HomeMy WebLinkAboutDRC-2025-002776Deq submit <dwmrcsubmit@utah.gov>
Fwd: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
1 message
LLRW DWMRC <llrw@utah.gov>Tue, Aug 26, 2025 at 8:24 AM
To: Deq submit <dwmrcsubmit@utah.gov>
DRC
---------- Forwarded message ---------
From: Carlo Romano <cromano@utah.gov>
Date: Mon, Aug 25, 2025 at 2:01 PM
Subject: Fwd: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
To: Larry Kellum <lkellum@utah.gov>, LLRW DEQ <llrw@utah.gov>
Good afternoon Larry,
Can you assign a DRC # for the email below?
Thanks,
Carlo Romano, PE
Environmental Engineer III
Division of Waste Management and Radiation Control
Phone: 385-977-7573 |
wasteandradiation.utah.gov
Emails to and from this email address may be considered public records and thus subject to
Utah GRAMA requirements.
Statements made in this email do not constitute the official position of the Director of the
Division of Waste Management and Radiation Control. If you desire a statement of the
Division Director’s position, please submit a written request to the Director, including copies of
documents relevant to your request.
---------- Forwarded message ---------
From: Carlo Romano <cromano@utah.gov>
Date: Wed, Aug 6, 2025 at 9:57 AM
Subject: Re: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
To: Shauna L. Watkins <slwatkins@energysolutions.com>
Cc: LLrw@utah.gov <LLrw@utah.gov>, James M. Cason <jmcason@energysolutions.com>, Marissa R. Sotelo
<mrsotelo@energysolutions.com>, Garrett Q. Dutson <gqdutson@energysolutions.com>, Todd L. Stewart
<tlstewart@energysolutions.com>, Dave Booth <dbooth@energysolutions.com>, Brennon Dick
<bdick@energysolutions.com>, Larry Kellum <lkellum@utah.gov>, Douglas Hansen <djhansen@utah.gov>
8/26/25, 10:38 AM State of Utah Mail - Fwd: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
https://mail.google.com/mail/b/AEoRXRQuX3VytON-a0kay-eCq1lzvhiFrTYJHykANwU0nXmaTOsG/u/0/?ik=adf9d5e615&view=pt&search=all&permthi…1/3
Good morning,
The Division of Waste Management and Radiation Control (Division) has received your request dated
August 4, 2025 for Request for Director Approval (RFA) in accordance with the LLRW and 11e.(2)
Construction Quality Assurance/Quality Control (CQA/QC) Manual (revision 28c) (CQA/QC Manual)
Specification 54 Director Approval and 48 Hour Notification for placement of next design layer over
finished Clay Liner.
A Division representative, Carlo Romano (writer), has conducted regular site visits to observe construction
earthwork operations, record overall progress, and review documentation. During these visits, specifications
were discussed with representatives of EnergySolutions to address requirements in the CQA/QC Manual that
are necessary for the RFA. As a result, physical documentation was provided to the Division during each site
visit and emailed intermittently between visits. This process ensured that all documentation was reviewed by
the Division in concurrence with construction.
Based on the site visits and the reviewed documentation, the construction and field testing of the Clay
Liner appear to be in accordance with the project specifications outlined in the CQA/QC Manual. The
constructed Clay Liner is hereby approved and EnergySolutions may continue placing material atop this
lift. All other specifications concerning construction and post-construction of the Clay Liner as presented in
the referenced plans and specifications remain applicable and are required to be followed.
Please contact me if you have any questions or concerns.
Thank you,
Carlo Romano, PE
Environmental Engineer III
Division of Waste Management and Radiation Control
Phone: 385-977-7573 |
wasteandradiation.utah.gov
Emails to and from this email address may be considered public records and thus subject to
Utah GRAMA requirements.
Statements made in this email do not constitute the official position of the Director of the
Division of Waste Management and Radiation Control. If you desire a statement of the
Division Director’s position, please submit a written request to the Director, including copies of
documents relevant to your request.
On Mon, Aug 4, 2025 at 11:15 AM Shauna L. Watkins <slwatkins@energysolutions.com> wrote:
All,
In accordance with the EnergySolutions LLRW and 11e.(2) CQA/QC Manual Revision 28c, Specification 54) Director
Approval, EnergySolutions hereby submits the 48hour advance notice of intent to cover with soil protective cover
material on 2025 ES PH3E Clay liner.
8/26/25, 10:38 AM State of Utah Mail - Fwd: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
https://mail.google.com/mail/b/AEoRXRQuX3VytON-a0kay-eCq1lzvhiFrTYJHykANwU0nXmaTOsG/u/0/?ik=adf9d5e615&view=pt&search=all&permthi…2/3
Please feel free to contact me if you have any questions or concerns regarding this notification.
SHAUNA WATKINS
Quality Assurance Specialist II
ENERGYSOLUTIONS LLC
2235 S Saltbush Rd
Grantsville, Ut 84029
O: 801-649-2072
C: 435-882-7841
slwatkins@energysolutions.com
8/26/25, 10:38 AM State of Utah Mail - Fwd: LLRW and 11e.(2) CQA/QC Manual Specification 54) Director Approval
https://mail.google.com/mail/b/AEoRXRQuX3VytON-a0kay-eCq1lzvhiFrTYJHykANwU0nXmaTOsG/u/0/?ik=adf9d5e615&view=pt&search=all&permthi…3/3