Loading...
HomeMy WebLinkAboutDERR-2024-006031Page 1 ot )-Utah Department of Environmental Quality 8000208 APST Verif ication lnspection Ownership of Tanks Location of Tanks TOOELE ARMY DEPOT Tooele Army Depot South Bulk Fuel Station 1 TOOELE ARMY DEPOT SJMTE CDN BLDG 8 1 500 Stark Boad IOOELE UT 34074 srocKToN l:,t la+ozr Contact Name:#lEmail: SPCC Plan?: Yes No lUs fire Marshal lnsp:ATG lnfo: Complete lor each tanlc | 5'lL1 h 5t L't StLcic Capacity of tank (gallons):tLk /7,?1? tr Odonlation ol trank:Lh, f +0.7'-> Bottom of tank in contact with (soil, grav6l, concretB, not touching): aDFnft_i4 5.llrt 7 Substance stored:oLl'Rorrl rl"l cJr /q( Date last usod/dspth of product: Type of spill prevention device: Type ol Piping (Pressure or Suclion):frql."-- Does pressure piping have LLD:ves @y''l ttr &C No NA C6C No NA I Ye$ No NA Yes No NA Yes No NA Spill bucket is cl6an, intac,t, stc.(9 No @No (P Na Yes iitr Yes No Yes No Type of overfill Prsvenlion device: Overfill ala rm (audible or visible is properly located so delivery driver can iloar or sue ii, ard is clearly identified:Yes No NA Pipe trans flex protoction method (Sump, CP, lsolated, Booted): q ^tTriit.abo-<g*ry),-4*Jesat trQf 1,4 rren Containmont sumps dry:Yes No 6P (B No NA (6/ No NA Yes iJ: NA Yes No NA Yes No NA Sump comments: Stage 1 Vapor Flecovery:zpt Coax (.lgrl 2pt Coax(Coax None 2oi Goax None 2pt Coax None 2pl Coax None Pressuro Vent Valve is on vents:Yes No d Yes No ({}1 No NA !'es Nc N.\Yes No NA Yes No NA Secondary containrnenl ar6a comments: Complete tor each dlopenser u4l - /4/* Flex protection method (UDC, Cathodic Prolection, lsolated, Booted):uoa u(lL UDC sump dry:(Sel tto NA ,l No NA Y6s No t\A Ves Nc N,\Yes No NA Yes No NA Fire valve anchored, located below grade, and without ball valve:@NoNA &f No NA Yes No NA Yes \1, tt.\Yes No NA Yes No NA Comments: Addltlonal dlapencer quertlone # Flex prolec{ion msthod (UDC, Cathodic Protoct on, lsolated, Booted): UDC sump dry:Yes No NA Yes No NA Yes No NA l ai, ,\-. ,r-\Yes No NA Yes No NA Fire valve anchored, located below grade, and no ball valve: Yes No NA Yes No NA Yes No NA vcs '\jr ?v,l Yes No NA Yes No NA Additional CommoDts: /"El (l* T L9 ? ro BesJ(.n5 /bl.' :,, (.9t.::. e Ll ir: t3nly) _ r:,ieti{rl OK? Slgnatures /r) / // aa c"r/ -..---.l_.--..- Tank ln,..r or, ;! . ii; " #l*l*l* Page2ol -2^Utah Department of Environmental Quality 8000208 APST Facility Site Plat Show locations of all buildings, streets, tanks, piping, and dispenser islands. lndicate the product in each tank. Show locations of tank manways and identify each: submersible pump (S), tank fill (R, ATG probe (A), interstitial probe (l), vapor recovery U), c+ped ptug (C), other (specfy). Comments: t\ -llt>\)\. fr//, sti/5*zl ffril't< aocoLsu4 Underground Storage Tank lnspection Verification Form Owner Name: TOOELE ARMY DEPOT Owncr Addrcss: 1 TOOELE ABtvIY DEPOT SJMTE CDN BLDG I TOOELE, UT 84074 Operator A: No Dala / No Data / - - -99"9 EI'3!l: iltd:!g!:on1 o.CilogTy.Ill -Dlsp ltVAIt Subslance UOC 'D Pipe Flex Facility lD: 8000208 Faclllty ilsme: Tooele Army Depot South Bulk Fuet Station Street Addrers: 11500 Sl,ark Boad STOCKTON, UT 84071 Operator B: No Data / No Data I _ulytoS!"1":Iry' j8e72jt:1si+]8!_ Gasolino Yes Steel Flex in Sump Diessl Yes Steel Flex in Sump 3 - Trans Dsl Diesel Y6s Steel Flex in Sump 4 - Trans Unl Gasoline Yes St6el Flex in Sump Loc lnstall Date UDC Install Date Fire S8tValve Present Yes No Yes No Yes No Yes No 1-1 2-2 $TP Sump Tert: CP Tank Test: UDC Test Dlep Fler CP Tert 51312023 5D5t2023 5t2512023 5P:5t2023 Splll Bk Test: Overllll Test: CP Pipe Teet: Tank lIVAlt lD: 1 / 5129A Slphor/Compart: No / No EGer/AST/Stat No i Yes I PWStagel: No Tank StaUc: Currsntly ln Us€ None lnetalled/Cay'Lw: 71111998 112000 / East Substance Slored: Diesel I Off-road Diosel Tank llaterlahilod: Asphalt Coaled or Bare Steel - Double-Walled ATG: / ATG Spece: / / ATG Test: LTT Test:LLD Test: Phe lraterlal-Mod: Bare Steel - None Plpe Type/ISTP ContFPlussurizutrftftr STP Flex Connectors: .€tccffffiomp- LLD ilodel: SpllllOverlllllsmdellv: i I tlo sro,'// /o,rX /q /.-- P1ST Fund/ifther Type: No / Exempt Tank/Flpe Rel Der: oTHER / OTHER / NONE ;tw Tank lIYAlt lD: 2 / 5129B Slphon/Compart: No / No EGen/ASTEtat No /Yes / Pwstagel: No Pipe lraterlal-Mod: Plpe Type/ISTP Cont: STP FIex Connectors: LLD Mode|: Splll0verlill/llm dellv: PST Fundlother Type: TanlnPlpe Rel Det: STP Sump Test: CP Tank Test: Flexible Plastic - Double-Walled Pressurized / Yes Steel Flex in Sump / /No 97;t/bu/q/r---t No / Exompt OTHER/OTHEB/NONE Splll BkTed: Overllll Teet; CP Plpe Test: Tank Strtus: Currenlly ln Use None lnctalledlCay'Loc: 7 11 11998 I 12000 / Cenler Substance S-tored: Diosol / Tank ilaierlahiiod: Asphall Coated or Bar€ Stsel - Doublo-Walled ATG: / ATG Spem: / / ATG Teat: LTTTeet:LLD Test: T.nk l[yAlt lD: 3 / 5129C EGen/AST/lStat No i Yes / Slphor/Compart: No / No PWstagel: Tank Status: Currently ln Use lnotalled/Ca/L*: 711 11998 I 1 2000 / West $rbetance Stored: Gasoline / Begular Tank llaterlal-ilod: Asphalt Coated or Bare Steel - Double-Walled ATG: / ATG Speca: / / ATG Tett: LTT TeIt: Plpe lr.terlal-Mod: Flexible Plastic - Double-Walled plpe TypeISTP Cont: Pressurized / Yes STP Flex Connector6: Steol Flex in Sump LLD Model: Spill/overllll^im dellv: i t tto -rl //6.v /o/-- PIST Fundlother Type: No / Exempt TanlriPlpe Rel tlet: OTHER / OTHER / NONE LLD TeEt: STP Sump Test: CP Tank Test: Splll Bk Test: Ovedlll Test: CP Plpe Teet: 41812024 Page 1 ofl Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name TOOELE ARMY DEPOT Address 1 TOOELE ARMY DEPOT SJMTE CDN BLDG 8 TOOELE, UT 84074 Contact TOOELE ARMY DEPOT Phone Email jay.d.nelson10.civ@army.mil TANK LOCATION Name Tooele Army Depot South Bulk Fuel Station Address 11500 Stark Road STOCKTON, UT 84071 A Operator None Phone None B Operator SAME Phone SAME Facility ID: 8000208 Inspection Date: 04/16/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1 Gasoline Yes Steel Flex in Sump None None Yes No May 3, 2023 None 2 - 2 Diesel Yes Steel Flex in Sump None None Yes No May 25, 2023 None 3 - Trans Dsl Diesel Yes Steel Flex in Sump None None Yes No May 25, 2023 None 4 - Trans Unl Gasoline Yes Steel Flex in Sump None None Yes No May 25, 2023 None TANK DETAILS Tank ID/Alt ID 1 / 5129A E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 1, 1998 / 12000 / East Substance Stored Diesel / Off-road Diesel Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod Bare Steel / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery / / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankLDNotListed PipeLDNotListed CP Tank Test None CP Pipe Test None 2024-04-16 Page 1 of 5 Tank ID/Alt ID 2 / 5129B E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 1, 1998 / 12000 / Center Substance Stored Diesel / Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod Flexible Plastic / Double- Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery / / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankLDNotListed PipeLDNotListed CP Tank Test None CP Pipe Test None Tank ID/Alt ID 3 / 5129C E-Gen/AST No / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 1, 1998 / 12000 / West Substance Stored Gasoline / Regular Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material-Mod Flexible Plastic / Double- Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery / / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankLDNotListed PipeLDNotListed CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-04-16 Page 2 of 5 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 5129A Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 5129B Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Tank 5129B Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 5129C Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 5129A Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Tank 5129A Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 5129B Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 5129C Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Tank 5129C Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes DISPENSER RESPONSES Dispenser 2 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-04-16 Page 3 of 5 Dispenser Trans Unl Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser Trans Dsl Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-04-16 Page 4 of 5 Prepared by fueloperator.com Inspection Information Inspector:Saathoff, Rick Record Created: April 16, 2024, 10:30 a.m. Inspection Date:April 16, 2024 2024-04-16 Page 5 of 5