Energy Solutions / 2025 ES PH3E Liner Schedule Act ID Activity Description Orig Dur Rem Dur Early Start Early Finish % 02 JUN 2025 09 JUL 16 AUG 23 30 07 14 21 28 04 11 18 25 10 Total Calendar Days 57 *15 *10JUN25 A 06AUG25 74 20 Pre-Construction Meeting 0 0 09JUN25 A 100 30 Mobilization Project Support Equipment 4 0 10JUN25 A 16JUN25 A 100 40 Mine and Prepare Clay Liner Material 10 0 16JUN25 A 27JUN25 A 100 50 Establish Foundation Surface 3 0 30JUN25 A 03JUL25 A 100 60 Install Lysimeter Components 12 3 08JUL25 A 29JUL25 75 70 Clay Liner Load, Haul, Place, and Compact 7 4 16JUL25 A 31JUL25 50 80 Clay Liner Finish Grading 2 2 30JUL25 01AUG25 0 90 Berm Construction 2 2 01AUG25 05AUG25 0 100 Install Control Fence 2 2 04AUG25 06AUG25 0 110 Project Completed & Accepted 0 0 06AUG25 0 Total Calendar Days Pre-Construction Meeting Mobilization Project Support Equipment Mine and Prepare Clay Liner Material Establish Foundation Surface Install Lysimeter Components Clay Liner Load, Haul, Place, and Compact Clay Liner Finish Grading Berm Construction Install Control Fence Project Completed & Accepted Early start point Early finish pointEarly barProgress bar Critical barSummary barProgress point Critical pointSummary pointStart milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 23JUL25 D.Cummings KC/SM DC 15JUL25 D.Cummings KC/SM DC 08JUL25 D.Cummings KC/SM DC 30JUN25 D.Cummings KC/SM DC Start date 02JUN25 Finish date 06AUG25 Data date 23JUL25 Run date 23JUL25 Page number 1A © Primavera Systems, Inc.