Loading...
HomeMy WebLinkAboutDDW-2025-009116 September 29, 2025 Sent via Email Only Marie Owens Corp of the Presiding Bishop - LDS Church 50 East North Temple Street Room 1205 Salt Lake City, Utah 84150-6320 mowens@churchofjesuschrist.org Subject:Plan Approval, 10,000 Gal Fiberglass Tank 2 (ST003); J R Recreation Property, System #20071, File #25286 Dear Marie Owens:The Division of Drinking Water (the Division) received the plans and specifications for a new 10,000 Gallon Fiberglass Tank project from your consultant, Christen DeMille with CD Consulting Engineers on September 19, 2025. Written review comments were provided to your consultant on September 22, 2025, and the Division received the revised plans and specifications on September 24, 2025. This project has met the conditions for receiving a plan approval. Our understanding of the project is that several small individual concrete tanks, identified by the Division as Storage Tanks (ST001), will be abandoned and a new 10,000 Gal Fiberglass Tank 2 (ST003) will be installed adjacent to the existing 10,000 Gal Fiberglass Tank (ST002). New meters will be installed to accurately track the flow from the spring and the well. The well discharge piping will be replaced and have a new enclosure, as well as new control equipment to automatically operate the well. The new 10,000 Gal Fiberglass Tank 2 is identified as ST003 in the Division’s database. We have completed our review of the plans and specifications, stamped and signed by Christen A. DeMille, P.E., dated September 22, 2025, and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the new 10,000 Gal Fiberglass Tank 2are hereby approved. This approval pertains to construction only. An Operating Permit must be obtained from the Director before the 10,000 Gal Fiberglass Tank 2 may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter. If you have any questions regarding this approval, please contact John Chartier, P.E., DEQ Central District Engineer, at (435) 559-1969, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager JLC/mrn/mdbEnclosures –Operating Permit Checklistcc:Eric Larsen, Central Utah Public Health, elarsen@centralutahhealth.org Christen DeMille, P.E., CD Consulting Engineers, cdemille@cdce-utah.comMarie Owens, Church of Jesus Christ of Latter-Day Saints, mowens@churchofjesuschrist.org John Chartier, P.E., DEQ Central District Engineer, jchartier@utah.gov jchartier 20071 25286 PA ST003 Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment facility, or source