HomeMy WebLinkAboutDDW-2025-007612Sanitary Survey - Deficiency Report
PWS Number:UTAH23056 Deficiency Points:35 Survey Date:07/15/2025
Survey Name:IBAPAH LDS CHURCH Surveyor:Hunter Payne
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH23056 DISTRIBUTION SYSTEM
40. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:System was not able to provide test reports for their BF device. They've put in a work order
to have the device inspected and added it to their regular inspection schedule.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | CHURCH WELL
63. Water level is measured and recorded periodically
Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the
completed well.
Notes:No level sensor or program to periodically measure water level.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | CHURCH WELL
70. Well discharge line has a check valve.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:No check valve
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S024 NO CHECK VALVE ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | CHURCH WELL
71. Well discharge line has a pressure gauge.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:No pressure gauge
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S025 NO PRESSURE GAUGE ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | CHURCH WELL
72. Well discharge line has a means to measure flow.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:No flow meter
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S026 NO FLOW METER ON WELL DISCHARGE PIPING