Loading...
HomeMy WebLinkAboutDDW-2025-009600Sanitary Survey - Deficiency Report PWS Number:UTAH16012 Deficiency Points:80 Survey Date:09/09/2025 Survey Name:OTTER CREEK RV PARK Surveyor:Peter Keers Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH16012 DISTRIBUTION SYSTEM 36. Legally adopted authority statement Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). Notes:Paige did not have PWS book available, medical issue restricting activity. Call me and we can resolve this C3 deficiencies! Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH16012 DISTRIBUTION SYSTEM 37. Documentation of annual public awareness and/or employee training Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. Notes:Paige did not have PWS book available, medical issue restricting activity. Call me and we can resolve this C3 deficiencies! Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH16012 DISTRIBUTION SYSTEM 38. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. Notes:Paige did not have PWS book available, medical issue restricting activity. Call me and we can resolve this C3 deficiencies! Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH16012 DISTRIBUTION SYSTEM 39. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. Notes:Paige did not have PWS book available, medical issue restricting activity. Call me and we can resolve this C3 deficiencies! Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH16012 DISTRIBUTION SYSTEM 40. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:Paige did not have PWS book available, medical issue restricting activity. Call me and we can resolve this C3 deficiencies! Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS001 | 1987 WELL 71. Well discharge line has a means to measure flow. Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. Notes:could not locate one? Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S026 NO FLOW METER ON WELL DISCHARGE PIPING