Loading...
HomeMy WebLinkAboutDERR-2025-005566VCP/BROWNFIELDS SECTION – SITE VISIT REPORT SITE NAME: Alta Gateway DATE: July 21, 2025 PROJECT MANAGER: Leigh Anderson PURPOSE OF VISIT: Annual Site Inspection under the SMP FIELD OBSERVATIONS: Met with staff at the Alta Gateway 505 apartment building at 12:15 and headed up to the roof. Vents and risers were in good condition though some risers used a different type of cap that did not have turbines built in, and I am unsure whether these will have the same effectiveness or if they have turbines further down in the system or some other way of moderating pressure. I would recommend talking to the original installers to verify. SPLIT SAMPLES COLLECTED? YES NO COMMENTS: IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? YES NO COMMENTS: ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO Please see electronic file. Front Office of building Sidewalk along north face of building. No excavation, construction, or utilities work requiring excavation noted. Rooftop view Riser construction matching the specs included in the SMP. V-4 riser with a different cap from the SMP Specs. V-8 riser with a different cap from the SMP specs.