Loading...
HomeMy WebLinkAboutDDW-2025-009117Sanitary Survey - Deficiency Report PWS Number:UTAH20054 Deficiency Points:10 Survey Date:09/03/2025 Survey Name:FAIRVIEW LAKES DEVELOPMENT Surveyor:Dylan Martinez Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | FAIRVIEW SPRING 66. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes:No vent present but recommended Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | FAIRVIEW SPRING 67. Spring has a permanent flow-measuring device. Rule: R309-515-7(7)(h)Rule requires a spring to have a permanent flow measuring device. Notes:Spring lacks permanent flow measuring device Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS01 LACKS A PERMANENT DEVICE FOR MEASURING SPRING FLOW