HomeMy WebLinkAboutDERR-2025-005566VCP/BROWNFIELDS SECTION – SITE VISIT REPORT
SITE NAME: Alta Gateway DATE: July 21, 2025
PROJECT MANAGER: Leigh Anderson
PURPOSE OF VISIT: Annual Site Inspection under the SMP
FIELD OBSERVATIONS: Met with staff at the Alta Gateway 505 apartment building at 12:15 and headed
up to the roof. Vents and risers were in good condition though some risers used a different type of cap that
did not have turbines built in, and I am unsure whether these will have the same effectiveness or if they
have turbines further down in the system or some other way of moderating pressure. I would recommend
talking to the original installers to verify.
SPLIT SAMPLES COLLECTED?
YES NO COMMENTS:
IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN?
YES NO COMMENTS:
ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO Please see electronic file.
Front Office of building
Sidewalk along north face of building. No excavation, construction, or utilities work requiring
excavation noted.
Rooftop view
Riser construction matching the specs included in the SMP.
V-4 riser with a different cap from the SMP Specs.
V-8 riser with a different cap from the SMP specs.