HomeMy WebLinkAboutDERR-2025-005515Leak Detector
Facility Information
Name:Sunmart 978 Certification/Inspection #:63283
Address:1881 CALIFORNIA AVE, Salt Lake City, UT, 84104 State ID:4002128
Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025
Tank Information
Tank #:T1 DSL T2 RUL T3 PUL
Capacity:30000 12000 12000
Product:Diesel Unleaded Premium
Line #:1 DSL 2 RUL 3 PUL 10 - 12 Truck DSL
Line Type:Pressure Pressure Pressure Pressure
LD Brand:Red Jacket Red Jacket Red Jacket Red Jacket
LD Model:FX1DV FX1V FX1V FX1DV
Serial #:0 0 0 0
Associated Tank:T1 DSL T2 RUL T3 PUL T1 DSL
Resiliency (ml):200 100 150 250
Check Valve Holding PSI:20 27 21 25
Opening Time:2 2 2 1
Result:Pass Pass Pass Pass
Test Equip. Mfg.:Vaporless, LDT-890 Vaporless, LDT-890 Vaporless, LDT-890 Vaporless, LDT-890
Notes:
Tested per manufacturer specifications.
Contractor Signature:Printed Name:Larry Vasquez
Line Test
Facility Information
Name:Sunmart 978 Certification/Inspection #:63282
Address:1881 CALIFORNIA AVE State ID:4002128
Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025
Tank Test Information
Tank #:T1 DSL T2 RUL T3 PUL
Capacity:30000 12000 12000
Product:Diesel Unleaded Premium
Line Test Information
Line #:1 DSL 2 RUL 3 PUL 10 - 12 Truck DSL 13 and 14 DSL
LineType:Pressure Pressure Pressure Pressure Pressure
Line Material:DW Flex DW Flex DW Flex DW Flex DW Flex
Line ID Size (in):2 2 2 2 2
Line Length (ft):150 150 150 150 150
Pump Type:Red Jacket Red Jacket Red Jacket Red Jacket Red Jacket
Associated Tank:T1 DSL T2 RUL T3 PUL T1 DSL T1 DSL
Test Equip. Mfg.:Triangle Triangle Triangle Triangle Triangle
Test Pressure (PSI):50 50 50 50 50
Initial Cyl. Level:140 460 130 140 430
Final Cyl. Level:140 450 90 140 430
Change in Time (mins):15 15 15 15 15
Change in Vol:0.0000 -10.0000 -40.0000 0.0000 0.0000
Change in Temp (F):0 0 0 0 0
Coeff. Of Thermal Expansion (g/F):0.00045 0.00045 0.00070 0.00045 0.00045
Line Vol (gal):24.47 24.47 24.47 24.47 24.47
Leak Rate (GPH):0.0000 -0.0106 -0.0423 0.0000 0.0000
Result:Pass Pass Pass Pass Pass
Notes
TIGHTNESS TESTING CERTIFICATION
CGRS certifies that the systems in the above table have been tested utilizing leak detection methods which meet the prescribed leak rate testing standard of 0.10
gph with a minimum probability of detection of 95% and a 5% probability of a false alarm. CGRS further certifies that the protocol for each test method was strictly
adhered to, and that all precision tightness testing performed by CGRS was conducted in accordance with EPA 40 CFR parts 280.43(c) and 280.44(b) and the
National Fire Protection Association, Bulletin NFPA 329 criteria.
Contractor Printed Name:Larry Vasquez Contractor Signature:
Certification Number:TMI-301,TL-2025-T-002
UST Overfill Equipment Inspection
Facility Information
Name:Sunmart 978 Certification/Inspection #:63293
Address:1881 CALIFORNIA AVE, Salt Lake City, UT, 84104, Salt
Lake City, UT, 84104
State ID:4002128
Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025
Tank Information
1.Tank #T1 DSL T2 RUL T3 PUL
2.Tank Facility ID T1 DSL T2 RUL T3 PUL
3.Product Diesel Unleaded Premium
4.Nominal Capacity, gallons 30000 12000 12000
5.Actual Capacity, gallons 28916 11608 11608
6.Req. Shutoff %95 95 95
7.Calculated Shutoff Vol., gallons 28482.90 11027.60 11027.60
8.Calculated Shut-off Level, inches 107.87 81.37 81.37
9.Drop Tube Length, inches 146.25 124 119.5
10.Top of Droptube to Shutoff Level, inches 44.25 48.25 43.82
11.Tank Dia/depth, inches 119 92 92
12.Riser Length, inches 33 35.5 33.12
13.Measured Shut-off Level, inches 107.75 79.25 81.3
14.Overfill Prevention Device Brand OPW OPW OPW
15.Overfill Type Drop Tube Flapper
valve
Drop Tube Flapper
valve
Drop Tube Flapper
valve
Automatic Shutoff Device Inspection
16.Drop tube removed from tank?Yes Yes Yes
17.Drop tube and float mechanisms are free of debris?Yes Yes Yes
18.Float moves freely without binding and poppet moves into flow path?Yes Yes Yes
19.Bypass valve in the drop tube is open and free of blockage (if present)?Yes Yes Yes
20.Flapper is adjusted to shut off flow at required shutoff capacity?Yes Yes Yes
Ball Float Valve Inspection
21.Tank top fittings are vapor-tight and leak-free?NA NA NA
22.Ball float cage free of debris?NA NA NA
23.Ball is free of holes and cracks and moves freely in cage?NA NA NA
24.Vent hole in pipe is open and near top of tank?NA NA NA
25.Ball float pipe is proper length to restrict flow at required shutoff capacity?Yes NA NA
26.Test Result Pass Pass Pass
Manufacture's suggested procedures were used.
Comments
Operator Certification
Contractor Printed Name:Larry Vasquez Contractor Signature:
Certification Number: