HomeMy WebLinkAboutDRC-2017-006426 - 0901a06880747bb3State of Utah
GARY R HERBERT
Governor
SPENCERJ COX
Lieutenant Governor
Department of
Environmental Quality
Alan Matheson
Executive Director
-VFC'Ton-M&b
DIVISION OF WASTE MANAGEMENT
AND RADIATION CONTROL
Scott T Anderson
Director
MEMORANDUM
TO:
THROUGH:
Project File C-2017-17
Russell J. Topham, PE c. /
Phil Goble, Uranium Mill Section Manager
FROM: Heather Mickelson, PE
DATE: August 17,2017
SUBJECT: 2017 Engineering Module 73, Inspection of disposal of 1 le.(2) decommissioning debris
from in situ leach facilities
Authority
Radioactive Materials License #UT1900479, Condition 10.5: “In accordance with the Licensee's
submittal to the NRG dated May 20, 1993, the Licensee is hereby authorized to dispose of byproduct
material generated at licensed in situ leach (ISL) facilities, subject to [...] conditions.” (Conditions are
included below in the Requirements section.)
R313-12-3 (quoting 10 CFR 40.4): “Byproduct Material means the tailings or wastes produced by the
extraction or concentration of uranium or thorium from any ore processed primarily for its source
material content, including discrete surface wastes resulting from uranium solution extraction
processes.”1
10 CFR Part 40 Appendix A, Criterion 2: “To avoid proliferation of small waste disposal sites and
thereby reduce perpetual surveillance obligations, byproduct material from in situ extraction operations,
such as residues from solution evaporation or contaminated control processes, and wastes from small
remote above ground extraction operations must be disposed of at existing large mill tailings disposal
sites; unless, considering the nature of the wastes, such as their volume and specific activity, and the
costs and environmental impacts of transporting the wastes to a large disposal site, such offsite disposal
1 This definition amends the language given in Section 1 le.(2) of the Atomic Energy Act as amended in 1954 to include ISL
facilities on the same footing as conventional uranium mills. This is done by referencing “solution extraction” in the
definition. Text of the Atomic Energy Act as amended in 1954 can be found in NUREG-0980, Volume 1, No. 10.
DRC-20 195 North 1950 West • Salt Lake City, UT
Mailing Address PO Box 144880 • Salt Lake City, UT 84114-4880
Telephone (801) 536-0200 • Fax (801) 536-0222 • T D D (801) 536^284
iuww.deq.utati.gov
Printed on 100% recycled paper
Third Quarter, 2017 ISL Decommissioning Debris Disposal Inspection Report
August 17, 2017
Page 2
is demonstrated to be impracticable or the advantages of onsite burial clearly outweigh the benefits of
reducing the perpetual surveillance obligations.”
Observations
Heather Mickelson, PE of the Utah Division of Waste Management and Radiation Control (the
Di vision), in the company of Russell J. Topham, PE, observed disposal of six loads of 1 le.(2) byproduct
material on August 10, 2017 at the White Mesa Uranium Mill. The mill is owned and operated by
Energy Fuels Resources (the Licensee). Notification of the disposal was sent by the Licensee by email
on July 15,2017.
This inspection was specific to the Licensee’s implementation of Standard Operating Procedure SOP
PBL-10, which governs disposal of 1 le.(2) byproduct material from ISL facilities.
The 1 le.(2) byproduct material for disposal was from four generators. One load was received from
Energy Fuels Resources - Nichols Ranch in Linch Wyoming; two loads from Cameco Resources -
Cameco-Smith Ranch in Douglas Wyoming; two loads from Uranium One Americas -
Irigaray/Christensen Projects in Linch Wyoming; one load came from South Texas Mining Venture LLP
- UEC/La Palanga in Benavides, Texas.
The Licensee maintains a map of Tailings Cell 3 in the mill office that shows the dedicated disposal
location for each 1 le.(2) byproduct material generator. This map was reviewed with the Licensee in the
mill office. The generator disposal areas are marked within the tailing cell.
A photo log is attached and shows disposal activities for each of the waste generators.
Lateral disposal pit locations were determined and located in the field by survey prior to excavation and
prior to DWMRC arrival. The bottom of the excavations extended into the tailings sand, and the depth
was surveyed prior to placement of material into the excavation. Once the 1 le.(2) byproduct material
was placed in the excavation and compressed, the top of the material was surveyed (Photos 2, 5, and 11).
Clean cover was then placed and compacted (Photos 2, 3, 6, 8, 9, and 12). The lateral extent of the
burial is below the top line and above the bottom liner.
The Nichols Ranch 1 le.(2) byproduct material consisted of trash and pipe (Photo 1). The burial pit
liquids splashed to the surface of the cell as the loader and bull dozer were filling and compacting the
burial hole (Photo 3). These liquids made it difficult to completely compact and cover the burial cell
while DWMRC was onsite. The Licensee completely compacted with the cover after it had dried.
Confirmation of this compaction was received on August 16, 2017 in the Nichols Ranch data packet
(See attachment).
The Uranium One 1 le.(2) byproduct material consisted of trash and hoses (Photo 4).
The Cameco-Smith Ranch 1 le.(2) byproduct material was trash and pipe that was received in barrels
(Photo 7). Prior to August 10, 2017, the barrels were opened and the material was removed from the
barrels. Both the barrels and the material contained in the barrels were crushed to allow the clean cover
material to fill the void spaces of the compacted waste (Photo 7).
Third Quarter, 2017 ISL Decommissioning Debris Disposal Inspection Report
August 17, 2017
Page 3
The La Palanga 1 le.(2) byproduct material consisted of pipe, barrels, and trash (Photo 10). Prior to
August 10, 2017, the barrels were crushed to allow the clean cover material to fill the void spaces of the
compacted waste (Photo 11).
Present during a close out meeting to discuss observations during the inspection included Heather
Mickelson and Russ Topham (Division), Logan Shumway (Plant Manager), David Turk (Radiation
Safety Officer), Garrin Palmer, and Tanner Holiday.
Copies of paperwork obtained from field crews show that the Licensee used revision R-3.3 of SOP PBL-
10, dated November 13, 2014 for the operations observed. Revision R-3.3 is the most recent version of
the procedure. A copy of the data packet for each load is attached to this report.
Requirements and Compliance Determination
Radioactive Materials License #UT1900479, Condition 10.5B: “All ISL contaminated equipment shall
be dismantled, crushed, or sectioned to minimize void spaces. Barrels containing waste other than soil or
sludges shall be emptied into the disposal area and the barrels crushed. Barrels containing soil or sludges
shall be verified by the Licensee to be full prior to disposal. Barrels not completely full shall be filled
with tailings or soil prior to disposal.”
The activities observed and information gathered during this inspection supports a conclusion that the
Licensee is complying with this license condition. The 1 le.(2) byproduct material from Cameco-Smith
Ranch and La Palanga load barrels contained trash and pipes and was crushed to minimize void spaces.
Radioactive Materials License #UT1900479, Condition 10.5C: “All ISL waste shall be buried in Cell
No. 3 unless prior written approval is obtained from the Executive Secretary [now Director] for alternate
burial locations.”
The activities observed and information gathered during this inspection supports a conclusion that the
Licensee is complying with this license condition. All 1 le.(2) byproduct material was buried in Tailings
Cell 3.
Radioactive Materials License #UT1900479, Condition 10.5D: “All disposal activities shall be
documented and records thereof maintained on-site. The documentation shall include descriptions of the
ISL waste and the disposal locations, as well as all actions required by this License condition.”
The activities observed and information gathered during this inspection supports a conclusion that the
Licensee is complying with this license condition. The Licensee maintains records of the 1 le.(2)
byproduct material disposed of onsite. These records include document the nature of each load of
material received, where it is buried, and how it was handled, including all measures taken to comply
with all of License Condition 10.5.
Radioactive Materials License #UT1900479, Condition 10.5E: “The Licensee shall also submit for
Executive Secretary [now Director] approval a revised written Standard Operating Procedure (SOP) for
ISL disposal on or before December 1, 2010. The revised SOP shall describe the documentation
required for ISL disposal, which shall include but is not limited to the following:”
Third Quarter, 2017 ISL Decommissioning Debris Disposal Inspection Report
August 17, 2017
Page 4
(1) The material disposal area must be located on a tailings beach area of the disposal cell or on an
area of the cell that is underlain by tailings sands;
(2) The elevation of the material disposal area will not exceed the plane or grade of the elevations of
the uppermost flexible membrane liner of the tailings cell;
(3) Such ISL byproduct material will be segregated from any mill material and equipment disposed
of in the cells pursuant to License Condition 10.4, and the ISL byproduct material from each in
situ leach source will be segregated from the byproduct material from all other in situ leach
sources;
(4) Absence of void space inside barrels disposed, including physical verification before disposal;
and
(5) Detailed engineering drawings which demonstrate:
a. There are at least 4 feet of tailings sands under the bottom of each disposal area; and
b. The bottom of each disposal area is located at least 12 feet from the sides or dikes of the
tailings cell.
The activities observed and information gathered during this inspection supports a conclusion that the
Licensee is complying with this license condition. The Licensee met the requirement to submit the
procedure with the initial version of SOP PBL-10, and now uses Revision R-3.3, dated November 13,
2014. Revision R-3.3 addresses all of the items specified in License Condition 10.5. The original
version and every subsequent revision of this procedure were submitted to the Division for review and
approval prior to implementation.
Further, the Licensee is complying with the SOP, such as segregating generator 1 le.(2) byproduct
material streams, minimizing void space, and placing the waste in the tailing sands with at least four feet
of sands below it and at least 12 feet from the side or dike of the cell.
Radioactive Materials License #UT1900479, Condition 10.5F: The Licensee shall notify the Executive
Secretary [now Director] in writing at least 7 calendar days prior to the proposed scheduled date for
disposal of any byproduct material generated at ISL facilities in the tailings cells.
0An annual summary of the amounts of waste disposed of from off-site ISL generators shall be sent to the
Executive Secretary [now Director] on or before November 1 of each calendar year.
The activities observed and information gathered during this inspection supports a conclusion that the
Licensee is complying with this license condition. The Division received notice of the disposal on July
18, 2017, which is greater than 7 days in advance of burial on August 10, 2017. The annual summary
submittal will be evaluated by DWMRC separately from this inspection.
Conclusions and Recommendations
The Licensee appears fully compliant with applicable laws, standards, requirements and License
Conditions with respect to disposal of 1 le.(2) byproduct material generated as decommissioning debris
from ISL uranium recovery facilities.
No new recommendations were identified during this inspection.
Third Quarter, 2017 1ST Decommissioning Debris Disposal Inspection Report
August 17, 2017
Page 5
Attachments: 1 le.(2) Byproduct Receipt Notifications dated July 15, 2017
Document packet for Nichols Ranch byproduct material bearing Bill of Lading Number NR-010-CPP
Document packet for Cameco- Smith Ranch byproduct material bearing Bill of Lading number 2017-
SAT2-004
Document packet for Cameco- Smith Ranch byproduct material bearing Bill of Lading number 2017-
SAT2-005
Document packet for Uranium One byproduct material bearing Bill of Lading number 02/17- Container#!
Document packet for Uranium One byproduct material bearing Bill of Lading number 02/17- Container #2
Document packet for UEC La Palangana byproduct material bearing Bill of Lading number LP-025
r St* ' 3 I Vk., ,^i
rr^fs
r F ■ S*U J -
.^sr-r^
Photo 1. Nichols Ranch 1 le.(2) byproduct material to be buried. Photo taken on
August 10, 2017.
Photo 3. Compacting clean cover and Nichols Ranch 1 le.(2) byproduct material.
Notice burial hole liquids in front of the bulldozer that prevented workers from fully
compacting this site. Photo taken on August 10, 2017.
Photo 2. Covering Nichols Ranch 1 le.(2) byproduct material with clean cover. The
surveyor had just completed measuring the top of the waste. Photo taken on August
10, 7.017
Photo 4. Uranium One 11 e.(2) byproduct material to be buried. Photo taken on
August 10, 2017.
Photo 5. Surveying the top of the Uranium One 1 le.(2) byproduct material prior to
covering with clean cover. Photo taken on August 10, 2017.
Photo 7. Cameco-Smith Ranch 11 e.(2) byproduct material to be buried. Prior to
DWMRC arrival, the material had been cut up to an appropriate size and placed in the
burial hole. Photo taken on August 10, 2017.
Photo 6. Compacting the Uranium One 1 le.(2) byproduct material and clean cover
with a bull dozer. Photo taken on August 10, 2017.
/•r'- -
:-.v;-A
Photo 8. Covering Cameco-Smith Ranch 1 le.(2) byproduct material with clean cover.
Photo taken on August 10, 2017.
Photo 9. Compacting Cameco-Smith Ranch 11 ,e(2) byproduct material and clean
cover with a bulldozer. Photo taken on August 10, 2017.
Photo 11. Surveying the top of La Palanga 11 e.(2) byproduct material prior to
covering with clean cover. Photo taken on August 10, 2017.
^ .-o - ~>.r- tt-Photo 10. Pushing of La Palanga 1 le.(2) byproduct material into burial hole. Photo
taken on August 10, 2017.
Photo 12. Compacting La Palanga 1 le.(2) byproduct material and clean cover. Photo
taken on August 10, 2017.
i No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
! Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 11 of 13
j Date; November 13,Title: lle.(2) Byproduct Disposal
i 2014
ATTACHMENT 2
1 le.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date: ______
Name of employee receiving the load:___________________ _
Generator of the Byproduct Material: A/ >^Uo U (2.
Shipper’s Manifest or Bill of Lading number: aj\L- 0\0- £.9?
Was the State of Utah given notice to the receipt/disposal activities associated with this load?^Yes^pr
No
Who gave and when was the notification given?
.ljA,!. jirJL.~7 / is/ i “T-
Description of byproduct material disposal area/activities:
— T...fUf?e.^ .-Sc-jc..__
Has each dram been inspected to identify the presence of any void spaces?
Have all drams with void spaces been filled with tailings sands or soil?__
Which tailings cell was the material placed in? C~t* 11 _______
JIA.
AJk
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
tisL-L.^A-£_ 'J&sttjs.SiS^fhL.*__
Was the material segregated from any Mill material or equipment disposed of in the cell?
___________________________________________________________________
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
________________________________________________...............................................
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 11 e.(2) Byproduct Disposal
Manifest or BOL #: yl/fe - OlO ~C-Pf
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? /e -$
Documentation of approval L-ct«jc & UT; ? ^ y 7 7 A»>r> 7 JK
Was the ISL material segregated from disposed Mill material and other
ISL material? i-ef
Refer to plat(s) used to confirm. C<H 3 Hc-z* Arreti
---------
Was the maximum lift thickness above tailings less than 4 feet thick?&
Was the maximum lift thickness of subsequent lifts less than 2 feet
thick?&____________
Has 4 foot of tailings sands been maintained under each disposal
area? ^
Refer to drawings used to confirm Cell 3 &
Is the bottom of each disposal area at least 12 feet from the sides or
dikes of the tailings cell? Ye 1
Refer to drawings used to confirm. Cell 3 Ce^h Pett^'hns <%>
Will the elevation of the material exceed the plane or grade of the
elevation of the uppermost flexible membrane liner of the cell?
How was this confirmed (e.g., survey or review)
C>ur</tv &7*
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
_a r^-n &xi_JH__.far..
Were void spaces filled with tailings?
____¥*JL____________________
Was the shipment properly covered?
_____Y^i( S'C CL _______
No.: PrlL-10 " ! ENERGY FUELS RESOURCES (USA) INC. r'“
, Rev. No.: R-3.3 ' STANDARD OPERATING PROCEDURES , Page 13 of 13
Date: November 13, ' Title: 1 le.(2) Bjproduct Disposal I2014 !
Manifest or BOL #: /j/ (2 " C7 *Q “
Are additional settlement monitors required to be placed for this generator?
MX _____________________________________________
If required, where were settlement markers were placed?
Radiological receipt survey measurements:
PXD' P.P/A t .. ^P-lUr-
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yes oj
2. If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities?ir No
9
re? Uranerz
enfrgv corporation
STRAIGHT BILL OF LADING
ORIGINAL-NOT NEGOTIABLE
GREENFIELD LOGISTICS
(Name of Carrier)
Shipment No.: NR-010-CPP
Date: July 19, 2017
24 HR. EMERGENCY CONTACT NUMBER: (307)232-6676
Ship to : Energy Fuels Resources, White Mesa Mill Ship From: Energy Fuels Resources, Nichols Ranch
Street: 6425 South Highway 191 Street: 485 Red Springs Rd.
City: Blanding ■ City: Linch
State: UT ZIP: 84511 State: WY ZIP: 82640
Route: Nichols Ranch to White Mesa Mill, Blanding, UT. Vehicle:
Number —T-3------feSfM
• No. of units &
container type HM Basic Description
Proper Shipping Name, Hazard Class,
Identification Number (UN or NA), Packing Group, per 172.101,172 202,172.203
Total Quantity
(Weight, Volume,
Gallons, etc.)
Weight
(Subject to
Correction)
1 Roll off X
RQ,UN2912, RADIOACTIVE MATERIAL, LOW SPECIFIC ACTIVITY (LSA-1),
NON-FISSILE, CLASS 7
RADIONUCLIDE: RESIDUAL NATURAL URANIUM & ASSOCIATED DAUGHTER
PRODUCTS
PHYSICAL FORM: SOLID
CHEMICAL FORM: NATURAL URANIUM OXIDE UO4-2H20
TOTAL ACTIVITY: 3.74x1010 Bq
TRANSPORT INDEX: N/A AS PER 49CFR172.203(d)(5)
PLACARDS: RADIOACTIVE 7
EXCLUSIVE USE SHIPMENT: THIS VEHICLE IS ASSIGNED FOR EXCLUSIVE
USE OF URANERZ ENERGY CORP. UNDER PROVISIONS OF 49 CFR 173.427
INCLUDING EXEMPTING FROM MARKING AND LABELING REQUIREMENTS -
DO NOT LOAD OTHER FREIGHT IN THIS VEHICLE, TRANSFER EN ROUTE
This is to certify that the above-named materials are properly classified, desenbed, packaged, marked and labeled, and are in proper condition for transportation according to the
applicable regulatjoHSrtfftKFDepartmeBt-ofXransportation.
Name: l Date: 7*
SHIPPER: Uranerz Energy Corp., an Energy Fuels Company CARRIER: (Q & pr/f.C_A L/ya? 1 <i~n CS
PER tMKl
DATE V/ Jkcjy*
'ij-zolty
Uranez
Controled Elevation used (Cell 3) 5612.6
Area Elevation Transit Shot
Initial shot for trench 5.18
Top of trench 5608.69 9.09
Bottom of trench 5603.08 14.7
Initial shot used for material 5.18
Too of material in trench 5607.08 10.7
Top of cell 3 Liner___________________________5608.5
Feet below liner 1.42
'Ener'gy Fuels Resources (USA) Corp.
White Mesa Mill
6425 S. Highway 191
Blanding UT 84511
*+ Reprinted by 4 at 07/20/17 13:43:06 **
Transaction No,
53176
Date Time Scale
In: 07/20/2017 13:14 1
Out: 07/20/2017 13:42 1
Vehicle ID T4
Trailer ID:Gross:48720 lb
Account ID:11(e)2 WYO NICHOLS RANCH Tare:43800 lb
Order ID:Net:4920 lb
Owner ID:
Material ID:
Destin. ID:
11(e)2 Mat 11(e)2 Material Receipt
BLANDING
Comments: GFLU002068
Operator: 4
Signature:
Charge by Weight
jyQ.-O\0 - t-K
^-oio-^pp
/o%~oio-c.?e
No.: PBL-10 ,
Rev. No.: R-3.3 !
ENERGY FUELS RESOURCES (USA) INC.
STANDARD OPERATING PROCEDURES Page 11 of 13
Date: November 13.
2014
Title: 1 le.(2) Byproduct Disposal f
}
ATTACHMENT 2
lle.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date: / >1
Name of employee receiving the load: _____ Te-rt-y ^1
Generator of the Byproduct Material: £tx.t^.cco - 5'^vMfU. 12- ^
Shipper’s Manifest or Bill of Lading number: 7 o I 7 ~ S AT 2. ^ OOP H
Was the State of Utah given notice to the receipt/disposal activities associated with this load? ^eijor
No
Who gave and when was the notification given?
JI2ic2,_____________________________________________________
Description of byproduct material disposal area/activities:
Pi , t r--. c U 'n p U-o f n__p/a. If cl.
Has each drum been inspected to identify the presence of any void spaces? AJ A-
Have all drums with void spaces been filled with tailings sands or soil? /j/A
Which tailings cell was the material placed in?____f/La-\\ 3 ________
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
—y^-fcrLiirCt^l__UXA.L. ______A----fcDte-«u>las_. __Aovo/v Lt> ■f-L.-c SovijLS.
Was the material segregated from any Mill material or equipment disposed of in the cell?
Yej ________________________________________________ ____
Was the material segregated from byproduct material from other 1SL sources disposed of in the cell?
...._______________________________________________________________________________________
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 11 e.(2) Byproduct Disposal
Manifest or BOL #: zor7 - SAT2.-0O0 M
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? ^5
Documentation of approval $ vT &
Was the ISL material segregated from disposed Mill material and other
ISL material? Yei
Refer to plat(s) used to confmn. Cell 3 He-'l fosaesa!
Was the maximum lift thickness above tailings less than 4 feet thick?,<£>
Was the maximum lift thickness of subsequent lifts less than 2 feet
thick?&
Has 4 foot of tailings sands been maintained under each disposal
area? ,
Refer to drawings used to confirm fell 3 So.*, f .
Is the bottom of each disposal area at least 12 feet from thd'sides or
dikes of the tailings cell?
Refer to drawings used to confirm. c,.j{ 3 Ctrs? Ontr.*#*&
Will the elevation of the material exceed the plane or grade of the
elevation of the uppermost flexible membrane liner of the cell?
__a/o
How was this confirmed (e.g., survey or review)
^ t u t ^ ..........................&
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
A __**•> __I caftj&l*-*- __ft-____________pdj-;__
___________________________________
Were void spaces filled with tailings?
_______________________________________________....____________________________^
Was the shipment properly covered?
___ V cjTy-ijtA_^lgt» ----------
"h/o.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.1
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 13 of 13
; Date: November 13,! 2014 .. .. i Title: lle.(2)B>'product Disposal
i
Manifest or BOL #: 'ZoH ' SAT?
Are additional settlement monitors required to be placed for this generator?
AJ*_______________________
If required, where were settlement markers were placed?
A/A-_____________
Radiological receipt survey measurements:
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yes
2. If yes, what were the results of the sampling?
No>
Was a photograph taken during the unloading activities?( Yes qj No
Shipper No. 2017-SAT2-0004
STRAIGHT BILL OF LADING
ORIGINAL-NOT NEGOTIABLE Carrier No. N/A
GREENFIELD LOGISTICS
(NAME OF CARRIER)(SCAC)
Collected on Delivery shipments, the Idlers COD must appear before consignee's name or as otherwise
provided in item 430, Sec. 1.
Date
Time
6/29/2017
To: Consignee Energy Fuels
Street: 6425 South HWY 191
City: Blanding Stale: UT Zip Code: 84511
From: Shipper Cameco Resources
Street: 762 Ross Road
City: Douglas State: WY Zip Code: 82633
24 hr Emergency Contact Tel. No:(905) 885-8745
Route: See attached Vehicle:
Number N/A
No of units &
container type HM Basic Description
Propr Shipping Nome. HazinlClauJdentincatjon Number (L'Mor NA) Packing group, per S 72.101, 172.202. 172 203 Total Quantity
(Weigh!, Volume, Gallons, etc)
Weight
(Subject to
Correction)
Rate Charges
(Fw Cimcr U*e Only)
Roll Off X UN2912, RADIOACTIVE MATERIAL, LOW SPECIFIC ACTIVITY (LSA-1),
CLASS 7
RADIONUCLIDE: NATURAL URANIUM, THORIUM-230 AND RADIUM-
226
18.9 m* (24.7 yd*)
PHYSICAL FORM: SOLID
CHEMICAL FORM; UNAT WITH DAUGHTERS
TOTAL ACTIVITY: 1.25E8 Bq (0.00337 Ci)
TRANSPORT INDEX: N/A AS PER 49 CFR 172.203(d)(5)
CATEGORY LABEL: N/A AS PER 49 CFR 172.203(d)(4)
EXCLUSIVE USE SHIPMENT:
THIS VEHICLE IS ASSIGNED FOR EXCLUSIVE USE OF CAMECO
RESOURCES, INC. UNDER PROVISIONS OF 49 CFR 173.427 INCLUDING
EXEMPTING FROM MARKING AND LABELING REQUIREMENTS
DO NOT LOAD OTHER FREIGHT IN THIS VEHICLE, TRANSFER EN
ROUTE, OR BREAK SEAL
PLACARDS TENDERED:YES: X NO:
REMIT C.O.D. TO
ADDRESS N/A
N(Jte-< 1) Where the rate is dependent on value, shippers arc required tn state
speafically on vmung the agreed or declared value of the property, as follow* The
agreed or declared value of the property is hereby specifically stated by the shipper 10
be act exceeding ■ per _ _ _
(2) Where the applicable tariff provisions specif)'a limitation of the comer's liabiht)
absent a release or a value declaration by the shipper and the ihippex doe* not release
the earner's liability or declare a value, the carrier's liability shall be limited to the
extent provided by such provisions See NMFL item 172
(3) Commodities requiring special or additional core or attention in handling or
slowing must be so marked end packaged as to ensure safe traoipcrution Sec
Section 2(e) of item 360, Bill* of Lading, Freight Bills and Statements of Charges
and Section Kb) of the Contract terms and conditions for a hsi of such articles
1 herein declare that the contents of this consignment are ftilly and accurately described above •
by the proper shipping name and are classified, packaged, marked and labdcdi'/placard, and are
in all respects in proper condioon for transport according to applicable international and
national govcmmeola] regulations
ON BEHALF OF SHIPPER
Subject ro Section 7 of the conditions if Ous
shipment is to be delivered to the consignee
without recourse on the consignor, ihc consignor
shall sign the following Etatemau.
The carrier shall not make delivery of this
shipment without payment of freight and all other
lawful charges.
N/A
(Signature of Consignor)
C.O.D,
FEE
PREPAID
N/A
TOTAL
CHARGES
N/A
FREIGHT CHARGES
FREIGHT PREPAID
except
when box
at right is
checked
Check box if charge*
o are to be collected
uflbu Billol Loding, ibe prupem Uncnbed ibiivt i> apfu/tiil |i.wl onkr.rccpi u noted (wmesU condioun uf <onMna of iMkaacs unknown)- nuAed. eonnsrat tad datmod u indiala) ebon which uid earner [Ux mronl cama benj
xuon of Ihur fwptrry under lie eoairtcl) t|rc« J k> carry to hi miul place of delivery H raid dcMm>eH>n.tf on It! nutc, iXEcrwDt lu deliver to trtulba amcr rathe roul* lu said deriiMlun. ft s mutually agreed ax to «cS cams of til <v«sye( md
any portion of sskS route to dcsimalM and as to each party al any lime istereend in all or «ny wid iha: ewy service to be perfijrmed hereunder mhtl be sibjecl to all iht tat; ofladm* terns and cond; Irons in *e |uwnln| ctaasirieaUea on Hie date of the ahipmenr.
Shipper hereby ceraOcs lhat he n famhar »nb all the fad™ tonrx and eoeditions in the govenuD* riaaificalui and rhe amd lenca asd condrtK»& aie haeby igrad to by the shqipa ud aeeepled for himadf and hei assigas
RECEIVED, tub]eel to the clasideobons and UriOs .n cffcxl oi
understood throughout this contrail os moeniag say penoa or urparaliun in
property o'
SHIPPER:CAMECO RESOURCES CARRIER:GREENFIELD LOGISTICS
PER PER (Un f-<^--/
DATE / 'DATE Js.irU Rjiauxkcl l <maju JJUlJLz..
(c
RSO:
Operations:
Rev 4 June 09, 2016
Page 1 of 1
WYO-RPP-FORM-031 Bill of Lading.xlsx
•9
Energy Fuels Resources (USA) Corp.
White Mesa Mill Transaction No.
6425 S. Highway 191 53160
Blanding UT 84511
** Reprinted by 4 at 06/30/17 07:53:53 **
Vehicle ID:
Trailer ID:
Account ID:
Order ID:
Owner ID:
Material ID:
Destin. ID:
T3
11(e)2 WYO SMITH RANCH / HIGHLAND
11(e)2 Mat 11(e)2 Material Receipt
BLANDING
In:
Out:
Date Time Scale
06/30/2017 07:22 1
06/30/2017 07:53 1 1
Gross: 50060 lb (M)
Tare: 44240 lb
Net: 5820 lb
4
T
'2a\1-$AT'1-Ooo1\
Comments: TRL # GFLU 2030
Operator: 4 Charge by Weight
Signature:
•M
jss
Smith Ranch
Controled Elevation used (Cell 3)
Area Elevation
5612.6
Transit Shot
Initial shot for trench 5.18
Top of trench 5609.29 8.49
Bottom of trench 5604.38 13.4
Initial shot used for material 5.18
Too of material in trench 5606.97 10.81
Top of cell 3 Liner 5608.5
Feet below liner 1.53
ENERGY FUELS RESOURCES (USA) INC.
STANDARD OPERATING PROCEDURES
Title: ] le.(2) Byproduct Disposal
No.: PB*L-10
\ Rev. No.: R-3.3
Date: November 13,
2014
Page 11 of 13
1
ATTACHMENT 2
lle.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date:__711x1)2___
Name of employee receiving the load:
Generator of the Byproduct Material: /Lcu^t-t-o -
Shipper’s Manifest or Bill of Lading number: 2 o >7 - S AT? — CXX>£
Was the State of Utah given notice to the receipt/disposal activities associated with this load? (^d^or
No
Who gave and when was the notification given?
bfcuiA TVrH ,....-thsin________________________________________________________
Description of byproduct material disposal area/activities:
Prp&c, fro^U. ^ Se^- fU.0 fa cxa-A
Has each dmm been inspected to identify the presence of any void spaces? A/A
Have all drums with void spaces been filled with tailings sands or soil?_____AjJk
Which tailings cell was the material placed in? L.C.W 3, __________ __
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands? ^
_fo s>______________________________________________________,
Was the material segregated from any Mill material or equipment disposed of in the cell?
.............................................................................................................................................................................................................................-______________________________________________________________________________-
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 11 e.(2) Byproduct Disposal
Manifest or BOL #: Zoil - SAVZ'-COOf
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? Kr 5
Documentation of approval Uctr,<-L ut !70eH7<( At**** 7 #
Was the ISL material segregated from disposed Mill material and other
ISL material? . Yr<
Refer to plat(s) used to confirm. Ceil 3 /A. z
Was the maximum lift thickness above tailings less than 4 feet thick?A?
Was the maximum lift thickness of subsequent lifts less than 2 feet
thick?&
Has 4 foot of tailings sands been maintained under each disposal
area? Ye <
Refer to drawings used to confirm Cell 1 a?
Is the bottom of each disposal area at least 12 feet from the sides or
dikes of the tailings cell? Y<3
Refer to drawings used to confirm. CeU 1 ^<?.5 &
Will the elevation of the material exceed the plane or grade'of the
elevation of the uppermost flexible membrane liner of the cell?
ASc)
How was this confirmed (e.g., survey or review)
_____________________________________________________________________________ ______________________ . ..._______________
%
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
A ucrtvS ___uLilirJU._______cAo.'ZJUZ________ier.fiv.X-t:___H____
__fLc*,i JlSi jt _______________
Were void spaces filled with tailings?
_________VcS ___________________________________________________________________________________________
Was the shipment properly covered?
Vg t _£>. c, /u-ba <sc- -
“No.: PBjL-10 "
| Rev. No.: R-3.3
: Date: November 13,
i 2014 _____
ENERGY FUELS RESOURCES (USA) INC. ' !
STANDARD OPERATING PROCEDURES j Page 13 of 13
Title: 1 le.(2) Byproduct Disposal |
Manifest or BOL #: Z.p\l ' SA'^^aoc>S
Are additional settlement monitors required to be placed for this generator?
/(/A_____________________________
If required, where were settlement markers were placed?
aJ.A___________________________________________
Radiological receipt survey measurements:
Breathing Zone:
1.
2.
Was a Breathing Zone Sample collected? Yes
If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities? Ye^pr No
Shipper No. 2017-SAT2-0005
STRAIGHT BILL OF LADING
ORIGINAL-NOT NEGOTIABLE
GREENFIELD LOGISTICS
Carrier No. N/A
(NAME OF CARRIER)(SCAC)
Collected on Delivery shipments, the letters COD must appear before consignee's name or as oiherwise
provided in item 430, Sec. I.
Date
Time
7/17/2017
To: Consignee Energy Fuels
Street: 6425 South HWY 191
City: Blanding State: UT Zip Code: 84511
From: Shipper Cameco Resources
Street: 762 Ross Road
City: Douglas State: WY Zip Code: 82633
24 hr Emergency Contact Tel. No:(905) 885-8745
Route: See attached
No of units &
container type HM Basic Description
Proper Shipping Name. HaaardClass.ldentification Number (UM or NA). Packing group, per 172 101, 172 202. 172 203 Total Quantity
(Weight, Volume, Gallons, etc.)
Weight
(Subject to
Coneciwin)
Rate Charges
(For Camcr Use Only)
Roll Off X UN2912, RADIOACTIVE MATERIAL, LOW SPECIFIC ACTIVITY (LSA-1),
CLASS 7 9.9 m* (13 yd*)
{
RADIONUCLIDE: NATURAL URANIUM, THORIUM-230 AND RADIUM-
226
PHYSICAL FORM: SOLID
CHEMICAL FORM; UNAT WITH DAUGHTERS
TOTAL ACTIVITY: 2.27E7 Bq (0.00061 Ci)
TRANSPORT INDEX: N/A AS PER 49 CFR 172.203(d)(5)
CATEGORY LABEL: N/A AS PER 49 CFR 172.203(d)(4)4!
EXCLUSIVE USE SHIPMENT:
THIS VEHICLE IS ASSIGNED FOR EXCLUSIVE USE OF CAMECO
RESOURCES, INC. UNDER PROVISIONS OF 49 CFR 173.427 INCLUDING
EXEMPTING FROM MARKING AND LABELING REQUIREMENTS
DO NOT LOAD OTHER FREIGHT IN THIS VEHICLE, TRANSFER EN
ROUTE, OR BREAK SEAL
PLACARDS TENDERED: . . YES: X NO:
REMIT C O D. TO: ’ '
ADDRESS N/A
Nmc-{ 1) Where Ihe rale n dqxndcnt on vrtluc, ahipperx ire requiTEd to SU(C
specifically on wnlmg the agreed or declared value of the property, as fblkn’n: The
agreed or declared value of the property is hcrobj specifically stated by the shipper to
be not exceediriE t>er
(2) Where the applicable tariff provisims specify a iumution of the earner's liability
absent a release or a value declaration by the shipper and the shipper docs not release
the earner's liability or declare a value, the carrier'i liability shall be bimted to the
extent provided by such provisions See NMFL item 172.
(3) Commodities requiring special or additional care or a lien lion in handling or
slowing must be to marked and packaged as to ensure ufe transportation. See
Section 2(c) of item 360. Bills of Lading. Freight Bills, and Statements of Charges
and Section 1 (a) of the Contract lemu and conditions for a list ol such ankles.
] hereby declare that (he contents of this consignment are fully and accurately described above
b) the proper shipping name and ore classified, packaged, marked, and labdediTplacaid, and are
in all respects in proper condition for transport according io applicable micmauonaJ and
national governmental regulations
ON BEHALF OF SHIPPER
C°D Ann* WA - -
FEE
PREPAID
liubjeei to Seen on 7 d the conditions u Uui
shipment 15 to be delivered to the consignee
without recourse on ths consignor, tbe consignor
shall sign the following statement-
The earner shall not make detivoy of (his
shipment without payment of freight and all othtr
lawful charges.
N/A
103 AL
CHARGES.
^ < N/A
FREIGHT CHARGES
FREIGHT PREPAID
except Chock box If charges
when box □ are to be collected
ot right is
checked
PiWWrfCM—1
Vehicle:
Number N/A
RECEIVED *ubjcc! ip tht cla4u0e»iii.'.r>> innfL m <ffoct on tha tbit of mae of (hi. Bill trt Ltvliop, itte properr. 4eitnhe4 ab>)t« inappateni good order, dxsrpi at noted (oonlcnis 4nd coat! Ironol ccnttrK vifpeckagen on Imran), inerLed. cgrrgncd. and dBiirtod at vdicMed abon whtch Mid uiner(lHe uurdc;
Lpdcrtufcjd tbiVBjhooi ifitv cooirscl ti meaniag my or eorpmuott t.-ipoyssauenul' ib:i properry wnecr Ox coilrstt) afreet lu carry 1u iti utual pbee ol delivery r: a'd dexnr.ii.un, it oo tu rtule, crhenmcWi deliver loanoUxr earner os Dm route (o wid dwtineUun H n nnUiallyafrad estuiach caoxr of ad or asvoC uld
ptopem'over all uf any ponirn ol votd Mile to daunatBin »rtl«tlue*<hpaTy*t»ri,r time iiuneited in all uranywud ptoperty, lhal every icrvie* to ba petfamrd hncurvlei vhdi be subject lo all the tall oHujing 'eiTri and tondilionx loihegowmng tlatvdtcathin on the date <HiKc ihiptnem
Shipper hereto, ccrlilics that he iv Cinltar with afl the lading terms and ccnditns/u in the pjvemin* dflaMlkaliun and the said toms and ccvhiioea ate hereby agreed to by the shipper and accepted lor hicnjrtt and ha aiMgns
SHIPPER:CAMECO RESOURCES CARRIER:D LOGISTICS
PER
DATE
"s PER ^
DATE -7//V/7
i. KSO:
Operations:
—
Rev 4 June 09, 2016
Page 1 of 1
WYO-RPP-FORM-031 Bill of Lading.xlsx
~?ll tlt7
Smith Ranch
Controled Elevation used (Cell 3)5612.6
Area Elevation Transit Shot
Initial shot for trench 5.18
Top of trench 5609.29 8.49
Bottom of trench 5604.38 13.4
Initial shot used for material 5.18
Tod of material in trench 5606.97 10.81
Top of cell 3 Liner 5608.5
Feet below liner 1.53
5=,..,,, =
- S/^'ooo£
"Energy Fuels Resources (USA) Corp.
White Mesa Mill Transaction No.
6425 S. Highway 191 53173
Blanding UT 84511
Vehicle ID:
Trailer ID:
Account ID:
Order ID:
Owner ID:
Material ID:
Destin. ID:
Date Time Scale
In: 07/18/2017 07:15 1
Out: 07/18/2017 07:46 1
11(e)2 WYO SMITH RANCH
Gross: 56300 lb (M)
Tare: 43540 lb
Net: 12760 lb
11(e)2 Mat 11(e)2 Material Receipt
BLANDING
Comments: TRL # GFLU2003
Operator: 4 Charge by Weight
Signature: < t^ Jir
' No.: TBL-IO ENERGY FUELS RESOURCES (USA) INC.
1 Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 11 of 13
Date: November 13,Title: 1 le.(2) Byproduct Disposal I
2014
ATTACHMENT 2
lie.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date:___ffMl?____
Name of employee receiving the load: __ Tcr^y _______
Generator of the Byproduct Material:__
Shipper’s Manifest or Bill of Lading number: (yzhl - i> l
Who gave and when was the notification given?
D a-v' .^ Vis r k'-j__^2-1 AS i l~J
Description of byproduct material disposal area/activities:
C- I TWnjy ^ ^ Uj» ho $ La
Has each dmm been inspected to identify the presence of any void spaces? jUJK
Have all drums with void spaces been filled with tailings sands or soil?/JA____________
Which tailings cell was the material placed in? C-zW 7? _________
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
Aa. Cr-j^ l__U> iW Av_ oloqjA- 4t> J> CK«rCA-S.
Was the material segregated from any Mill material or equipment disposed of in the cell?
VcJ-........................................................................................................................................................................
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
......—..................—---------------------------~........................... -......-......— — -
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 11 e.{2) Byproduct Disposal
' Manifest or BOL #: Ozhl O l
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal?
Documentation of approval P}uT 4^^ 7
Was the ISL material segregated from disposed Mill material and other
ISL material? /e ^
Refer to plat(s) used to confirm. ,/>// % lie- Z &\s*za/ Ar**
Was the maximum lift thickness above tailings less than 4 feet thick?
Was the maximum lift thickness of subsequent lifts less than 2 feet
thick?
Has 4 foot of tailings sands been maintained under each disposal
area? fo-
Refer to drawings used to confirm Cell j Cc/a/'.
Is the bottom of each disposal area at least 12 feet from the sides or
dikes of the tailings cell? Ytj
Refer to drawings used to confirm. cell 5 e',,*sk
Will the elevation of the material exceed the plane or grade of the
elevation of the uppermost flexible membrane liner of the cell?
a/o
How was this confirmed (e.g., survey or review)
Sun/t*./,
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
Corfu, fly \ a-ft. J lb M.
__— If P-4-___________________________________________________________________________________
Were void spaces filled with tailings?
Vcr_________________________________________ ..._____________________
Was the shipment properly covered?
St-Cr ih,ho ^
ENERGY FUELS RESOURCES (USA) INC.
STANDARD OPERATING PROCEDURES
Title: 11 e.(2) Byproduct Disposal
Page 13 of 13
“No.: PBL-10
: Rev. No.: R-3.3
j Date: November 13,
i 2014 ________
Manifest or BQL #: P Z,/r74-*s\
Are additional settlement monitors required to be placed for this generator?
AS.A^:■
If required, where were settlement markers were placed?
------------A/. A_________________—........................................................
Radiological receipt survey measurements:
..
Breathing Zone:
1.
2.
Was a Breathing Zone Sample collected? Yes ojff^
If yes, what were the results of the sampling?
r NoWas a photograph taken during the unloading activities?-
uranium
one
BILL-OF-LADING & LICENSED MATERIAL
SHIPPING FORM
EMERGENCY CONTACT: (307) 267-4623
BYPRODUCT SHIPMENT ID# 02/17 SHIPMENT DATE 8/3/2017
SHIPPER (From)
Uranium One Americas
Irigaray/Christensen Projects, NE
of.Linch, Wyoming
CONSIGNEE (To)
: White Mesa Mill
ADDRESS 907 N. Poplar St
Suite 260 Casper, WY. 82601
ADDRESS
6425 South HWY. 191
Blanding UT, 84511
SHIPPER LICENSE NO.
SUA-1341 Uranium One
SHIPPER USDOT NO.
USDOT 1698297
CONSIGNEE LICENSE NO.
UT 1900479
CONSIGNEE TELEPHONE NO.
(435)-678-2221
SHIPPER HAZMAT REG. NO.
071116 550 049Y
SHIPPER TELEPHONE NO.
(307) 696-8140
CARRIER NAME AND
ADDRESS
Greenfield Logistics LLC
PO Box910332
ST George, UT 84791
CARRIER USDOT NO.
919061
CARRIER HAZMAT REG. NO.
062916 552 046Y
HM
DESCRIPTION OF MATERIAL AND PACKAGING
(USE PROPER CLASSIFICATION)
VOLUME
cubic feet CLASSIFICATION
X UN 2912, Radioactive Material, Low Specific Activity-1, solid
waste, scrap material and soil containing residues of uranium-
natural.
Container #U1
0001=764.1 CF
Container
#U10002 =
764.1 CF
Low specific activity (LSA)
Activitv: 370 MBa l .01 Cl)Total 1528 CF
Curie (Ci) = 7.1 E-7 x grams of uranium (natural)
Megabecquerel (Mbq) = Ci x 3.7 E4
Exclusive use shipment
CERTIFICATION: These is to certify that the above named articles are properly classified, described, packaged,
marked and labeled, and are in proper condition for transportation, according Ip the applicable regulations of the Department of
Transportation and the U.S. Nuclear Regulatory Commission
Shipper's Signature:^
Driver's Signature:
Date:
ate: ^ViTt
DESTINATION ONLY
Received by:
Indication of leakage^NO^ YES
./&.VT.U i M.AsxL
If yes, give^planation:
Date: -g H
Energy Fuels Resources (USA) Corp.
White Mesa Mill
6425 S. Highway 191
Blanding UT 84511
** Reprinted by '4 at 08/04/17 15:13:40 **
Vehicle ID:
Trailer ID:
Account ID:
Order ID:
Owner ID:
Material ID:
Destin. ID:
T3
URANIUM ON URANIUM ONE lle2
URANIUM ON URANIUM ONE lle2
BLANDING
Transaction No.
53192
Date Time Scale
In: 08/04/2017 14:15 1
Out: 08/04/2017 15:12 1
Gross: 61780 lb (M)
Tare: 46960 lb
Net: 14820 lb
4- u \
Comments: TRL 3 Ul-001, Ul-002
Operator: 4 Charge by Weight
l r\ * 1
Signature: ' ^ ^
1 r-
QOL'
Uranium One
Controled Elevation us 5612.6 / ^ ± -OZl \7 - C'C>^+o.,^cr-j&.o\
Area Elevation Transit Shot
Initial shot for trench 5.18
Top of trench 5608.69 9.09
Bottom of trench 5603.08 14.7
Initial shot used for material 5.18
Tod of material in trench 5607.08 10.7
Top of cell 3 Liner 5608.5
Feet below liner 1.42
No.: PBL-10
Rev. No.: R-3.3
Date: November 13,
2014
ENERGY FUELS RESOURCES (USA) INC.
STANDARD OPERATING PROCEDURES
Title: 11 e.(2) Byproduct Disposal
Page 11 of 13
ATTACHMENT 2
lle.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date:____
Name of employee receiving the load: ^rvy SI a-tl C____
Generator of the Byproduct Material: ___
Shipper’s Manifest or Bill of Lading number: z. It?-^ tt. Lh U
Was the State of Utah given notice to the receipt/disposal activities associated with this load?/^ei or
No
Who gave and when was the notification given?
tWIA , 7| ...........................
Description of byproduct material disposal area/activities:
t <_____________..............fi*. f-fg- .
Has each drum been inspected to identify the presence of any void spaces?__ ________
Have all drums with void spaces been filled with tailings sands or soil? A/A-
Which tailings cell was the material placed in?____/.r:\ \ 3 ______________
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
. fyMk cvLt-rrl' tvi.—Luifo-Ji_pImC j-A. . i -v—jh---Tot ___T-L? ?-v E ..................................jr.e_ t .
Was the material segregated from any Mill material or equipment disposed of in the cell?
.............. .............................................................................................................................
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
Vcf
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 1 le.(2) Byproduct Disposal
Manifest or BOL #: ^
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? fe
Documentation of approval $ uT tyotVy1! 7 £
Was the ISL material segregated from disposed Mill material and other
ISL material? ^
Refer to plat(s) used to confinn. £<*// 3 //<?.&
Was the maximum lift thickness above tailings less than 4 feet thick?&
Was the maximum lift thickness of subsequent lifts less than 2 feet
thick?&
Has 4 foot of tailings sands been maintained under each disposal
area? K-y
Refer to drawings used to confirm C< it 3 O'* —-&
Is the bottom of each disposal area at least 12 feet from the sicies or
dikes of the tailings cell? .&<
Refer to drawings used to confirm. Cell 3 f &
Will the elevation of the material exceed the plane or grade'’of the
elevation of the uppermost flexible membrane liner of the cell?
jJo
How was this confirmed (e.g., survey or review)
r v € if &
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
-JL _Jr___________4__
Were void spaces filled with tailings?
____________________
Was the shipment properly covered?
______________________________
No.:' PBL-10
Rev. No.: R-3.3 ;
ENERGY FUELS RESOURCES (USA) INC.
STANDARD OPERATING PROCEDURES i Page 13 of 13
Date: November 13,
2014
Title: lle.(2)B>product Disposal
Manifest or BOL #: £.1 il 0~Cr^& 07^
Are additional settlement monitors required to be placed for this generator?
______AlJz—-----------------------------------------------------------------------
If required, where were settlement markers were placed?
_______MJs_________
Radiological receipt survey measurements:
. 5 <Kld Lr t RXD -O_________
Breathing Zone:
1.
2.
Was a Breathing Zone Sample collected? Yes oi
If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities?/1?eshr No
uranium
BILL-OF-LADING & LICENSED MATERIAL
SHIPPING FORM
EMERGENCY CONTACT: (307) 267-4623
BYPRODUCT SHIPMENT ID# 02/17 SHIPMENT DATE 6/3/2017
SHIPPER (From)
Uranium One Americas
Irigaray/Christensen Projects, NE
of Linch, Wyoming
CONSIGNEE (To)
: White Mesa Mill
ADDRESS 907 N. Poplar St.
Suite 260 Casper, WY. 82601
ADDRESS
6425 South HWY. 191
Blanding UT, 84511
SHIPPER LICENSE NO.
SUA-1341 Uranium One
SHIPPER USDOT NO.
USDOT 1698297
CONSIGNEE LICENSE NO
UT 1900479
CONSIGNEE TELEPHONE NO.
(435)-678-2221
SHIPPER HA2MAT REG. NO.
071116 550 049Y
SHIPPER TELEPHONE NO.
(307) 696-8140
CARRIER NAME AND
ADDRESS
Greenfield Logistics LLC
PO Box 910332
ST George, UT 84791
CARRIER USDOT NO.
919061
CARRIER HAZMAT REG. NO.
062916 552 046Y
HM
DESCRIPTION OF MATERIAL AND PACKAGING
(USE PROPER CLASSIFICATION)
VOLUME
cubic feet CLASSIFICATION
X UN 2912, Radioactive Material, Low Specific Activity-1, solid
waste, scrap material and soil containing residues of uranium-
natural.
Container #U1
0001= 764.1 CF
Container
#U 10002 =
764.1 CF
Low specific activity (LSA)
Activity: 370 MBa f .01 Ci)Total 1528 CF
Curie (Ci) = 7.1 E-7 x grams of uranium (natural)
Megabecquerel (Mbq) = Ci x 3.7 E4
Exclusive use shipment
CERTIFICATION: These is to certify that the above named articles are properly classified, described, packaged,
marked and labeled, and are in proper condition for transportation, according tp the applicable regulations of the Department of
Transportation and the U.S. Nuclear Regulatory Commissic
Shipper's Signature:
:ommissioi> /
Date:
Driver's Signature: [ *%— l <'yL
DESTINATION ONLY
^Received by:
Indication of leakagqr!NO] YES If yes, give^iplanation:
Date: % -A-\l
Uranium One
V
x
Controled Elevation us 5612.6
Area Elevation Transit Shot
Initial shot for trench 5.18
Top of trench 5608.69 9.09
Bottom of trench 5603.08 14.7
tial shot used for material 5.18
Too of material in trench 5607.08 10.7
Top of cell 3 Liner 5608.5
Feet below liner 1.42
C?Z 1 4- oz.
Transaction No.
53192
Energy Fuels Resources (USA) Corp.
White Mesa Mill
6425 S. Highway 191
Blending UT 84511
** Reprinted by 4 at 08/04/1,7 15:13:40 **
Vehicle ID:
Trailer ID:
Account ID:
Order ID:
Owner ID:
Material ID:
Destin. ID:
T3
URANIUM ON URANIUM ONE lle2
URANIUM ON URANIUM ONE lle2
BLANDING
Date Time Scale
In: 08/04/2017 14:15 1
Out: 08/04/2017 15:12 1
Gross: 61780 lb (M)
Tare: 46960 lb
Net: 14820 lb
Comments: TRL 3 Ul-001, Ul-002
Operator: 4 Charge by Weight
Signature:JnAU'wv
/I
’No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.i
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 11 of 13
| Date: November 13.Title: Ile.(2) Byproduct Disposal
| 2014 |
ATTACHMENT 2
lle.(2) BYPRODUCT MATERIAL DISPOSAL DOCUMENTATION FORM
Date: ^/|Q/>7____
Name of employee receiving the load: _ TV y AT a Ac.
Generator of the Byproduct Material: u£c_
Shipper’s Manifest or Bill of Lading number: 4- P - O ZS ______
Was the State of Utah given notice to the reccipt/disposal activities associated with this load? (ycsY>r
No
Who gave and when was the notification given?
. ..... llislt 7_____________________________________.. .
Description of byproduct material disposal area/activities:
Has each drum been inspected to identify the presence of any void spaces? Ye.5 ___
Have all drums with void spaces been filled with tailings sands or soil? coc-rt, Ucek u>f W
l
WTiich tailings cell was the material placed in?___£e-li _______________
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
- I A________________4-Ufc-T_______fo TL.iL .
Was the material segregated from any Mill material or equipment disposed of in the cell?
_.... ics:
Was the material segregated from byproduct material from other 1SL sources disposed of in the cell?
............{*')__________ _________________________________________________________
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 12 of 13
Date: November 13,
2014
Title: 11 e.(2) Byproduct Disposal
Manifest or BOL #: L P- O 7 y
Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
Engineer’s or
Environmental
Coordinator’s
Initials
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? •%
Documentation of approval mT itjodHT*} /W»» 7
Was the ISL material segregated from disposed Mill material and other
ISL material?
Refer to plat(s) used to confirm. ctU 3 /Je-.z &
Was the maximum lift thickness above tailings less than 4 feet thick?%
Was the maximum lift thickness of subsequent lifts less than 2 feet,
thick?&
Has 4 foot of tailings sands been maintained under each disposal
area? fry
Refer to drawings used to confirm Ceti 3 Co.nfr T
Is the bottom of each disposal area at least 12 feet from the sides or
dikes of the tailings cell? <
Refer to drawings used to confirm. Cth 3 c'o/i^h e &
Will the elevation of the material exceed the plane or grade of the
elevation of the uppermost flexible membrane liner of the cell?
Jld
How was this confirmed (e.g., survey or review)
—-----------------
^___________
7
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
/Ar-c-e- _A.__lP Cc Acr__tfcir__(f__hi__________fjCrc:__l■ ^^ _____
Were void spaces filled with tailings?
Was the shipment properly covered?
_____Vg-St oJsxyy c
No.: PBL-10 ENERGY FUELS RESOURCES (USA) INC.
Rev. No.: R-3.3 STANDARD OPERATING PROCEDURES Page 13 of 13
iDate: November 13,
2014
Title: 1 le.(2) Byproduct Disposal
i 11
Manifest or BOL #: L P-O 2.6
Are additional settlement monitors required to be placed for this generator?
______xtA_______________________________
If required, where were settlement markers were placed?
AlA_____________________:_________
Radiological receipt survey measurements:
__pr P' 0________^
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yesor^f^
2. If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities?/! es)>r No
Shipment Number t-l ~~ I'ok
BILL OF LADING - LICENSED MATERIAL SHIPPING FORM
24-HOUR EMERGENCY CONTACT NUMBER/PROVIDER & CONTRACT NAME OR No.
(830j 583-4222 Kevin Dziuk (Radiation Safety Officer)
CONSIGNOR (Shipper/From): Company Name and Site CONSIGNEE (Receiver/To): Company Name and Site
South Texas Mining Venture LLP - Benavides, Texas Energy Fuels - Blanding, Utah
ADDRESS: 5781 FM 3196 Benavides, TX 78341 ADDRESS: 6425 S Highway 19 Blanding, UT 84511
SHIPPER TELEPHONE No.: (361)256-3995 CONSIGNEE TELEPHONE No.: (435)678-2221
SHIPPER/TRANSPORTER INFORMATION
SHIPPER NR C/STATE LICENSE No.: R06062
SHIPPER USDOT No.: 148604
CARRIER NAME: Cosby Trucking
CARRIER USDOT No.: 298957
CONSIGNEE NRC/STATE LICENSE No.: UT 1900479
SHIPPER PHMSA REGISTRATION No.: 071111550027TV
CARRIER ADDRESS: 601 S 200 E Blanding, UT 84511
CARRIER PHMSA REGISTRATION No.: 071113550019V
NUMBER
OF UNITS HM
DESCRIPTION OF MATERIAL, ARTICLES, SPECIAL MARKS, EXCEPTIONS
UN PSN CLASS
GROSS
WEIGHT
KG (LBS)
1
TRAILER
i
UN 2912 RADIOACTIVE MATERIAL, LOW SPECIFIC ACTIVITY (LSA-1)
(Solid Byproduct Material)
Activity 37 Mbd ( Ci)
Curie x 3.7E4 = 1 Megabecquerel
Volume 11 cubic-feet
7 Estimated
TH39-
(asreeer
♦♦♦♦EXCLUSIVE USE SHIPMENT****
CATEGORY OF LABEL(S) APPLIED TO PACKAGE - RADIOACTIVE LSA,
EMERGENCY RESPONSE DOCUMENT ATTACHED - 2016 ERG Section 162
This is to certify that the above-named articles are properly classified, described, packaged, marked, and labeled, and are in proper condition
for transportation accopdfng to the applicable regulations of the Department of Transportation.
17
SHIPPER'S SIGNATURE DATE
date ‘S^8r-/r7
DATE 10-17
Controled Elevation used (Cell 3)
UEC La-Palangana
5612.6
Area Elevation Transit Shot
Initial shot for trench 5.18
Top of trench 5608.58 9.20
Bottom of trench 5602.29 15.49
Initial shot used for material 5.18
Too of material in trench 5606.55 11.23
OZ-5'
Top of cell 3 Liner5608.5
Feet below liner 1.95
, ,1,1,1, ;............................
Enefgy Fuels Resources (USA) Corp.
White Mesa Mill Transaction No.
6425 S. Highway 191 53197
Blanding UT 84511
** Reprinted by 4 at 08/10/17 07:32:41 **
Vehicle ID:
Trailer ID:
Account ID:
Order ID:
Owner ID:
Material ID:
Destin. ID:
875
UEC MNT LU US ECOLOGY
11(e)2 Mat 11(e)2 Material Receipt
BLANDING
In:
Out:
Date Time Scale
08/10/2017 07:02 1
08/10/2017 07:32 1
Gross: 62520 lb (M)
Tare: 33060 lb
Net: 29460 lb
Comments: TRL # 5
Operator: 4 Charge by Weight
Signature:
d
U,Jt.
/ p~ozr