Loading...
HomeMy WebLinkAboutDDW-2025-007586Sanitary Survey - Deficiency Report PWS Number:UTAH20017 Deficiency Points:45 Survey Date:07/16/2025 Survey Name:FERRON RESERVOIR CAMPGROUND Surveyor:Sitara Federico Sanitary Survey Category: SM SDWIS Severity Code: Recommendation Management and Operations | DS001 | UTAH20017 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Notes: Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | SPRING #1 58. Area of equal or higher elevation within 50 feet of spring collection devices is fenced. Rule: R309-515-7(7)(e)Rule requires a stock-tight fence around the spring collection area. Notes:No fence or exception for not having a fence Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS02 SPRING COLLECTION AREA NOT FENCED Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | SPRING #1 66. Is a spring collection box present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(c)Rule requires each spring collection area to be provided with at least one collection box to permit spring inspection and testing. Notes:Still deficient per last sanitary survey Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: L014 SPRING COLLECTION BOX NOT PRESENT Sanitary Survey Category: FW SDWIS Severity Code: Significant Deficiency Storage Tanks | ST001 | FIBERGLASS TANK 81A. Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? Rule: R309-545-13 Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. Notes:Not 12 inches above ground Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: V011 END OF STORAGE TANK OVERFLOW LACKS A CLEARANCE OF BETWEEN 12 AND 24 INCHES FROM GROUND SURFACE