Loading...
HomeMy WebLinkAboutDERR-2025-006523VCP/BROWNFIELDS SECTION – SITE VISIT REPORT SITE NAME: Murray UTA Lots/Firestation DATE: August 28, 2025 PROJECT MANAGER: Leigh Anderson PURPOSE OF VISIT: Conduct annual site inspection for the SMP, inspecting repository cap in parking lot, foundations of buildings, landscaping and cobble slope armor around retention basin, and VMS risers on roof. sidewalks, and foundations. Risers also had valves open and meet s south of retention basin has lost some of the cobble armor and the black geo fabric is exposed in some locations. SPLIT SAMPLES COLLECTED? YES NO COMMENTS: YES NO COMMENTS: ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO South along Box Elder Street. Southernmost parcel still undeveloped. Cell tower south of fire station. Area with thin cobble armoring south of retention basin, some of the geofabric is exposed.