HomeMy WebLinkAboutDERR-2024-006064X
Jones Covey Group
Fabian M. Gomez (626) 627-8096 cell
(888) 972-7581 Office
Fabian Gomez 547 10-18-2025
273 E 1000 N. Spanish Fork, UT 84660
Costco Warehouse
T-1 Regular T-2 Regular T-3 Premium T-4 Additive
(801) 504-9530
4/29/2024 thru 5/9/2024
X
Scope of Work: Remove old Steel Manway Lids over the Fill Sumps and Annular Space, replacing with
new Composite Material Manways . Work involves saw cutting, demolition around the designated
Manways (T-1 Fill & Annular, T-2 Fill & Annular, T-3 Fill & Annular, T-4 Fill & Annular). Retrofit
modification related to the Top Hats Spill Buckets. OPW Retrofit materials are Manufacture Like for Like.
No modifications to be performed on existing underground Product or Vapor lines. Upon completion of
the Retrofit Manways, contractor to pour back concrete.
30K 30K 30K 1500 Gallon
Unleaded Reg Unleaded Reg Unleaded Reg Additive
1000907
PERMIT NOT NEEDED 4/17/24 PKL