Loading...
HomeMy WebLinkAboutDDW-2025-008467Level 2 Assessment - Deficiency Report PWS Number:UTAH17035 Deficiency Points:30 Survey Date:07/01/2025 Survey Name:BEAR LAKE PARK - NORTH EDEN CAMPGROUND Surveyor:Keri Moya Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS001 | NORTH EDEN CAMPGROUND WELL 105. Water level is measured and recorded periodically Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the completed well. Notes:No means to measure well. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY Sanitary Survey Category: PU SDWIS Severity Code: Significant Deficiency Pump Stations | PF001 | NORTH EDEN PUMP STATION 147. If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) Rule: R309-540-5(4)(b)Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Second pump is under repair Deficiency Points: 25 Days until points become effective on IPS: 30 SDWIS Deficiency Description: PS18 IN-LINE BOOSTER PUMP STATION LACKS REDUNDANCY TO MEET PEAK DEMAND WITH ONE PUMP OUT OF SERVICE