Split Samples Collected: No
Is the work being performed in a manner consistent with the accepted workplan? Yes
SUMMARY: DERR met with Terracon on-site to oversee the trenching and sampling activities
as part of site characterization. This is the third day of site work; however, the DERR did not visit
the Site the previous day due to the state holiday. Terracon and the contractor only had a few test
pits remaining to dig, which were primarily located on the eastern portion of the property.
When DERR arrived, they were backfilling TP-15, located on the east side, just north of Phase I.
DERR oversaw TP-16, 17, and 22 on that eastern side, where no debris was observed in the fill
and native soil was located at approximately 2-3 feet below ground surface. No groundwater was
encountered for these samples. The fill and native material were screened with a PID, and soil
samples collected in accordance with the Workplan.
The DERR also oversaw TP-13, which is located closer to the slopes of the landfill. Minor amounts
of debris/trash were observed. Possible roofing shingles were observed in the fill and Terracon
bagged the pieces to run for asbestos. Terracon expressed that this was the first sample collected
so far for asbestos. Jill Hernandez with Terracon arrived at approximately 9:40 AM.
When the DERR left, only two of the thirty test pits remained for soil samples (TP-17 and TP-11).
The northern portion of the site was completed the day prior. Terracon expressed that debris was
observed in the northwest corner, but primarily consisted of concrete, rocks, and bricks.
DERR left the Site at 10:10 AM.
PHOTO LOG:
Photo 1: Backfilling for TP-15.
Photo 2: TP-16 trench.
Photo 3: TP-17 trench.
Photo 4: TP-22 trench.
Photo 5: TP-13 trench.
Photo 6: TP-13 fill with possible roofing shingles (bagged for asbestos sampling).