Loading...
HomeMy WebLinkAboutDERR-2025-007272FUEL SYSTEMS | GENERAL CONTRACTING | ENVIRONMENTAL SERVICES | WASTE SOLUTIONS ENERGY SOLUTIONS AUTOMOTIVE & COMMERCIAL EQUIPMENT P.O. BOX 3360 DES MOINES, IA 50316 4140 E. 14TH STREET DES MOINES, IA 50313 PHONE: 515-262-5000 CORPORATE HEADQUARTERS WWW.SENECACO.COM STORE.SENECACO.COM 6HQHFD$FFRXQW5HS 3KRQH 'DWHRI7HVW 6FRSHRI:RUN 6HQHFD-RE &XVWRPHU32 7HFKQLFLDQ &HUWLILFDWLRQ VHHWHVWUHSRUWVDWWDFKHG 7HVWLQJ6XPPDU\ 7HVW6XPPDU\'HVFULSWLRQ &RPSRQHQW7HVWHG 'DWH7HVWHG 5HVXOW &XVWRPHU,QIRUPDWLRQ 1DPH 6WUHHW $GGUHVV &LW\ 6WDWH =LS &RQWDFW 3KRQH 1XPEHU 6LWH,QIRUPDWLRQ 6LWH1DPH Testing Summary 6WUHHW $GGUHVV &LW\ 6WDWH =LS )DFLOLW\1R 10/3/25 TLT-W2500890 LD Wind River Petroleum/To Sto Stores 5097 So 900 E Ste 200 Salt Lake Cit UT 84117 Curtis Scharman 801 272-9229 To Sto 351880 2010 N Park Avenue Park Cit UT 84060 7000072 LD-Leak Detector Unl LD 10/03/2025 Pass Mark Shirle Garrett Herlache 515-262-5000 )LHOG1RWHV 4140 E. 14TH STREET DES MOINES, IA 50313 PHONE: 515-262-5000 CORPORATE HEADQUARTERS P.O. BOX 3360 DES MOINES, IA 50316 WWW.SENECACO.COM STORE.SENECACO.COM Testing Summary 7HVWLQJ6XPPDU\ FUEL SYSTEMS | GENERAL CONTRACTING | ENVIRONMENTAL SERVICES | WASTE SOLUTIONS ENERGY SOLUTIONS | AUTOMOTIVE & COMMERCIAL EQUIPMENT Site Location - Top Stop Park City, UT Job #: TLT-W2500890 Arrived on site and checked in with manager. Opened sumps and dispenser and then began testing. Dri Sump SB – n/a Hydro Sump Sumps – n/a Hydro Sump UDC – n/a Spill Bucket Hydro – n/a SB / Low Level – n/a Stage 1 Pressure Decay- n/a ATG/AMC – n/a Tank Test- n/a Line Test- n/a Leak Detector – Tested/Passed upon arriving to the site the Unl MLLD was always running, upon troubleshooting we discovered that the Relays are wired to VMI auto repressure Modules and the module connected to the Unl has gone bad. we removed the blue power wire to the module and we were able to get the Pump to turn off and conduct a LD test. Upon turning off breakers to tie in, disp 3,4 would start surging and wouldnt come back into operation. we called Top Stops Curtis to see what they would like us to do and they said they will mess with it themselves. so i left the Disp 3,4 wrapped up in caution tape. SV/ESO – n/a OVERFILL- n/a Walk Thru Insp- n/a AST inspection- n/a pei.org 59 Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities APPENDIX C-9 MECHANICAL AND ELECTRONIC LINE LEAK DETECTORS PERFORMANCE TESTS Facility Name: Owner: Address: Address: City, State, Zip Code: City, State, Zip Code: Facility I.D. #: Phone #: Testing Company: Phone #: Date: This data sheet can be used to test mechanical line leak detectors (MLLD) and electronic line leak detectors (ELLD) with submersible turbine pump (STP) systems. See PEI/RP1200 Sections 9.1 and 9.2 for test procedures. Line Number Product Stored Leak Detector Manufacturer Leak Detector Model Type of Leak Detector MLLD ELLD MLLD ELLD MLLD ELLD MLLD ELLD MLLD ELLD MLLD ELLD MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) STP Full Operating Pressure Check Valve Holding Pressure Line Resiliency (ml) (line bleed back vol- ume as measured from check valve hold- ing pressure to 0 psig) Step Through Time in Seconds (time the MLLD hesitates at metering pressure before going to full operating pressure as measured from 0 psig with no leak induced on the line) Metering Pressure (STP pressure when simulated leak rate 3 gph at 10 psig) Opening Time in Seconds (the time the MLLD opens to allow full pressure after simulated leak is stopped) Does the STP pressure remain at or below the metering pressure for at least 60 seconds when the simulated leak is induced? Yes No Yes No Yes No Yes No Yes No Yes No Does the leak detector reset (trip) when the line pressure is bled off to zero psig? Yes No Yes No Yes No Yes No Yes No Yes No Does the STP properly cycle on/off under normal fuel system operation conditions? Yes No Yes No Yes No Yes No Yes No Yes No A “No” answer to either of the above questions indicates the MLLD fails the test. ELLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) STP Full Operating Pressure How many test cycles are observed before alarm/shutdown occurs? Does the simulated leak cause an alarm? Yes No Yes No Yes No Yes No Yes No Yes No A “No” answer to the above question indi- cates the ELLD fails the test. Does the simulated leak cause an STP shutdown? Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Comments: Tester’s Name (print)___________________________________ Tester’s Signature __________________________________ pei or To Sto #351880 Wind River Petroleum/To Sto Stor 2010 N Park Avenue 5097 So 900 E Ste 200 Park City, UT 84060 Salt Lake City, UT 84117 7000072 (801) 272-9229 Seneca Companies 515-262-5000 10/3/2025 1 Unl VMI LD2000 3 2 24 175 1 22 6 Garrett Herlache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ispenser/Tank Sump free of all tools, liquid & debris upon completion of work? Were any sensors replaced? Programming on Monitoring Console checked for positive shutdown? All containment & UDC sensors returned to proper placement & locked (if applicable). All containment lids & retaining bolts securely fastened (if applicable). All dispenser door panels are closed & locked. Flint Loc/security alarms activated (if applicable). All test gauges/test isolation devices were properly removed. All secondary containment boots have been pulled back/removed. All site owned keys have been returned to site manager/representative. All monitor alarms generated have been logged & responded to appropriately. Monitor is free of alarms & dis la in All Functions Normal. Top Stop 351880 2010 N Park Avenue TLT-W2500890 Park City UT 84060 10/3/25 LD 12:00 14:15 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ Garrett Herlache Curtis Scharman ✔