HomeMy WebLinkAboutDDW-2025-009967Sanitary Survey - Deficiency Report
PWS Number:UTAH20079 Deficiency Points:380 Survey Date:09/30/2025
Survey Name:PHEASANT RUN
OUTFITTERS
Surveyor:John Chartier
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Management and Operations | DS001 | UTAH20078 DISTRIBUTION SYSTEM
30B. System lacks more than 20% of required storage capacity (fire demand not included)
Rule: R309-510-8(1)(a)Rule requires a public water system to provide equalization storage volume (to meet
average day demands for indoor and irrigation water use), fire flow storage volume (if
equipped with fire hydrants for fire suppression or required by the local fire code
official), and emergency storage (if deemed appropriate by the water system or the
Director). This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:This system only has 2 hydropneumatic tanks, which I estimated to have 50 gallons each of
effective volume. The source capacity should allow for a storage tank exception for this
transient water system.
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V034 SYSTEM LACKS MORE THAN 20% OF REQUIRED STORAGE CAPACITY (FIRE
DEMAND NOT INCLUDED)
Sanitary Survey Category: SM
SDWIS Severity Code: Recommendation
Management and Operations | DS001 | UTAH20078 DISTRIBUTION SYSTEM
31. Does your water system have an Emergency Response Plan?
Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency
situations. In many areas of the state the possibility of earthquake damage shall be
realistically considered.
Notes:
Deficiency Points: 0
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH20078 DISTRIBUTION SYSTEM
36. Legally adopted authority statement
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes a legally adopted and functional local authority to enforce the program
(i.e., ordinance, bylaw, or policy).
Notes:Not available.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH20078 DISTRIBUTION SYSTEM
37. Documentation of annual public awareness and/or employee training
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes providing public education or awareness material or presentations.
Notes:Not available.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH20078 DISTRIBUTION SYSTEM
38. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/
GREATER CCC TRAINING)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes an operator with adequate training in the area of cross connection control
or backflow prevention.
Notes:Not available.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH20078 DISTRIBUTION SYSTEM
39. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:Not available.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH20078 DISTRIBUTION SYSTEM
40. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:Not available.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Wells | WS001 | EAGLE EYE WELL
57. Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY
MARK "DEFICIENT")
Rule: R309-515-6(5), R309-515-7(4), R309-500-
9(2) and (3)
R309-105-6(1) requires plans and specifications for all public drinking water projects
to be approved in writing by the Director prior to the commencement of construction.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
Notes:Deficient according to the quoted Rules, but not deficient for the way the question is worded.
Deficiency Points: 200
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S001 UNAPPROVED SOURCE IN SERVICE
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Wells | WS001 | EAGLE EYE WELL
58. Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor.
Rule: R309-515-6(6)(b)(vi), R309-515-
6(12)(c)(ii), R309-515-6(13)(a)
Rule requires the permanent well casing to project at least 18 inches above the final
ground surface and 12 inches above the pump house floor; at sites subject to flooding,
the top of the casing must terminate at least 3 feet above the 100-year flood level or
highest known flood elevation, whichever is higher. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:Well casing is only approximately 8-inches above finished ground surface.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S003 WELL CASING TERMINATES LESS THAN 12 INCHES ABOVE FLOOR OR LESS
THAN 18 INCHES ABOVE GROUND SURFACE
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
62. Water level is measured and recorded periodically
Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the
completed well.
Notes:No records of water level.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
68. Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the
wellhead).
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a
check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth
nosed sampling tap being the first item from the well head and the shut-off valve as the
last item)
Notes:No sample tap.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S023 NO SMOOTH NOSED SAMPLING TAP ON DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
69. Well discharge line has a check valve.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:No check valve in well discharge piping.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S024 NO CHECK VALVE ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
71. Well discharge line has a means to measure flow.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:No flow meter
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S026 NO FLOW METER ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
72. Well discharge line has a shut-off valve (last item from the well head).
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:Not that I could see.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S027 NO SHUT OFF VALVE ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | EAGLE EYE WELL
74. Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps
directly to a tank, has an air release valve or pump to waste line)
Rule: R309-515-6(12)(d)(v)Rule requires a well that pumps directly into the distribution system be equipped with
an air release/vacuum relief valve located upstream of the check valve, unless the
wellhead valve and piping provide for pumping to waste all trapped air before water is
introduced into the distribution system.
Notes:Pumps directly to a tank, but it is a hydropneumatic tank that does not vent air.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SL01 WELL THAT PUMPS DIRECTLY TO DISTRIBUTION LACKS A MEANS TO RELEASE
TRAPPED AIR