decontamination. Added a 5% contingency to sample amounts to account for cost of potential samples at other areas of the facility or resampling. 4PCB Samples: 5 on tanks, 20 on containment vault, 5 on ancillary equipment. Rinse Samples: 2 from tank system and 2 from vault area· 5S ludge from the sludge tanks would be transported via rail to Clean Harbors Deer Park for disposal. It is assumed that a rail car capacity would be 20,000 gallons. 6Used bulk solids density to be conservative. 7Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix I --Section III Clean Harbors Aragonite, LLC Page4 Draft UTD981552177 Kiln Activity Summary Totals Removal of Waste $ 140.351 1Decontamination $ 537,863 1Tra nsnortation and Di s~I ofDecon Fluid $ 228.928 Samolino and Analvsis $ 232.563 Transnortation of Waste in Storaize $ 198.059 Treatment and Disposal $ 463 .800 Entered in va lues Arli,•ilv Removal or Waste Transportation or Waste in Stora~e Treatment and Disposal Type of Material Amount of Waste Mandays to Cost of Equipment Number of Rail Cars or Number of Flat Cost Amount of Cost (gallons and tons) Remove Manpower Cost Roll OITs Cars Waste (Tons) 'Scrubber Liauid 56 ,000 30 $ 8,880 $ 1,904 3 . $ 22 ,230 234 $ 117.000 's1"" 2,016 168 0 $ 118.676 2.016 $ 241.920 JBricks 324 27 0 $ 19.073 324 $ 38.880 ~Baghouse and spray drier 108 302 $ 89,392 $ 40,175 9 0 $ 6,358 l08 $ 12.960 'Shred Tower Clean Out 12 1 I $ 9,823 12 $ 8.400 Ash 372 31 0 $ 21.899 372 $ 44,640 Subtotal . 332 $ 98,272 $ 42,079 239 1 $ 198,059 3,066 $ 463,800 Activitv !Samr linP and Anal sis Kiln area Rinse Non-aqueous Samples PCB Samples Cost Samples Cost (Concrete Cores and Brick Cost Required R11>4"1uired Samnle.s\_ Kiln and AR:erbumer feed skids. slau dischara:e. "A" Damner 4 $ 3L6 s $ 4,408 0 $ . 8 Kiln Area Unli. 208 $ 16.432 16 $ 8,8 16 0 $ . 6 Kiln Area Containments 126 $ 9.954 13 $ 7,163 0 $ . Random Structural Wi □es in Kiln Area 41 $ 3,239 0 $ . 0 $ Random Structural Wines in Shred Tower Area 134 $ 10.586 0 $ 0 $ Two Knmar Shredder,; 7 $ 553 4 $ 2,204 0 $ . Shred Tower Airlock 3 $ 237 2 $ 1.102 0 $ - Shred Tower Feed Auour 7 $ 553 2 $ 1.102 0 $ . Bricks from kiln and "A' Damcer 0 $ 0 $ -200 $ 44.600 Bricks rrom SCC 0 $ 0 $ . 150 $ 33.450 beslaooer 19 $ I.SOI 2 $ 1.102 20 $ 4.460 5 Pant Leg Sections 74 $ 5,846 IO $ 5.510 100 $ 22.300 Scrav Drver 45 $ 3.555 2 $ 1.102 80 $ 17.840 Accumulation Areas 0 $ 0 $ -20 $ 4.460 Parki n• Lot 0 $ -0 $ . 20 $ 4.460 Kiln Arca 0 $ 0 $ -10 $ 2.230 Shred Tower Area 0 $ -0 $ 10 $ 2,230 Subtotal 668 $ 52.772 59 $ 32.509 610 $ 136.030 5% Contin2enC'V (or Samoline 702 $ 55.458 62 $ 34,162 641 $ 142.943 Notes 1See Decon Summary and Transportation and Disposal ofDecon Fluid Tables for information on how those values were calculated . 2Scrubber has 4 tanks at 14,000 gallons each , Amount is in gallons This will be transported by rail to Clean Harbors Deer Park for Disposa l. Considered it to be bulk aqueous waste 'Non-liquid wastes excluding shred tower: 168 boxes of slag 20 yd 3 each, 27 boxes of brick 20 yd' each, 31 boxes of ash at 20 yd 3 each, and 9 boxes of baghouse/spray dryer cleanout at 20 yd 3 each , These will be disposed of at Clean Harbors Grassy Mountain. 4 1 box from shred tower cleanout 20 yd 3 This will be transported by rail and be disposed ofat Clean Harbors Deer Park 5PCB wipes will only be used to determine PCB decontami nation and rinse water samples to verify RCRA decontamination. Added a 5% contingency to sample amounts to account for cost of potential samples at other areas of the facility or resampling. 6Every ca lculation is rounded up to its nearest whole value . Attachment 7 -Closure Plan Appendix 1 --Section Ill Clean Harbors Aragonite, LLC Page 5 Draft UTD98 I 552177 Section IV Transportation and Disposal of Decontamination Fluid Transportation and Disposal of Decontamination Fluid 1Total 1 Gal of JNumberof Transportation Area ~Cost of Disposal Area (ft1) Decon Rail Cars Cost Container Storage 143 ,471 143471 8 $ 59,280 $ 299,138 "Tank Farm 18900 28900 2 $ 14,820 $ 60,257 Bulk Solids -30,000 2 $ 14.820 $ 62,550 Slud11.e Tanks -16000 I $ 7,410 $ 33 ,360 Kiln -87148 5 $ 37,050 $ 181,704 Notes 1Rinsate generation is expected to be approximately 1.0 gallon per square foot of unit surface area. 2Rinsate generation is assumed rather then being calculated from surface area . 3Transported by rail car to Clean Harbors Deer Park for Disposal. 4Asssumed the cost would be similar to bulk aqueous waste disposal at Clean Harbors Deer Park. 5Frac tanks will be used to temporarily store the liquids generated during decontamination efforts . "Tank farm includes an extra 10,000 gallons of rinse water. 7Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix I --Section IV Clean Harbors Aragonite, LLC 5Numberof Frac Tanks 4 3 2 I 4 Page I Entered in values Number of FracTank Number of Man Rental Cost Pays to Pump to Months Total FracTank 2 $ 8,680 II 2 $ 6.510 4 1 $ 2.1 70 4 0.5 $ 543 2 2 $ 8,680 4 Cost of Cost to Pump Fluid to Frac Equipment Tanks $ 316 $ 3.572 $ 158 $ 1,342 $ 158 $ 1,342 $ 158 $ 750 $ 310 $ 1,494 Total $ 370,670 $ 82.929 $ 80,882 $ 42 ,063 $ 228,928 Draft UTD981552177 Section V Decontamination Costs / Decontamination Cost Summary Item Description Item Quantity Rate Extension Labor 1286 $ 296 $ 380,656 Equipment and Supplies --$ 530,107 Project Overhead --$ 241,036 Mobilization 1 $ 44,357 $ 44,357 Demobilization 1 $ 14,786 $ 14,786 Subtotal $ 1,210,942 Contingency 5% $ 60,548 $ 1,271,490 1Decontamination Cost Per Area Area Ratio Cost Container Storage 20% $ 253,112 Tank Farm 23% $ 290,683 Bulk Solids 10% $ 125,568 Sludge Tanks 5% $ 64,267 Kiln 42% $ 537,863 Total $ 1,271,493 Notes 1Deconamtion cost per area is calculated by multiplying the overall total decontamination cost by the ratio of mandays for this task. 2Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix I --Section V Clean Harbors Aragonite, LLC Page 1 Draft UTD981552177 Decon Task Duration Decontamination Task Duration Summary Area Mandays Container Storage 256 Tank Farm 294 Bulk Solids 127 Sludge Tanks 65 Kiln 544 Total 1286 Container Storage Area Sub Area Container Storage Drum Storage Buildings and Buildings 68 , 69, 70-East/West, 71- East/West Container Processing Areas Dock/Breezeway Shred Tower Storage Area A TF Explosive Magazine Storage Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Ratio 20% 23% 10% 5% 42% Entered in values Task Description Dismantle drum storage racks Wash ceilings (concrete) Wash walls (concrete) Wash front loadings bays Wash interior storage cells/secondary containment Sample Remove area equipment Wash ceilings Wash walls Wash floor Decon/Dismantle Drum Pump Stations Dismantle, wash decant area Sample Remove elevator/rollers Lower level hoist decontamination Sump cleanout Dock wash Breezeway wash Electrical isolation of conveyors Ceiling wash Miscellaneous demolition Sample Dismantle drum storage racks Containment bin cleanout Wash concrete under storage rack locations Sample Wash ceilings Wash walls Sample Total Page 2 Mandaysfl'asks 12 34 44 13 33 12 5 8 12 8 2 12 4 10 8 2 10 6 1 6 3 2 2 2 1 1 1 1 1 256 Draft UTD981552177 Tank Farm Area Sub Area Tank Farm Sample Station Unload Building Waste Tanks Pump Houses (2) Blend Tanks Carbon Adsorber Direct Bum Area Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Task Description Wash structure Triple rinse pumps, piping Isolate, pull pumps Isolate, pull piping Clean containment Sample Triple rinse tanks, piping Isolate piping Pull piping Purge Tanks Muck out interior Remove exterior structural Remove tanks Cut-up tanks for disposal Clean containment Triple rinse pumps, piping Isolate, pull pumps Isolate, pull piping Clean containment Sample Triple rinse tanks, piping Isolate, purge Isolate, remove pumps Remove piping Muck out interior Remove mixers (sectioned) Top valves and piping Remove exterior structural Pull tanks Cut-up tanks for disposal Remove unload rack piping Containment Purge, pull O/H lines to incin feed rack Remove packing for disposal Remove tanks, piping for disposal Sample Purge piping, pull Clean containment Pull unloading pipes Pull pumps Wash bay Sample Total Page 3 Mandays/Tasks 3 3 4 6 4 2 6 3 2 8 40 20 8 45 9 4 10 12 10 2 3 5 2 3 8 4 2 6 4 10 2 3 7 6 8 2 4 4 2 2 4 2 294 Draft UTD981552177 Bulk Solids Area Sub Area Bulk Solids Bulk Solids Building Shredder Area Drag Conveyor Sludge Tanks Area Sub Area Sludge Tank -Small Sludge Tanks Sludge Tank -Large Kiln Area Sub Area Incineration Train Deslagger Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Task Description rinse down ceiling, upper walls Clean walls Clean tanks Sample Clean hopper, shelf disassemble, clean shredder sample Disassemble conveyor Clean conveyor interior Clean hopper, knife gates Sample Clean hpu mains Pull small lines Drain hpus, isolate Isolate electrical Task Description Triple rinse Muck out interior Remove valves and piping Wash tank exteriors Pull tank Cut-up tank Sample Triple rinse Muck out interior Wash Interior Remove valves and piping Wash tank exteriors Pull tank Cut-up tank Sample Task Description Pull out Isolate, disconnect Open housing, pull headgear Pull head pulley Pull belt, dispose Cut-up shell for disposal Gross area decontamination Page4 Total Total Mandays/Tasks 10 28 35 8 8 8 2 6 6 6 2 2 2 2 2 127 Man days/Tasks 2 6 2 4 4 6 2 3 6 6 4 4 4 10 2 65 Mandays/Tasks 2 4 4 4 3 20 4 Draft UTD981552177 Kiln Exterior Kiln Interior sec Kiln Feed Piping Ducting from SCC to Saturator Saturator Scrubber Spray Dryer Baghouse Baghouse Residue Loadout Building Attachment 7 --Closure Plan Appendix 1 --Section V Surrounding sump area decontamination Sample Clean exterior kiln drive Clean ring gear Clean from discharge to deslagger Remove piping Pull Kiln face feed points Remove brick, containerize Clean interior sample Clean area exterior Remove feed piping Remove burners Remove SCC exterior sheathing Push in SCC brick Muck out brick into rolloffs Clean structure Sample Isolate, purge Pull, cut piping Cut refractory to release joints Crane out ducts, including thermal vent Remove duct refractory Wash duct to scrap Sample Pull packing, containerize Pump solids, muck out bottom Scaffold interior Sample Pull packing, muck out bottom Scaffold interior Clean interior Sample Remove residue Isolate, remove , piping Remove, clean ducting Clean discharge area Sample Clean inlet, outlet duct Remove bags, cages Clean/remove screw conveyors Clean interior Sample Clean conveyors Clean loadout hoppers Clean building structure Clean containment Clean Harbors Aragonite , LLC Page 5 4 2 2 2 2 16 6 35 8 2 2 6 15 20 35 20 8 2 2 10 8 4 20 4 4 2 4 4 2 8 4 10 2 6 6 10 4 2 6 8 12 10 2 8 4 6 6 Draft UTD981552177 ESP ID Fans, Stack Inlet Ducting Stack pH Adjustment Tanks Shred Tower Area Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Sample Clean inlet, discharge ducting Clean interior Sample Clean ID #1 fan inlet Clean transition to ID fan #2 Clean fan #2. outlet to stack Clean bottom section of stack Check condition of interior De-erect Clean interior Sample Isolate, drain Clean, rinse Remove piping, pumps Remove elevator towers Hoist decontamination Wash structure Sump cleanout Electrical isolation of conveyors Sample Clean concrete pad Miscellaneous demolition Purge piping and pull Wash airlock structure Disassemble, clean shredder, upper Disassemble, clean shredder, lower Dissemble conveyor Clean isolation gates Sample Clean hpu mains Pull small lines Drain hpus, isolate Isolate electrical Dismantle, wash feed auger Total Page 6 2 4 6 2 2 2 2 2 1 2 2 1 2 4 2 10 8 3 2 2 2 8 3 4 8 8 8 6 6 4 2 2 2 2 12 544 Draft UTD981552177 Decontamination Equipment and Supplies Entered in values Unit Unit Qty Item Description General Equipment Week 21 Pressure Washers w/Trailers Week 21 Sand Blasting Week 21 High Reach Fork Lift Week 21 Fork Lifts (5 ,000 lbs.) Week 21 Shooting Boom Lift Month 3 Vactor Truck (up to 176 hrs .Imo) Week 12 Vacuum Boxes Hour 220 50-Ton Crane w/operator Hour 220 I 00-Ton Crane w/operator Week 20 Welding/Cutting and Supplies Week 20 Trailers for Transporting Week 21 Storage Trailers for Equipment on-site Month 4 Hydroblaster, 30,000 psi LS 1 Mob, Demob, Permits and Misc . Expenses Week 21 Air Compressors Week 21 Trucks Week 12 Koppus Blowers Week 21 Scaffolding Supplies Manday 1 PPE Drums 25 Drums of Detergent Week 20 Small Tools Week 21 Sampling Supplies Bag I Bag Grit for Sand Blasting Roll 1 Absorbent Mats Roll 1 Plastic Case I Duct Tape Each 1 Drums Roll 1 Drum Liner Notes 1Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Page 7 Item Qty Rate 5 $ 563.00 2 $ 622.00 1 $ 1,361.00 2 $ 326.00 I $ 1,590.00 1 $ 11,829.00 2 $ 554.00 1 $ 89.00 I $ 133.00 2 $ 260 .00 I $ 89.00 2 $ 82.00 1 $ 14,786.00 1 $ 2,957.00 2 $ 451.00 2 $ 408.00 2 $ 89.00 1 $ 222.00 1,833 $ 30.00 1 $ 740.00 1 $ 296.00 1 $ 185.00 710 $ 12.00 54 $ 163.00 264 $ 89.00 30 $ 185.00 330 $ 44.00 66 $ 103.00 Total Extension $ 59 ,115 .00 $ 26 ,124.00 $ 28,581.00 $ 13 ,692 .00 $ 33,390 .00 $ 35,487.00 $ 13,296 .00 $ 19 ,580.00 $ 29 ,260.00 $ 10 ,400.00 $ 1,780.00 $ 3,444.00 $ 59 ,144 .00 $ 2,957 .00 $ 18,942.00 $ 17,136 .00 $ 2,136 .00 $ 4,662.00 $ 54,990 .00 $ 18,500.00 $ 5,920.00 $ 3,885.00 $ 8,520.00 $ 8,802.00 $ 23 ,496 .00 $ 5,550.00 $ 14,520.00 $ 6,798 .00 $ 530 ,107 .00 Draft UTD981552177 Decontamination Project Administration Entered in values Unit Unit Qty Item Description Item Qty Project Management Personnel Hourly 700 Project Manager 1 Hourly 900 Field Supervisor 1 Hourly 900 Quality Assurance Officer 1 Hourly 500 Clerical l Administrative Equipment/Supplies Month 6 Project Office Month 6 Fax Copier Month 6 Phone Week 18 Postage Month 6 Utilities Month 6 Supplies Month 6 Cleaning and Disposal Day 80 PPE for Administrative Personnel Week 18 Administrative Truck Incidental Costs Each 1 Travel Day 80 Subsistence Notes 1Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix 1 --Section V Clean Harbors Aragonite, LLC Page 8 1 l 1 1 2 1 1 2 1 20 4 Rate $ 96.00 $ 48.00 $ 44.00 $ 23.00 $ 1,183.00 $ 370.00 $ 296.00 $ 44.00 $ 148.00 $ 370.00 $ 370.00 $ 30.00 $ 333.00 $ 740.00 $ 112.00 Total Extension $ 67 ,200.00 $ 43,200.00 $ 39,600.00 $ 11,500.00 $ 7,098.00 $ 2,220.00 $ 1,776.00 $ 792.00 $ 1,776.00 $ 2,220.00 $ 2,220.00 $ 4,800.00 $ 5,994.00 $ 14 ,800.00 $ 35,840.00 $ 241,036.00 Draft UTD981552177 Section VI Certification of Closure Certification of Closure Entered in values Area Engineering Engineer Certification hours Cost Container Storage 100 $ 18,500.00 Tank Farm 100 $ 18,500.00 Bulk Solids 60 $ 11,100.00 Sludge Tanks 24 $ 4,440.00 Kiln 96 $ 17,760.00 Notes 1Every calculation is rounded up to its nearest whole value. Attachment 7 --Closure Plan Appendix 1 --Section VI Clean Harbors Aragonite, LLC Page 1 Certification Direct Cost $ 3,500.00 $ 3,500.00 $ 1,500.00 $ 5,500.00 $ 4,000.00 Total $ 22,000.00 $ 22,000.00 $ 12,600.00 $ 9,940.00 $ 21,760.00 Draft UTD981552177 Section VII General Costs and Conversion Factoi Information General Costs and Conversion Factors Information Item PCB Wipe Sample Rinsate Samples Drum Truck Explosive Truck Disposal Rate for Containerized Waste Disposal Rate for Explosives FracTank Engineer Certification Cost of Man Power Rail Tanker (Liquid) Transportation to CH-DE RolloffBox to Grassy Scrap Metal Waste Direct Bum Disposal Cost Bulk Aqueous Disposal Cost Bulk High BTU Disposal Cost Non-Aqueous Samples Rail Bulk Solids Transportation to CH-DE Bulk Solids Disposal Sludge Disposal Solid Residue Disposal Direct Labor Cost Item Drums per truck Explosives per truck Rinsate FracTank Drum Specific Gravity ofBulk Solids Specific Gravity of Bulk Liquids Density of water Work hours a day Tank scrap per tank lbs. to tons Rail Tanker Capacity Flat Car Size Capacity 20 yd" Roll-off Capacity Attachment 7 --Closure Plan Appendix 1 --Section VII Clean Harbors Aragonite, LLC Cost Per Unit $ 79 .00 Sample $ 551.00 Sample $ 4,891.27 per load $ 12,800.00 per load $ 476.00 a container $ 8 .50 pound $ 1,085.00 month $ 185.00 hour $ 37.00 hour $ 7,410.00 a tanker car $ 706.40 a load $ 120 .00 a ton $ 1,260.00 a ton $ 500.00 a ton $ 180.00 a ton $ 223 .00 Sample $ 9,823 .00 I per rail flat car $ 700.00 per ton $ 900.00 per ton $ 120.00 a ton $ 296.00 Manday/task Cost Per Unit 80 drums 30,000 I pounds 1 gal/ft2 20,000 lgallons/Frac Tank 55 I gallons 1.56 specific gravity 1.00 specific gravity 8.34 lbs ./gal 8 hours/day 10 tons 2000 I pounds per ton 20000 1 gal/rail tanker 6 roll-offs/flat car 12 tons/roll-off Page 1 Source and Comments American West 1/3/2022 prices American West 1/3/2022 prices Quote from Clean Harbors Logistics Quote from CH-Colfax Quote from CH (!'SCA waste) Quote from CH-Colfax https ://emcooilfield.com/frac-tank-rental/ ($35 a day, 31 day month) Updated to 2022 wages using inflation factor Updated to 2022 wages using inflation factor Quote from Union Pacific Quote from CH-GM Quote from CH-GM ($0.06 per pound) Quote from CH ($0.63 per pound) - Quote from CH ($0 .25 per pound) Quote from CH ($0.09 per pound) American West 1/3/2022 prices Quote from Union Pacific Quote from CH ($0.35 per pound) Quote from CH ($0.45 per pound) Quote from CH-GM ($0.06 per pound) $37/hr. for an 8 hour day Source and Comments (if needed) From 2021 facility data on bulk solids. Also used as density of containerized waste From 2021 facility data on bulk liquids Includes 10,000 pounds for the tank and 10,000 pounds for the associated piping, pumps, and strainers Average net weight of a roll-off filled with slag Draft UTD981552177 [Je11p~ar~· LWAUA.U.A-..UJLU! Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 Redundant Process Line & Storage Location Lines. Additional Storage Locations North of E-4 Decant (looking South) Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 Additional Storage Locations North of E-4 Decant (looking Southwest) [lejapffar~ J&...LO.lUJWA.U>..W.ZW. Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 Redundant Drum Pump Station Process Line (looking Southwest) [le_aoff~r~~ .urur.u.n.ux..ur.a..zw._ Clean Harbors Aragonite, LLC 11600 North Aptus Road Aragonite, UT 84029 435.884.8100 Redundant Drum Pump Station Process Line (looking Northwest)