Loading...
HomeMy WebLinkAboutDDW-2025-008535Sanitary Survey - Deficiency Report PWS Number:UTAH09089 Deficiency Points:55 Survey Date:09/11/2025 Survey Name:TURN ABOUT RANCH Surveyor:J. Paul Wright Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH09089 DISTRIBUTION SYSTEM 38. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. Notes:Lenza, a new operator needs to take Backflow 101. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | TURN ABOUT WELL #2 63. Water level is measured and recorded periodically Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the completed well. Notes:No, water system does not record water levels in the well. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | TURN ABOUT WELL #2 69. Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) Notes:There was a hose bib, but not a smooth nosed sample tap. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S023 NO SMOOTH NOSED SAMPLING TAP ON DISCHARGE PIPING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | TURN ABOUT WELL #2 71. Well discharge line has a pressure gauge. Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. Notes:There was not a pressure gauge on the discharge pipe from the well. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S025 NO PRESSURE GAUGE ON WELL DISCHARGE PIPING Sanitary Survey Category: FW SDWIS Severity Code: Significant Deficiency Storage Tanks | ST001 | TANK 1 82C. Vent covered with #14 or finer non-corrodible mesh screen. Rule: R309-545-15(4)Rule requires a water storage tank vent to be fitted with #14 mesh or finer non- corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. Notes:Air Vent has been removed and needs to be replaced Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: V007 STORAGE TANK VENT LACKS NO. 14 SCREEN