Loading...
HomeMy WebLinkAboutDDW-2025-008615 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Tim Davis Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, Ph.D., P.E. Director of Drinking Water May 29, 2025 Doneva Hecker New Harmony Water PO Box 620 New Harmony, UT 84757 Dear Doneva Hecker: Subject: Corrective Action Plan Closure UTAH27011-2025-01 On August 21, 2024, New Harmony Water and the Division of Drinking Water entered into a Corrective Action Plan (CAP). As of May 29, 2025, New Harmony Water has successfully completed the requirements listed in the CAP. The CAP is now officially closed, and the water system’s rating will remain at an approved status with 90 Improvement Priority System (IPS) points. The Division of Drinking Water recognizes that addressing deficiencies and violations can be difficult and often requires significant financial and personnel resources. We would like to thank New Harmony Water for the efforts put forth in resolving the items, for your continued commitment to maintaining reliable infrastructure, and for ensuring the safety of the drinking water provided to your customers. Please find enclosed current copies of the completed CAP requirements, monitoring schedule, and IPS report to help New Harmony Water maintain compliance and an approved status. If you have any questions, please contact Brandi Smith at (385) 515-1650 or brandismith@utah.gov. If there is ever anything we can do to support you in your role of protecting public health, please contact us. Sincerely, Helen Lau Compliance and Operator Assistance Section Manager Division of Drinking Water Enclosure Helen Lau (Jun 3, 2025 10:25 MDT) State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Tim Davis Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, Ph.D., P.E. Director of Drinking Water Completed CAP Requirements Deficiency/Violation Date of Occurrence Plan to return to compliance Date of Completion IPS Points Resolved SS14-WS002 Spring box overflow or drain lacks a free fall of 12-24 inches 08/2024 Ensure that there is a free fall of 12-24 inches on the spring box overflow/drain 05/28/2025 25 SS07-WS002 Deep rooted vegetation in the spring collection area 08/2024 Ensure that all the deep- rooted vegetation has been removed from the spring collection area 05/28/2025 25