HomeMy WebLinkAboutDRC-2025-002304Deq submit <dwmrcsubmit@utah.gov>
Fwd: BAT Concern, NWC Pond Average Leakage Rate Exceedance
1 message
LLRW DWMRC <llrw@utah.gov>Tue, Jul 22, 2025 at 8:46 AM
To: Deq submit <dwmrcsubmit@utah.gov>
DRC
---------- Forwarded message ---------
From: Mathew R. Schon <mrschon@energysolutions.com>
Date: Mon, Jul 21, 2025 at 2:15 PM
Subject: BAT Concern, NWC Pond Average Leakage Rate Exceedance
To: LLRW DEQ <llrw@utah.gov>
Cc: Karen Kirkwood <kxkirkwood@energysolutions.com>, Joe Riley <jriley@energysolutions.com>, Roger Ekins
<rekins@energysolutions.com>
To: Division of Waste Management and Radiation Control (DWMRC)
Today’s BAT inspection determined the NWC Pond leak detection system pumped 3,926 gallons. This volume indicates
the pond will exceed the initial action level (300 gpd) and allowable average daily leakage rate (326 gpd) for this week.
In accordance with GWQDP Appendix K, Part 4.1.5, within 7 days of today’s discovery, EnergySolutions will provide
written notification of the calculated average daily leakage rate for this week.
Sincerely,
Mat Schon, PG
Manager, Groundwater and Environmental Program
ENERGYSOLUTIONS
Cell: 717-818-9774
Office: 801-649-2060
mrschon@energysolutions.com
7/22/25, 10:40 AM State of Utah Mail - Fwd: BAT Concern, NWC Pond Average Leakage Rate Exceedance
https://mail.google.com/mail/b/AEoRXRQKJ1-8jdmaQr6evNd-eCOeyVBOTk1UXClj00qi0CUzgVZE/u/0/?ik=adf9d5e615&view=pt&search=all&permthi…1/1