Loading...
HomeMy WebLinkAboutDERR-2025-007507 www.rbwhitepe.com October 2, 2025 Gary Crocker Silver Reef Investment Holdings, LLC 2825 East Cottonwood Parkway Suite 330 Salt Lake City, UT 84121 Subject: Annual Inspection of The Cove at Silver Reef Dear Gary: I conducted the annual inspection of The Cove at Silver Reef (formerly known as the Silver Pointe Voluntary Cleanup Program site) on September 23, 2025. Dave Bird from the Utah Division of Environmental Response and Remediation accompanied me on the inspection. I have copied him on this report. A copy of the completed inspection form is included as Attachment A. Photographs taken during the inspection are provided in Attachment B. My basic findings are summarized below: • Soil Repository – One shrub with probable deep roots (species unknown) was growing on the surface of the repository. This shrub was approximately 4 feet tall, with a 1-inch diameter stem at its base. I cut this shrub at its base and sprayed with resulting stump with commercially- available brush killers containing Triclopyr triethylene salt and Pelargonic acid. The remaining shrubs and grasses on the site have shallow rooting depths of 3 to 4 inches maximum, as evidenced by prior inspections, and are therefore not a concern. • Large Headframe – The chain-link material comprising the fence around the large headframe was in good condition. I also cut five small greasewood bushes that were growing inside the large headframe fence. In each case, the growth originated from locations that I cut last year. I sprayed the stumps with the same brush killers noted above within a few minutes of cutting to discourage regrowth of the bushes. • Small Headframe –I noted no issues of concern at the small headframe. The riprap to the stream-side face of the adjacent road was in good condition and appeared to be adequately protecting that area from erosion. • General Site Conditions – The site appeared to be generally in good condition. Areas where the Site Management Plan calls for 6 inches of soil cover to be maintained remain in good condition. The sign on the adit grate in the northeast area of the property was missing. A new sign was installed in its place on September 26, 2025. Richard B. White, PE, PLLC 13441 South Lone Peak Lane  Draper, Utah 84020  801-673-6647 Gary Crocker October 2, 2025 Page 2 Please feel free to contact me if you have any questions. Sincerely, Richard B. White, P.E. Consulting Civil and Environmental Engineer Attachments cc: Dave Bird (UDERR) ATTACHMENT A Site Inspection Form ATTACHMENT B Site Inspection Photographs Photo 1 – View to the north from the northern third of the soil repository. Photo 2 – View to the south from the northern third of the soil repository. Photo 3 – View to the northwest across the surface of the large headframe. Photo 4 – View to the east of the north slope of the large headframe. Photo 5 – View of mine adit with missing caution sign. Photo 6 – Newly-installed caution sign at mine adit. Photo 7 – Gravel cover on slope at top of Big Hill. Photo 8 – Gravel cover on roadway to top of Big Hill. Photo 9 – Gravel cover on slope near mine adit. Photo 10 – Gravel cover on slope at east end of Big Hill.