Loading...
HomeMy WebLinkAboutDDW-2024-0071884/16/24, 10:55 AM State of Utah Mail - Cottonwood Mutual Water (Sys #15013); File 13645 - 400k Upper Tank https://mail.google.com/mail/u/0/?ik=211f337333&view=pt&search=all&permthid=thread-a:r491616342700134516&simpl=msg-a:r-115285771532201…1/2 Rebecca Yoo <ryoo@utah.gov> Cottonwood Mutual Water (Sys #15013); File 13645 - 400k Upper Tank 4 messages Rebecca Yoo <ryoo@utah.gov>Fri, Mar 22, 2024 at 4:27 PM To: jason@b-t-eng.com Cc: mike@cottonwoodwater.com Hello Jason, Thank you for filling out the checklist along with sending the plans and specifications for this project. It's always helpful to receive these checklists prior to our review. I have provided comments in column K and highlighted rows that require a response. Could you please provide your response in column L? My biggest comment concerns the inlet and outlet pipes, as they seem to share the same pipe prior to the vault. Where is the tank receiving flow from and conveying flow to? If you would like to discuss any of these comments, I would be happy to set up a meeting for us. Thank you! -- Rebecca Yoo, P.E. (she/her) Environmental Engineer III | Division of Drinking Water P: (801) 388-3594 Hours: M-F 8:30 am - 4:30 pm drinkingwater.utah.gov Checklist - Tank.xlsx 32K Jason Bradford <jason@b-t-eng.com>Wed, Apr 10, 2024 at 8:58 AM To: Rebecca Yoo <ryoo@utah.gov> Cc: "mike@cottonwoodwater.com" <mike@cottonwoodwater.com>, Raymond Nettleton <ray@rooftopdevelopers.com>, Tavis Timothy <tavis@b-t-eng.com> Rebecca, Please find attached the following for this project: updated Checklist (my responses are included in column L) updated, stamped drawings Hydraulic Analysis Certification jointly stamped by Dan White revised Section 33 16 16 (see comments in checklist) We have addressed all of your review comments and look forward to your favorable review of this project. Thanks Jason Bradford 4/16/24, 10:55 AM State of Utah Mail - Cottonwood Mutual Water (Sys #15013); File 13645 - 400k Upper Tank https://mail.google.com/mail/u/0/?ik=211f337333&view=pt&search=all&permthid=thread-a:r491616342700134516&simpl=msg-a:r-115285771532201…2/2 [Quoted text hidden] 4 attachments Checklist - Tank.xlsx 33K CMWC 400K UPPER TANK - DRAWINGS FOR DDW - 4-10-24.pdf 5163K DDW-2018-003104_stamped by both.pdf 642K 33 16 16 Concrete Water Storage Reservoir.pdf 168K Jason Bradford <jason@b-t-eng.com>Mon, Apr 15, 2024 at 2:07 PM To: Rebecca Yoo <ryoo@utah.gov> Cc: "mike@cottonwoodwater.com" <mike@cottonwoodwater.com>, Raymond Nettleton <ray@rooftopdevelopers.com>, Tavis Timothy <tavis@b-t-eng.com> Rebecca, Attached is the revised Detail 13 on Sheet D-1 that calls out the sloped curb away from the hatch opening. Let me know if you need anything else. Thanks Jason [Quoted text hidden] D1 TANK DETAILS-D1.pdf 336K Rebecca Yoo <ryoo@utah.gov>Mon, Apr 15, 2024 at 4:18 PM To: Jason Bradford <jason@b-t-eng.com> Cc: "mike@cottonwoodwater.com" <mike@cottonwoodwater.com>, Raymond Nettleton <ray@rooftopdevelopers.com>, Tavis Timothy <tavis@b-t-eng.com> Hi Jason, Thank you for the updated sheets and for receiving my call today. I apologize that my questions were a bit confusing-- I wanted to make sure I understood from a high level how the system would function. You mentioned that the pump would convey flow to the tank and not be directly connected to the distribution system. With no other pumps, sources, or tanks, I was wondering how water would flow to the distribution system when water is being pumped to the tank if there is a single transmission line. I understand that the pump and distribution system will be submitted separately but I wanted to understand the high level design. Please let me know if I misunderstood you and if a meeting would be better to discuss this. All the other comments look great and I will push the PA letter forward. Thank you! [Quoted text hidden]