Loading...
HomeMy WebLinkAboutDERR-2025-005515Leak Detector Facility Information Name:Sunmart 978 Certification/Inspection #:63283 Address:1881 CALIFORNIA AVE, Salt Lake City, UT, 84104 State ID:4002128 Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025 Tank Information Tank #:T1 DSL T2 RUL T3 PUL Capacity:30000 12000 12000 Product:Diesel Unleaded Premium Line #:1 DSL 2 RUL 3 PUL 10 - 12 Truck DSL Line Type:Pressure Pressure Pressure Pressure LD Brand:Red Jacket Red Jacket Red Jacket Red Jacket LD Model:FX1DV FX1V FX1V FX1DV Serial #:0 0 0 0 Associated Tank:T1 DSL T2 RUL T3 PUL T1 DSL Resiliency (ml):200 100 150 250 Check Valve Holding PSI:20 27 21 25 Opening Time:2 2 2 1 Result:Pass Pass Pass Pass Test Equip. Mfg.:Vaporless, LDT-890 Vaporless, LDT-890 Vaporless, LDT-890 Vaporless, LDT-890 Notes: Tested per manufacturer specifications. Contractor Signature:Printed Name:Larry Vasquez Line Test Facility Information Name:Sunmart 978 Certification/Inspection #:63282 Address:1881 CALIFORNIA AVE State ID:4002128 Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025 Tank Test Information Tank #:T1 DSL T2 RUL T3 PUL Capacity:30000 12000 12000 Product:Diesel Unleaded Premium Line Test Information Line #:1 DSL 2 RUL 3 PUL 10 - 12 Truck DSL 13 and 14 DSL LineType:Pressure Pressure Pressure Pressure Pressure Line Material:DW Flex DW Flex DW Flex DW Flex DW Flex Line ID Size (in):2 2 2 2 2 Line Length (ft):150 150 150 150 150 Pump Type:Red Jacket Red Jacket Red Jacket Red Jacket Red Jacket Associated Tank:T1 DSL T2 RUL T3 PUL T1 DSL T1 DSL Test Equip. Mfg.:Triangle Triangle Triangle Triangle Triangle Test Pressure (PSI):50 50 50 50 50 Initial Cyl. Level:140 460 130 140 430 Final Cyl. Level:140 450 90 140 430 Change in Time (mins):15 15 15 15 15 Change in Vol:0.0000 -10.0000 -40.0000 0.0000 0.0000 Change in Temp (F):0 0 0 0 0 Coeff. Of Thermal Expansion (g/F):0.00045 0.00045 0.00070 0.00045 0.00045 Line Vol (gal):24.47 24.47 24.47 24.47 24.47 Leak Rate (GPH):0.0000 -0.0106 -0.0423 0.0000 0.0000 Result:Pass Pass Pass Pass Pass Notes TIGHTNESS TESTING CERTIFICATION CGRS certifies that the systems in the above table have been tested utilizing leak detection methods which meet the prescribed leak rate testing standard of 0.10 gph with a minimum probability of detection of 95% and a 5% probability of a false alarm. CGRS further certifies that the protocol for each test method was strictly adhered to, and that all precision tightness testing performed by CGRS was conducted in accordance with EPA 40 CFR parts 280.43(c) and 280.44(b) and the National Fire Protection Association, Bulletin NFPA 329 criteria. Contractor Printed Name:Larry Vasquez Contractor Signature: Certification Number:TMI-301,TL-2025-T-002 UST Overfill Equipment Inspection Facility Information Name:Sunmart 978 Certification/Inspection #:63293 Address:1881 CALIFORNIA AVE, Salt Lake City, UT, 84104, Salt Lake City, UT, 84104 State ID:4002128 Phone Number:Form Completed By:Larry Vasquez Date:06/02/2025 Tank Information 1.Tank #T1 DSL T2 RUL T3 PUL 2.Tank Facility ID T1 DSL T2 RUL T3 PUL 3.Product Diesel Unleaded Premium 4.Nominal Capacity, gallons 30000 12000 12000 5.Actual Capacity, gallons 28916 11608 11608 6.Req. Shutoff %95 95 95 7.Calculated Shutoff Vol., gallons 28482.90 11027.60 11027.60 8.Calculated Shut-off Level, inches 107.87 81.37 81.37 9.Drop Tube Length, inches 146.25 124 119.5 10.Top of Droptube to Shutoff Level, inches 44.25 48.25 43.82 11.Tank Dia/depth, inches 119 92 92 12.Riser Length, inches 33 35.5 33.12 13.Measured Shut-off Level, inches 107.75 79.25 81.3 14.Overfill Prevention Device Brand OPW OPW OPW 15.Overfill Type Drop Tube Flapper valve Drop Tube Flapper valve Drop Tube Flapper valve Automatic Shutoff Device Inspection 16.Drop tube removed from tank?Yes Yes Yes 17.Drop tube and float mechanisms are free of debris?Yes Yes Yes 18.Float moves freely without binding and poppet moves into flow path?Yes Yes Yes 19.Bypass valve in the drop tube is open and free of blockage (if present)?Yes Yes Yes 20.Flapper is adjusted to shut off flow at required shutoff capacity?Yes Yes Yes Ball Float Valve Inspection 21.Tank top fittings are vapor-tight and leak-free?NA NA NA 22.Ball float cage free of debris?NA NA NA 23.Ball is free of holes and cracks and moves freely in cage?NA NA NA 24.Vent hole in pipe is open and near top of tank?NA NA NA 25.Ball float pipe is proper length to restrict flow at required shutoff capacity?Yes NA NA 26.Test Result Pass Pass Pass Manufacture's suggested procedures were used. Comments Operator Certification Contractor Printed Name:Larry Vasquez Contractor Signature: Certification Number: